PS FS DDCV DCV RPBFP FROM FRM BELOW BEL ABOVE ABV IAPMO INTERNATIONAL ASSOCIATION OF PV PLUG VALVE UNION UN COMPRESSED AIR CA SIEMESE FIRE DEPT. CONN. VTR VENT THROUGH ROOF REVOLUTIONS PER MINUTE RPM MFR MANUFACTURER FIXTURE UNIT (FU) FO FUEL OIL DRAIN D CONTRACTOR CONTR CO CLEANOUT CAST IRON CI AUTOMATIC WET SPRINKLER RISER SOLENOID VALVE WEIGHT WGT VACUUM BREAKER VB THRUST BLOCK TB PSI POUNDS PER SQUARE INCH OFCI OWNER FURNISHED CONTRACTOR NFPA NATIONAL FIRE PROTECTION NUMBER NO. THOUSANDS BTU/HR MBH POUNDS OR NUMBER # POUNDS (UNIT OF FORCE) LBS HOT WATER FIXTURE UNIT HWFU GALLONS PER MINUTE GALLONS PER HOUR GPM GPH GAS G FLEXIBLE CONNECTION FC FEET PER SECOND FPS DRAINAGE WASTE AND VENT DWV ARCHITECT ARCH CUBIC FEET PER HOUR CFH CUBIC FEET PER MINUTE CFM CONTINUATION CONT ABOVE FINISHED FLOOR AFF DOWN DN ELEC ELECTRICAL HW HOT WATER MECHANICAL MECH PLBG PLUMBING SPRINKLER SPR WASTE W SD STORM DRAIN VENT V TYPICAL TYP PT POINT OF CONNECTION POC NOT IN CONTRACT NIC NORMALLY OPEN N.O. NORMALLY CLOSED N.C. MINIMUM MIN MAXIMUM MAX INVERT ELEVATION I.E. GATE VALVE GV HORSEPOWER HP FLOOR FLR FINISHED FIN DOWNSPOUT NOZZLE DSN DIAMETER DIA COLD WATER FIXTURE UNIT CW(FU) CONDENSATE DRAIN CD BRAKE HORSEPOWER BHP ACCESS PANEL AP EXIST EXISTING MH MANHOLE CFF CAP FOR FUTURE BV BALL VALVE BFV BUTTERFLY VALVE BWV BACKWATER VALVE CLG CEILING HD HUB DRAIN TT TEST TEE CHECK VALVE CV DCVA DOUBLE CHECK VALVE ASSEMBLY DDCVA DOUBLE DETECTOR CHECK REDUCED PRESSURE PRINCIPLE RPBFP W/ WITH AFG ABOVE FINISHED GRADE AD ACCESS DOOR CONC CONCRETE FA FLOW ALARM FDVC FH FIRE DEPARTMENT VALVE CABINET FIRE HYDRANT ICBO INTERNATIONAL CONFERENCE OF PS PRESSURE SWITCH PRESSURE TEMPERATURE TRAP SOV SHUT-OFF VALVE LUBRICATED PLUG VALVE LP AMERICANS WITH DISABILITIES ADA BTU BRITISH THERMAL UNIT CFS CUBIC FEET PER SECOND CW COLD WATER DFU DRAINAGE FIXTURE UNIT HWR HOT WATER RECIRC DWG DRAWING MISCELLANEOUS EQUIPMENT IW INDIRECT WASTE HOT WATER (140°F) AUTOMATIC WET SPRINKLER AS HUB DRAIN FLOOR SINK W/ GRATE AS SHOWN FLOOR DRAIN FIRE ALARM BELL FIRE DEPARTMENT VALVE CABINET FIRE DEPARTMENT VALVE AUTO FIRE SPRINKLER RISER FIRE DEPARTMENT CONNECTION THRUST BLOCK YH HB WH YARD HYDRANT SYMBOL DESCRIPTION WALL HYDRANT HOSE BIBB BALL VALVE ECCENTRIC REDUCER PIPING BELOW GRADE SANITARY SEWER, WASTE OR SOIL BELOW GRADE OR FLOOR SAN PIPE DROP PUMPED DISCHARGE PD D OD RD SD F DRAIN LINE OVERFLOW DRAIN PIPING VENT WASTE, OR SOIL ABOVE GRADE OR FLOOR STORM DRAIN HOT WATER CIRC (122°F) COLD WATER FIRE MAIN BOTTOM CONNECTION - BRANCH LINE TOP CONNECTION - BRANCH LINE PIPE DOWN PIPE UP OR UP & DN DIRECTION OF FLOW DIRECTION OF SLOPE AUTOMATIC AIR VENT TEST TEE YARD CLEANOUT FLOOR CLEANOUT CLEANOUT/WALL CLEANOUT THERMOMETER PRESSURE GAUGE WITH COCK WATER HAMMER ARRESTOR AQUASTAT CONCENTRIC REDUCER BLIND FLANGE CAP OR PLUG FLEXIBLE CONNECTOR EXPANSION JOINT PIPE ALIGNMENT GUIDE PIPE ANCHOR STRAINER WITH BLOW OFF STRAINER UNION FLOW ALARM PRESSURE SWITCH REDUCED PRESSURE BACKFLOW PREVENTER DOUBLE CHECK VALVE ASSEMBLY DOUBLE DETECTOR CHECK VALVE ASSEMBLY OS & Y GATE VALVE WITH TAMPER SWITCH BACKWATER VALVE CIRCUIT SETTER VACUUM RELIEF VALVE RELIEF VALVE PRESSURE REDUCING VALVE LUBRICATED PLUG VALVE ANGLE GATE VALVE GATE VALVE PRESSURE & TEMPERATURE RELIEF VALVE CHECK VALVE BUTTERFLY VALVE SYMBOL DESCRIPTION GW GREASE WASTE HOT WATER CIRC (110°F) HOT WATER (120°F) 140 140 G NATURAL GAS (7"W.C.) FLOOR CLEANOUT FCO WCO WALL CLEANOUT OIL WASTE OW TP TRAP PRIMER MEDIUM PRESSURE GAS (2 PSIG TO 5 PSIG) MG CS CIRCUIT SETTER WET STANDPIPE RISER FS FD AUTOMATIC SPRINKLER DRAIN PLUMBING EQUIPMENT ICW INDUSTRIAL COLD WATER EXISTING PIPE (E) # SHEET NOTE POINT OF CONNECTION TAMPER SWITCH TS ROUGH IN AND CONNECT RI&C FIRE DEPARTMENT VALVE FDV EXISTING TO BE REMOVED ASD WSP AS WATER HAMMER ARRESTOR WHA OS & Y GATE VALVE (OUTSIDE SCREW & YOKE GATE VALVE) FIRE SPRINKLER FLOOR CONTROL VALVE FIRE HOSE VALVE OVERFLOW DRAIN ROOF DRAIN ROOF RECEPTOR FLOW SWITCH DECK DRAIN, PLANTER DRAIN TRAP PIMER 1% SLOPE ROOF DRAIN PIPING, THE PIPES FROM ROOF DRAIN SD (STORM DRAIN) LOW PRESSURE GAS LG IHW INDUSTRIAL HOT WATER TW TWR TEMPERED WATER TEMPERED WATER RETURN DETAIL NO. SHEET NO. 1 P2 CONN CONNECTION FEET FT FUTURE FUT FLUSH VALVE FV FLUSH TANK FT ACT VALVE ASSEMBLY PLUMBING AND MECHANICAL BUILDING OFFICIALS IRRIGATION I.R.R. LAVATORY LAV ASSOCIATION INSTALLED (PETE'S PLUG) PV PROCESS VENT OFFICIALS BACKFLOW PREVENTER SHEET SHT SHEET NOTE SN SF SQUARE FEET STAINLESS STEEL S.S. WATER CLOSET WC URINAL U YARD BOX Y.B. FFE FINISHED FLOOR ELEVATION CSP COMBINATION STAND PIPE DSP DRY STAND PIPE CSP COMBINATION STAND PIPE SHUT OFF VALVE IN CONCRETE YARD BOX BALANCING VALVE SOLENOID VALVE SV PRV PRESSURE REDUCING VALVE RELIEF VALVE RV AUTO FIRE SPRINKLER RISER ASR FHV FIRE HOSE VALVE FLSW FLOW SWITCH GALLONS GAL GAS COCK GC IHWR INDUSTRIAL HOT WATER RETURN 1. CODES AND STANDARDS A. AMERICANS WITH DISABILITIES ACT, (ADA) B. BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION IN OREGON: B.1. 2011 OREGON PLUMBING CODE (OPC) WITH STATE AMENDMENTS. 2. WATER SUPPLY: A. METER SIZE 4 INCHES IN EXISTING 60 BUILDING, METER SIZE 2 INCHES IN THE NORTH WING. B. MAIN SIZE 4 INCHES IN THE 60'S BUILDING, 2 1/2 INCHES IN THE NORTH WING. C. STATIC 60 PSI D. CONNECTED LOAD EXISTING 60'S BUILDING 414 FIXTURE UNITS 128 GPM, PLUS FIRE PROTECTION, NORTH WING 130 FIXTURE UNITS 76 GPM E. FLOW AVAILABLE EXISTING 60'S BUILDING 1254 F.U. 162 GPM, NORTH WING 165 F.U., 32 GPM 3. SANITARY SEWER: A. EXISTING 60'S BUILDING SEWER SIZE 8 INCHES @ 1 % SLOPE, NORTH WING SEWER SIZE 4"@ 2% SLOPE. B. TOTAL CAPACITY EXISTING 60'S 2112 DRAINAGE FIXTURE UNITS, NORTH WING 216 DRAINAGE FIXTURE UNITS C. CONNECTED LOAD EXISTING 60'S BUILDING 602 D.F.U., NORTH WING 174 D.F.U. 4. STORM DRAIN: A. RAINFALL INTENSITY 1.3 INCHES/HOUR, COMBINATION PRIMARY AND SECONDARY ARE TIED TOGETHER ON THE VERTICAL AS PER CODE AND SIZED BASED ON 3 INCHES/HOURS DOWNSTREAM. D. STORM DRAIN HAS MULTIPLE CONNECTIONS, FROM GRID LINE F THRU N & .5 THRU 8 SEE CRAFT CENTER P150C & PC100 1. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH PLUMBING SPECIFICATIONS. 2. AS-BUILT RECORD DOCUMENTS: AT PROJECT CLOSEOUT, CONTRACTOR SHALL SUBMIT DETAILED INSTALLATION DRAWINGS, CHANGE ORDERS AND SPECIFICATION CHANGES TO ARCHITECT FOR APPROVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS. 3. ALL EXCAVATORS MUST COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS INCLUDING NOTIFICATION OF ALL OWNERS OF UNDERGROUND UTILITIES AT LEAST 2 BUSINESS DAYS, BUT NOT MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION. 4. DETAILED INVESTIGATION OF EXISTING CONDITIONS ARE PART OF THE CONTRACT WORK. VISIT THE JOB SITE PRIOR TO BID. REVIEW AVAILABLE EQUIPMENT LAYOUTS, ASSEMBLY DRAWINGS AND INSTALLATION SCHEDULES. 5. CONTRACTOR SHALL COORDINATE ALL UTILITY LINES EXITING OR ENTERING BUILDING WITH DIVISION 2 SPECIFICATIONS AND CIVIL ENGINEER'S UTILITY PLAN DRAWINGS AND OTHER TRADES. 6. DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM BASED ON THE REQUIREMENTS OF THE STATE OF OREGON FIRE CODE, INSTALLATION SHALL ALSO COMPLY WITH REQUIREMENTS OF THE LOCAL FIRE MARSHAL AND THE OWNERS INSURING AGENCY AND THE FIRE SPRINKLER SHALL COMPLY WITH THE STANDARDS OF THE CURRENT EDITION OF NFPA13. 7. ALL SANITARY AND VENT PIPING SHALL BE SLOPED AT 1 / 4 "FT., EXCEPT WHERE NOTED AT 1 / 8 "FT. TO CLEAR STRUCTURE IN ACCORDANCE WITH OSPSC TABLE 7-5. 8. PLUMBING SYSTEMS IN EXPOSED CEILING AREAS A. SILVER- GALVANIZED UNISTRUT AND THREADED ROD HANGERS. B. CLEAN, RUST FREE BLACK CAST IRON DRAIN PIPE, GALVANIZED HANGERS. C. CLEAN, RUST FREE BLACK STEEL SPRINKLER PIPE, GALVANIZED HANGERS. D. CHROME SPRINKLER HEADS IN EXPOSED AREAS OR IN WOOD CEILINGS. E. WHITE SEMI-RECESSED HEADS AT AREAS WITH GB OR ACT CEILINGS. F. WHITE INSULATED SUPPLY PIPING. 9. CONTRACTOR TO COMPLY WITH THE (REDUCTION OF LEAD IN DRINKING WATER ACT) LEAD-FREE NSF STANDARDS NSF/ANSI 372 OR NSF/ANSI 61-G, PUBLIC LAW 111-380. 10. PROVIDE UNIONS & SHUT OFF VALVES AT ALL MIXING VALVES TO ISOLATE. 11. PROVIDE ISOLATION VALVES ON ALL WALL HYDRANTS. 12. PROVIDE ISOLATION VALVES AT EACH NEW RESTROOM BRANCH LINES. 13. PROVIDE CHECK VALVE / ANGLE STOPS TO ELIMINATE CROSS CONNECTION. 14. ALL RATED WALLS WITH PIPE PENETRATIONS NEED TO BE SEALED. 15. CONTRACTOR TO COORDINATE WITH ARCHITECT COLOR OF PAINT ON INSULATION. 16. CONTRACTOR TO COORDINATE WITH ARCHITECT AREAS THAT NEED FIRE PROTECTION PIPING PAINTED TO MATCH. PLUMBING DRAWING LIST ABBREVIATIONS GENERAL NOTES PLUMBING DESIGN CRITERIA P L U M B I N G L E G E N D FDV FDC T PG TT TS TS CO/WCO WHA FCO YCO FA engineers for a sustainable future TM www.glumac.com Job. No.: Contact: ISSUE DATE: PROJECT NO.: CHECKED BY: REVISIONS These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited. SERA ARCHITECTS COPYRIGHT 2012 900 SW Fifth Ave., Suite 1600 Portland, OR 97204 T. 503.227.5280 F. 503.274.7674 02.13.00545 TODD KOLIBABA E R B M E M O R I A L U N I O N - R E N O V A T I O N & A D D I T I O N P A C K A G E 4 1 0 0 % C O N S T R U C T I O N D O C U M E N T S 2014.08.01 7/30/2014 2:47:58 PM P000 11045 LEGEND AND ABBREVIATIONS - PLUMBING UNIVERSITY OF OREGON 13TH AVENUE & UNIVERSITY STREET P000 LEGEND AND ABBREVIATIONS - PLUMBING P001 SCHEDULES - PLUMBING DP100 DEMO PLAN - GROUND LEVEL - PLUMBING DP101 DEMO PLAN - LEVEL 1 - PLUMBING DP101m DEMO PLAN - MEZZANINE LEVEL - PLUMBING DP102 DEMO PLAN - LEVEL 2 - PLUMBIGN DP103 DEMO PLAN - LEVEL 3 - PLUMBING P150A GROUND LEVEL - NORTH WING - PLUMBING P150B GROUND LEVEL - HEARTH - PLUMBING P150C GROUND LEVEL - 1962 ADDITION - PLUMBING P150D GROUND LEVEL - SOUTHWEST - PLUMBING P151A LEVEL 1 - NORTH WING - PLUMBING P151B LEVEL 1 - HEARTH & MILLS CENTER - PLUMBING P151C LEVEL 1 - 1962 ADDITION - PLUMBING P151D LEVEL 1 - FOOD SERVICE - PLUMBING P151mD MEZZANINE - LEVEL 1 SOUTH - PLUMBING P152A LEVEL 2 - NORTH WING - PLUMBING P152B LEVEL 2 - HEARTH & MILLS CENTER - PLUMBING P152C LEVEL 2 - 1962 ADDITION - PLUMBING P153B LEVEL 3 - HEARTH & MILLS CENTER- PLUMBING P153D LEVEL 3 - SOUTH - PLUMBING P200A ROOF PLAN - NORTHWING- PLUMBING P200B ROOF PLAN - HEARTH & MILLS CENTER - PLUMBING P200C ROOF PLAN - 1962 ADDITION - PLUMBING P200D ROOF PLAN - SOUTHWEST - PLUMBING P201A UPPER ROOF PLAN - NORTH WING - PLUMBING P401 ENLARGED EXISTING PLANS - PLUMBING P601 HOT & COLD WATER RISER DIAGRAM P602 HOT & COLD WATER RISER DIAGRAM P603 WASTE AND VENT RISER DIAGRAM - PLUMBING P604 STORM RISER DIAGRAM (NORTH WING) P605 STORM RISER DIAGRAM - 50'S & 60'S BLDG P606 FIRE PROTECTION RISER DIAGRAM P801 DETAILS - PLUMBING
29
Embed
ABBREVIATIONS P L U M B I N G L E G E N D PLUMBING DESIGN … · 2014-08-04 · p152c level 2 - 1962 addition - plumbing p153b level 3 - hearth & mills center- plumbing p153d level
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PS
FS
DDCV
DCV
RPBFP
FROMFRM
BELOWBEL
ABOVEABV
IAPMO INTERNATIONAL ASSOCIATION OF
PV PLUG VALVE
UNIONUNCOMPRESSED AIRCA
SIEMESE FIRE DEPT. CONN.
VTR VENT THROUGH ROOF
REVOLUTIONS PER MINUTERPM
MFR MANUFACTURER
FIXTURE UNIT(FU)
FO FUEL OIL
DRAIND
CONTRACTORCONTR
CO CLEANOUT
CAST IRONCI
AUTOMATIC WET SPRINKLER RISER
SOLENOID VALVE
WEIGHTWGT
VACUUM BREAKERVB
THRUST BLOCKTB
PSI POUNDS PER SQUARE INCH
OFCI OWNER FURNISHED CONTRACTOR
NFPA NATIONAL FIRE PROTECTION
NUMBERNO.
THOUSANDS BTU/HRMBH
POUNDS OR NUMBER#
POUNDS (UNIT OF FORCE)LBS
HOT WATER FIXTURE UNITHWFU
GALLONS PER MINUTE
GALLONS PER HOUR
GPM
GPH
GASG
FLEXIBLE CONNECTIONFC
FEET PER SECONDFPS
DRAINAGE WASTE AND VENTDWV
ARCHITECTARCH
CUBIC FEET PER HOURCFH
CUBIC FEET PER MINUTECFM
CONTINUATIONCONT
ABOVE FINISHED FLOORAFF
DOWNDN
ELEC ELECTRICAL
HW HOT WATER
MECHANICALMECH
PLBG PLUMBING
SPRINKLERSPR
WASTEW
SD STORM DRAIN
VENTV
TYPICALTYP
PT
POINT OF CONNECTIONPOC
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
NORMALLY CLOSEDN.C.
MINIMUMMIN
MAXIMUMMAX
INVERT ELEVATIONI.E.
GATE VALVEGV
HORSEPOWERHP
FLOORFLR
FINISHEDFIN
DOWNSPOUT NOZZLEDSN
DIAMETERDIA
COLD WATER FIXTURE UNITCW(FU)
CONDENSATE DRAINCD
BRAKE HORSEPOWERBHP
ACCESS PANELAP
EXIST EXISTING
MH MANHOLE
CFF CAP FOR FUTURE
BV BALL VALVE
BFV BUTTERFLY VALVE
BWV BACKWATER VALVE
CLG CEILING
HD HUB DRAIN
TT TEST TEE
CHECK VALVECV
DCVA DOUBLE CHECK VALVE ASSEMBLY
DDCVA DOUBLE DETECTOR CHECK
REDUCED PRESSURE PRINCIPLERPBFP
W/ WITH
AFG ABOVE FINISHED GRADE
AD ACCESS DOOR
CONC CONCRETE
FA FLOW ALARM
FDVC
FH
FIRE DEPARTMENT VALVE CABINET
FIRE HYDRANT
ICBO INTERNATIONAL CONFERENCE OF
PS PRESSURE SWITCH
PRESSURE TEMPERATURE TRAP
SOV SHUT-OFF VALVE
LUBRICATED PLUG VALVELP
AMERICANS WITH DISABILITIESADA
BTU BRITISH THERMAL UNIT
CFS CUBIC FEET PER SECOND
CW COLD WATER
DFU DRAINAGE FIXTURE UNIT
HWR HOT WATER RECIRC
DWG DRAWING
MISCELLANEOUS EQUIPMENT
IW INDIRECT WASTE
HOT WATER (140°F)
AUTOMATIC WET SPRINKLERAS
HUB DRAIN
FLOOR SINK W/ GRATE AS SHOWN
FLOOR DRAIN
FIRE ALARM BELL
FIRE DEPARTMENT VALVE CABINET
FIRE DEPARTMENT VALVE
AUTO FIRE SPRINKLER RISER
FIRE DEPARTMENT CONNECTION
THRUST BLOCK
YH
HB
WH
YARD HYDRANT
SYMBOL DESCRIPTION
WALL HYDRANT
HOSE BIBB
BALL VALVE
ECCENTRIC REDUCER
PIPING BELOW GRADE
SANITARY SEWER, WASTE OR SOIL BELOW GRADE OR FLOORSAN
PIPE DROP
PUMPED DISCHARGEPD
D
OD
RD
SD
F
DRAIN LINE
OVERFLOW DRAIN PIPING
VENT
WASTE, OR SOIL ABOVE GRADE OR FLOOR
STORM DRAIN
HOT WATER CIRC (122°F)
COLD WATER
FIRE MAIN
BOTTOM CONNECTION - BRANCH LINE
TOP CONNECTION - BRANCH LINE
PIPE DOWN
PIPE UP OR UP & DN
DIRECTION OF FLOW
DIRECTION OF SLOPE
AUTOMATIC AIR VENT
TEST TEE
YARD CLEANOUT
FLOOR CLEANOUT
CLEANOUT/WALL CLEANOUT
THERMOMETER
PRESSURE GAUGE WITH COCK
WATER HAMMER ARRESTOR
AQUASTAT
CONCENTRIC REDUCER
BLIND FLANGE
CAP OR PLUG
FLEXIBLE CONNECTOR
EXPANSION JOINT
PIPE ALIGNMENT GUIDE
PIPE ANCHOR
STRAINER WITH BLOW OFF
STRAINER
UNION
FLOW ALARM
PRESSURE SWITCH
REDUCED PRESSURE BACKFLOW PREVENTER
DOUBLE CHECK VALVE ASSEMBLY
DOUBLE DETECTOR CHECK VALVE ASSEMBLY
OS & Y GATE VALVE WITH TAMPER SWITCH
BACKWATER VALVE
CIRCUIT SETTER
VACUUM RELIEF VALVE
RELIEF VALVE
PRESSURE REDUCING VALVE
LUBRICATED PLUG VALVE
ANGLE GATE VALVE
GATE VALVE
PRESSURE & TEMPERATURE RELIEF VALVE
CHECK VALVE
BUTTERFLY VALVE
SYMBOL DESCRIPTION
GW GREASE WASTE
HOT WATER CIRC (110°F)
HOT WATER (120°F)
140
140
G NATURAL GAS (7"W.C.)
FLOOR CLEANOUTFCO
WCO WALL CLEANOUT
OIL WASTEOW
TP TRAP PRIMER
MEDIUM PRESSURE GAS (2 PSIG TO 5 PSIG)MG
CS CIRCUIT SETTER
WET STANDPIPE RISER
FS
FD
AUTOMATIC SPRINKLER DRAIN
PLUMBING EQUIPMENT
ICW INDUSTRIAL COLD WATER
EXISTING PIPE(E)
# SHEET NOTE
POINT OF CONNECTION
TAMPER SWITCHTS
ROUGH IN AND CONNECTRI&C
FIRE DEPARTMENT VALVEFDV
EXISTING TO BE REMOVED
ASD
WSP
AS
WATER HAMMER ARRESTORWHA
OS & Y GATE VALVE (OUTSIDE SCREW & YOKEGATE VALVE)
FIRE SPRINKLER FLOOR CONTROL VALVE
FIRE HOSE VALVE
OVERFLOW DRAIN
ROOF DRAIN
ROOF RECEPTOR
FLOW SWITCH
DECK DRAIN, PLANTER DRAIN
TRAP PIMER
1% SLOPE
ROOF DRAIN PIPING, THE PIPES FROM ROOF DRAINSD (STORM DRAIN)
LOW PRESSURE GASLG
IHW INDUSTRIAL HOT WATER
TW
TWR
TEMPERED WATER
TEMPERED WATER RETURN
DETAIL NO.
SHEET NO.
1
P2
CONN CONNECTION
FEETFT
FUTUREFUT
FLUSH VALVEFV
FLUSH TANKFT
ACT
VALVE ASSEMBLY
PLUMBING AND MECHANICAL
BUILDING OFFICIALS
IRRIGATIONI.R.R.
LAVATORYLAV
ASSOCIATION
INSTALLED
(PETE'S PLUG)
PV PROCESS VENT
OFFICIALS
BACKFLOW PREVENTER
SHEETSHT
SHEET NOTESN
SF SQUARE FEET
STAINLESS STEELS.S.
WATER CLOSETWC
URINALU
YARD BOXY.B.
FFE FINISHED FLOOR ELEVATIONCSP COMBINATION STAND PIPE
DSP DRY STAND PIPE
CSP COMBINATION STAND PIPE
SHUT OFF VALVE IN CONCRETE YARD BOX
BALANCING VALVE
SOLENOID VALVESV
PRV PRESSURE REDUCING VALVE
RELIEF VALVERV
AUTO FIRE SPRINKLER RISERASR
FHV FIRE HOSE VALVE
FLSW FLOW SWITCH
GALLONSGAL
GAS COCKGC
IHWR INDUSTRIAL HOT WATER RETURN
1. CODES AND STANDARDS
A. AMERICANS WITH DISABILITIES ACT, (ADA)
B. BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION IN OREGON:
B.1. 2011 OREGON PLUMBING CODE (OPC) WITH STATE AMENDMENTS.
2. WATER SUPPLY:
A. METER SIZE 4 INCHES IN EXISTING 60 BUILDING, METER SIZE 2 INCHES IN THE NORTH WING.
B. MAIN SIZE 4 INCHES IN THE 60'S BUILDING, 2 1/2 INCHES IN THE NORTH WING.
C. STATIC 60 PSI
D. CONNECTED LOAD EXISTING 60'S BUILDING 414 FIXTURE UNITS 128 GPM, PLUS FIRE PROTECTION, NORTH WING
130 FIXTURE UNITS 76 GPM
E. FLOW AVAILABLE EXISTING 60'S BUILDING 1254 F.U. 162 GPM, NORTH WING 165 F.U., 32 GPM
3. SANITARY SEWER:
A. EXISTING 60'S BUILDING SEWER SIZE 8 INCHES @ 1 % SLOPE, NORTH WING SEWER SIZE 4"@ 2% SLOPE.
B. TOTAL CAPACITY EXISTING 60'S 2112 DRAINAGE FIXTURE UNITS, NORTH WING 216 DRAINAGE FIXTURE UNITS
C. CONNECTED LOAD EXISTING 60'S BUILDING 602 D.F.U., NORTH WING 174 D.F.U.
4. STORM DRAIN:
A. RAINFALL INTENSITY 1.3 INCHES/HOUR, COMBINATION PRIMARY AND SECONDARY ARE TIED TOGETHER ON THE
VERTICAL AS PER CODE AND SIZED BASED ON 3 INCHES/HOURS DOWNSTREAM.
D. STORM DRAIN HAS MULTIPLE CONNECTIONS, FROM GRID LINE F THRU N & .5 THRU 8 SEE CRAFT CENTER P150C
& PC100
1. ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH PLUMBING SPECIFICATIONS.
2. AS-BUILT RECORD DOCUMENTS: AT PROJECT CLOSEOUT, CONTRACTOR SHALL SUBMIT DETAILED INSTALLATION DRAWINGS, CHANGE ORDERS AND SPECIFICATION CHANGES
TO ARCHITECT FOR APPROVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS.
3. ALL EXCAVATORS MUST COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS INCLUDING NOTIFICATION OF ALL OWNERS OF UNDERGROUND UTILITIES AT LEAST 2 BUSINESS
DAYS, BUT NOT MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION.
4. DETAILED INVESTIGATION OF EXISTING CONDITIONS ARE PART OF THE CONTRACT WORK. VISIT THE JOB SITE PRIOR TO BID. REVIEW AVAILABLE EQUIPMENT LAYOUTS,
ASSEMBLY DRAWINGS AND INSTALLATION SCHEDULES.
5. CONTRACTOR SHALL COORDINATE ALL UTILITY LINES EXITING OR ENTERING BUILDING WITH DIVISION 2 SPECIFICATIONS AND CIVIL ENGINEER'S UTILITY PLAN DRAWINGS AND
OTHER TRADES.
6. DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM BASED ON THE REQUIREMENTS OF THE STATE OF OREGON FIRE CODE, INSTALLATION SHALL ALSO COMPLY WITH
REQUIREMENTS OF THE LOCAL FIRE MARSHAL AND THE OWNERS INSURING AGENCY AND THE FIRE SPRINKLER SHALL COMPLY WITH THE STANDARDS OF THE CURRENT
EDITION OF NFPA13.
7. ALL SANITARY AND VENT PIPING SHALL BE SLOPED AT 1/4"FT., EXCEPT WHERE NOTED AT 1/8"FT. TO CLEAR STRUCTURE IN ACCORDANCE WITH OSPSC TABLE 7-5.
8. PLUMBING SYSTEMS IN EXPOSED CEILING AREAS
A. SILVER- GALVANIZED UNISTRUT AND THREADED ROD HANGERS.
B. CLEAN, RUST FREE BLACK CAST IRON DRAIN PIPE, GALVANIZED HANGERS.
C. CLEAN, RUST FREE BLACK STEEL SPRINKLER PIPE, GALVANIZED HANGERS.
D. CHROME SPRINKLER HEADS IN EXPOSED AREAS OR IN WOOD CEILINGS.
E. WHITE SEMI-RECESSED HEADS AT AREAS WITH GB OR ACT CEILINGS.
F. WHITE INSULATED SUPPLY PIPING.
9. CONTRACTOR TO COMPLY WITH THE (REDUCTION OF LEAD IN DRINKING WATER ACT) LEAD-FREE NSF STANDARDS NSF/ANSI 372 OR NSF/ANSI 61-G, PUBLIC LAW 111-380.
10. PROVIDE UNIONS & SHUT OFF VALVES AT ALL MIXING VALVES TO ISOLATE.
11. PROVIDE ISOLATION VALVES ON ALL WALL HYDRANTS.
12. PROVIDE ISOLATION VALVES AT EACH NEW RESTROOM BRANCH LINES.
13. PROVIDE CHECK VALVE / ANGLE STOPS TO ELIMINATE CROSS CONNECTION.
14. ALL RATED WALLS WITH PIPE PENETRATIONS NEED TO BE SEALED.
15. CONTRACTOR TO COORDINATE WITH ARCHITECT COLOR OF PAINT ON INSULATION.
16. CONTRACTOR TO COORDINATE WITH ARCHITECT AREAS THAT NEED FIRE PROTECTION PIPING PAINTED TO MATCH.
PLUMBING DRAWING LIST
ABBREVIATIONS
GENERAL NOTES
PLUMBING DESIGN CRITERIAP L U M B I N G L E G E N D
FDV
FDC
T
PG
TT
TS TS
CO/WCO
WHA
FCO
YCO
FA
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:47:5
8 P
M
P000
11045
LEGEND ANDABBREVIATIONS- PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
P000 LEGEND AND ABBREVIATIONS - PLUMBING
P001 SCHEDULES - PLUMBING
DP100 DEMO PLAN - GROUND LEVEL - PLUMBING
DP101 DEMO PLAN - LEVEL 1 - PLUMBING
DP101m DEMO PLAN - MEZZANINE LEVEL - PLUMBING
DP102 DEMO PLAN - LEVEL 2 - PLUMBIGN
DP103 DEMO PLAN - LEVEL 3 - PLUMBING
P150A GROUND LEVEL - NORTH WING - PLUMBING
P150B GROUND LEVEL - HEARTH - PLUMBING
P150C GROUND LEVEL - 1962 ADDITION - PLUMBING
P150D GROUND LEVEL - SOUTHWEST - PLUMBING
P151A LEVEL 1 - NORTH WING - PLUMBING
P151B LEVEL 1 - HEARTH & MILLS CENTER - PLUMBING
P151C LEVEL 1 - 1962 ADDITION - PLUMBING
P151D LEVEL 1 - FOOD SERVICE - PLUMBING
P151mD MEZZANINE - LEVEL 1 SOUTH - PLUMBING
P152A LEVEL 2 - NORTH WING - PLUMBING
P152B LEVEL 2 - HEARTH & MILLS CENTER - PLUMBING
P152C LEVEL 2 - 1962 ADDITION - PLUMBING
P153B LEVEL 3 - HEARTH & MILLS CENTER- PLUMBING
P153D LEVEL 3 - SOUTH - PLUMBING
P200A ROOF PLAN - NORTHWING- PLUMBING
P200B ROOF PLAN - HEARTH & MILLS CENTER - PLUMBING
P200C ROOF PLAN - 1962 ADDITION - PLUMBING
P200D ROOF PLAN - SOUTHWEST - PLUMBING
P201A UPPER ROOF PLAN - NORTH WING - PLUMBING
P401 ENLARGED EXISTING PLANS - PLUMBING
P601 HOT & COLD WATER RISER DIAGRAM
P602 HOT & COLD WATER RISER DIAGRAM
P603 WASTE AND VENT RISER DIAGRAM - PLUMBING
P604 STORM RISER DIAGRAM (NORTH WING)
P605 STORM RISER DIAGRAM - 50'S & 60'S BLDG
P606 FIRE PROTECTION RISER DIAGRAM
P801 DETAILS - PLUMBING
TAG MANUFACTURER MODEL
SYTEM RECOVERY
(GPM) / INCOMING
STEAM PRESSURE
(PSIG)
MASTER CONTROL PANELELECTRICAL INSTALLATION
LOCATION
APPROX. WEIGHT (LBS.)NOTES
VAC / HZ / PHASE FLA SHIPPING OPERATING
UL LISTED PACKAGED SYSTEM TO INCLUDE THE FOLLOWING MAJOR COMPONENTS PRE-PIPED AND WIRED ON STRUCTURAL STEEL FRAME:
UL listed panel in NEMA 1 (minimum) enclosure that includes: lockable main power disconnect handle, individuallockable motor service disconnects for recirculation/condensate/sump pumps, motor overload and short circuitprotection for recirculation/condensate/sump pumps, protected control power transformer(s) on primary & secondarysides, recirculation pump "Hand-Off-Auto" switches, condensate & sump pump "Test-Off-Auto" switches with springreturn to "Off" from "Test", recirculation/condensate/sump pump "Run" lights, condensate & sump pump electricalternating relays and lead pump failure backup, sump pump "High Water Alarm" light with automatic reset, andsingle point power connection for panel.
SP-1 & 2Sump Pumps (Shipped
Loose)Weil No. 2445 2 ea
Cast iron, single-seal, submersible style, sized for 50 GPM @ 27' head, 1 HP, 1750 RPM, 2" discharge, passes 3/4"solids, and 40' power cord length. Weil items shipped loose with skid to be field installed/wired: SP-1 & 2, (4) modelno. 8230 N.O. mechanical floats with 40' cord length and cover mounting bracket, and No. 8805 wet well cover with(2) 20" model no. 8817 pump opening covers.
WH-1 & 2 Domestic Heater Cemline V45SSH1036-DW 2 ea42 GPM recovery each, 50°F to 140°F, 5# shell pressure, 3/4" O.D. copper tubes with double-wall construction,150# ASME, 0.0005 fouling factor, 45 gallon 316 stainless steel tank, integral bronze circulator, electronic 2-waymodulating control valve, double-solenoid safety relief, vacuum breaker, relief valve, with Cemtrol controllermounted to side of MCP.
CRU-2 Condensate PumpsXylem Domestic
Pump301.5CC 1 ea Bronze fitted pumps, duplex configuration, 36 gallon cast iron receiver, (2) heavy-duty 2-pole float switches, each
pump sized for 30 GPM @ 15# discharge pressure, 1/2 HP, 3500 RPM, ODP motors, dial thermometer, dischargepressure gauges & balance valves for each pump, 2" vent & overflow, 1" drain and 3" inlet.
RP-1Domestic Recirculation
PumpBell & Gossett NBF-36B 1 ea
3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 5 GPM @ 17' head.
TP-1Tempered DomesticRecirculation Pump
Bell & Gossett NBF-36B 1 ea3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 10 GPM @ 27' head.
ET-3 Expansion Tank Wessels TTA-125 1 ea60 gallon tank volume, 150# ASME, pre-charged, FDA approved butyl diaphragm, 1" stainless steel systemconnection, sized at 60# system pressure, 150# maximum tank pressure, 50°F initial temperature, maximumtemperature of 170°F, and system volume of 1,350 gallons of water.
TCV-1 Tempering Valve Heat Timer ETV 1 ea 3-way mixing valve, 1-1/4" system connections, stainless steel body & trim, electronic actuator, wth Heat Timercontroller and module for BMS connectivity mounted to side of MCP.
UL listed package includes a heavy-duty, welded structural steel frame and base built to AWS D1.1 specifications. All components are pre-mounted, piped, wired, and hydro-tested before being paintedFlowTherm's standard gray, water-based enamel. All piping, pipe materials, welding procedures, valves, fittings, and hardware are in accordance with ASME B31.9 standards.
Package includes lot interconnecting headers, piping, fittings, strainers, isolation/balance/check/relief valves, suction diffusers, thermometers, pressure gauges, flex connectors, and steam traps as shown onthe flow diagram.
Domestic heat transfer system is enabled, sequenced and monitored by the Building Management System. BMS contractor to ship skid mounted controllers, temperature sensors & wells, pressure switches &sensors, flow & steam meters, BTU meters, and wiring diagrams to FlowTherm for installation and wiring at fabrication facility. Control panel for local alarms, pilot lights, disconnects, etc. is provided and wiredby FlowTherm. FlowTherm will install wiring & conduit between skid equipment and Master Control Panel. Other devices requiring remote installation are to be supplied, installed and wired by BMS contractorin the field. Steam meter shall be type that requires < 5 pipe diameters up and downstream of device, similar Veris Accelabar.
Power wiring to FlowTherm panel is by Div. 26
Skid dimensions shall not exceed 12.5' L x 8' H x 6' W, including the anchor chairs.
42" of service clearance is required in front of the Master Control Panel. 36" in front of WH-1 & 2.
Equipment vents/drains/overflows and other system piping connections to the package are the responsibility of the installing contractor.
Package does not include spring isolators, vibration eliminator mounts, special mounting brackets, special seismic construction, certification, seismic frame calculations, seismic anchorage calculations, orseismic testing, insulation for piping and components, calcium silicate pipe shields or insulated pipe supports. Skid shall be bolted to concrete floor or housekeeping pad.
Condensate piping shall be sloped towards condensate return unit's inlet.
PLUMBING FIXTURES SCHEDULE ELECTRIC WATER HEATER SCHEDULE
SCALE: 1/8" = 1'-0"1GROUND LEVEL FLOOR PLAN - SECTOR D - PLUMBING
#KEYED NOTES1. SEE SHEET P401 FOR PLUMBING EQUIPMENT LAYOUT.2. 4" GREASE WASTE CAPPED FOR FUTURE.
KEY PLAN (NTS)
D
0 16 24 328
1/8"-1'-0"
WC-2
WC-1
WC-1
WC-2
L-1
L-12"FD-1
L-1
L-1
L-1
UR-2
UR-1
S-1
MS-13"V UP
FSH-1
FSH-1
DF-1
WSP-1CSD-1ASD-1
2"FD-1
3/4"HWRUP & DN
2"V UP
2"V DN
F F
2"V UP
2"V UP
2"SANUP & DN
4"SANUP & DN
3"V UP & 2"V DN
2"V DN
4" SANUP & DN
2"V DN
MULTICULTURAL CENTER
109
VSA
109FAPASU KP
109GV SMALL CONF ROOM
112
JAN
113
MENS WASH
114MEDITATION
115
WOMENS WASH
116
TELECOM
117
ELEC
118
WOMEN
111
MEN
110
CORRIDOR
H110MEDIUM CONF
119
CAER
109N
MCC DIRECTOR
109M
MSA
109L
STOR.
109K
BWA
109B
BSU
109AMEDIUM CONF
104?
?
CONF STORAGE
106
MECHA
109ENASU
109DLARGE CONF
107
STAIR 2
S102
SEATING
121
STAIR 3
S103
6"RD UP(8210 SF)
1 1/2"V DN
1 1/2"V DN
8"RDUP & DN(8425 SF)
6"RDUP & DN(3586 SF)
6"RDUP & DN(4255 SF)
3"RDUP & DN(750 SF)
6"RD DN(8210 SF)
2"SAN UP
2"V UP
3"SAN UP
1 1/2"V UP
4"SANUP & DN
2"V DN
1 1/2"V DN
2"FD-1
2"SAN UP
4"SAN DN
1"CW UP
1"CW DN
4"SAN UP
3/4"HW & CWUP & DN
2"V UP
2
EU201
M N P Q R S T U V W
22
21
20
19
18
17
16.5
19.7
20.5
21.6
2"SAN DN
6"RD DN(3730 SF)
3"RD/OD UP(1060 SF)
COMBINE ODINTO THE PRIMARYRD AS PER CODE
6"@ 2%
SEISMIC JOINT
SEE DETAIL2/P801
HB-1
1/2"
3"SAN DN,2"SAN UP
2"CW UP,2" HEADER W/SOV
2"HEADER W/ SOV
1/2"CW2"V DN
CORRIDOR
H110
STUDENT STREET
H104
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:49:2
7 P
M
P151A
11045
LEVEL 1 - NORTHWING -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR A - PLUMBING
KEY PLAN (NTS)
A
0 16 24 328
1/8"-1'-0"
UP
DN
PROVIDE 1"RPZFOR HVAC MAKE UP WATER
RELOCATED GAS METER
RECONNECT TO EXISTINGGAS LINE ROUTED TOTAYLOR LOUNGE FIRE PLACES
G
3"FS-1
HB-1
NEW FIRE PROTECTIONRISER, RECONNECT TOEXISTING SYSTEM
DUCKSTORE
102
MECH
103
STAIR 11
S111
STAIR 1
S101
?
?
LANDING
H102
BRIDGE
R102
STAIR 2
S102
HALLWAY
H101TAYLOR LOUNGE
101
STAIR 9
S109STAIR 5
S105
EMU LOBBY
L101
L M N
21
20
19
18
17
16
15
14
13
12.5
HGFE
14.2
15.5
16.2
17.0
17.5
17.9
19.7
20.5
21.6
12.7
12.2
6"RD DN(4065 SF)
6"RD UP(3135 SF)
4"RD DN(3405 SF)
4"RD UP(2730 SF)
3"RD UP(445 SF)
3"RD/OD UP(485 SF)
COMBINE ODINTO THE PRIMARYRD AS PER CODE
(E) 6"SAN DN
(E)1 1/4"HW,(E)2 1/2"CW
(E) 4" V UP
2"V DN
POC 3/4"TO EXISTING
POC
1/2"HW UP
2"SAN UP
1/2"TP UPTO ASSEMBLY ABOVE
1 1/2"CW UP
4"SAN UP
4"SAN DN
PROVIDE SEISMICSHUT OFF
SEISMIC JOINT
SEISMIC JOINT
HOLD TIGHTTO STRUCTURE
4"@ 1%
6"@ 1%
1 1/2"CW
/2"HW
1/2"HWR
3"RD/OD UP(200 SF)
3"RD/OD UP(475 SF)
COMBINE ODINTO THE PRIMARYRD AS PER CODE
COMBINE ODINTO THE PRIMARYRD AS PER CODE
4"@ 1%
WH-1
POC 1" TOEXISTING
3/4"CW, 3/4"HW CFF,PROVIDE SUB-METER
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)(E)(E)
(E)(E)
POC 1/2"HWRTO EXISTING
SEATING
133
2"SAN UP
HOLD TIGHTTO STRUCTURE
3/4"
1/2"CA DN
1/2"CA DN, AND ROUTED TOEXISTING CA IN UTILITY TUNNEL
CA
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:49:4
2 P
M
P151B
11045
LEVEL 1 -HEARTH & MILLSCENTER -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR B - PLUMBING
KEY PLAN (NTS)
B
0 16 24 328
1/8"-1'-0"
WC-1
WC-2UR-1UR-2
L-1 L-1
WC-1 WC-2
2"FD-1
2"FD-1
WC-2L-2
MS-1
TP-2
WHA
4"SAN DN
2"SAN DN
V. SM. CONF132
V. SM. CONF131
??
STAIR 10S110
STORAGE130
FOOD SERVICE VENDOR 3158
FOUNTAIN COURT SEATING134A
SEATING134B
STAIR 6S006
FOYERH134
ROGUE CONF (MEDIUM)140
UMPQUA CONF (SMALL)141
JANITOR142
HALLWAYH143 TOILET
143
STAIR 7S107
V LARGE CONF ROOMSTORAGE
145A
V. LARGE CONF145
V. LARGE CONF146
??
STAIR 8S108
CONFERENCE STORAGE147
??
STORAGE150
L-1 L-1
DF-1
L M N
12
11.5
11
10
9.5
9
8
7
6
5
4
3
2
1
0.5
KJHGF
POC 3/4"HW,CW &TO EXISTING INCEILING
3"ADO-13"AD-1(200 SF)
4"RDUP & DN(2865 SF)
4"V UP
4"V DN
3"SAN DNCONNECT IN CHASE
4"SAN DN2"V
1/2"HWR,3/4"HW,1 1/2"CW DN
3/4"HW,CW
2"CW DN
2"CW DN
WHA
6"RD UP & DN(2715 SF)
EXISTING 5"RD UP & DN(3270 SF)
3"SAN UP
3"V
2"V
3"V UP
1"CW UP
4"RDUP & DN
4"RDUP & DN
CORRIDORH145
MENS RESTROOM148
WOMENS RESTROOM149
DEMO EXISTINGUTILITY SINK, REMOVESERVICES BACK TOMAINS AND CAP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:49:5
5 P
M
P151C
11045
LEVEL 1 - 1962ADDITION -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR C - PLUMBING
AB018 04/09/14
KEY PLAN (NTS)
C
0 16 24 328
1/8"-1'-0"
UP
(E) ALARM BELL
(E) 2-WAY FDC
PROVIDE 3/4"HOT, 1"COLD WATER CAPPEDWITH SUB METERS, 1"GAS, 2"VENTCAPPED FOR FUTURE T.I. WORK TO BEDETERMINED AT A LATER DATE, EACHRETAIL SPACE TO BE INDIVIDUALLY METERAND GREASY WASTE LINE ROUTED TONEW GREASE INTERCEPTOR
(E) 2-WAY FDC
(E) HOSE BIB
10
9.5
9
8
7
6
5
4
GFEDCA
14.2
12.7
12.2
EXISTING FIXTURES INTO REMAIN IN SERVICE
PROVIDE 3/4"HOT, 1"COLD WATER CAPPEDWITH SUB METERS, 1"GAS, 2"VENTCAPPED FOR FUTURE T.I. WORK TO BEDETERMINED AT A LATER DATE, EACHRETAIL SPACE TO BE INDIVIDUALLY METERAND GREASY WASTE LINE ROUTED TONEW GREASE INTERCEPTOR
PROVIDE 3/4"HOT, 1"COLD WATER CAPPEDWITH SUB METERS, 1"GAS, 2"VENT CAPPED FORFUTURE T.I. WORK TO BE DETERMINED AT ALATER DATE, EACH RETAIL SPACE TO BEINDIVIDUALLY METERED AND GREASY WASTELINE ROUTED TO NEW GREASE INTERCEPTOR
2"V
2"V CFF2"V CFF
3/4"HW, 1"CW DN
3/4"HW, 1"CW CFF2"V CFF
B
EXISTING FIXTURES INTO REMAIN IN SERVICE
4"V DN
4"V UP
2"SAN UP
1 1/2"V UP
2"SAN UP
(E)4"SAN UP
POC 2"SANTO (E)4" SAN
(E) 1/2"HW, CW
EXISTING SINKTO REMAIN
PROVIDE HW, CWSUB-METERS
(E)
(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
POC
POC
POC
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:50:0
8 P
M
P151D
11045
LEVEL 1 - FOODSERVICE -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1LEVEL 1 FLOOR PLAN - SECTOR D - PLUMBING KEY PLAN (NTS)
D
0 16 24 328
1/8"-1'-0"
L M N
14
13
12.5
12
11.5
11
10
9.5
9
8
7
6
5
4
3
2
1
0.5KJHGFEDCA
14.2
12.7
12.2
WC-2
L-2
RECONNECT TOEXISTING SERVICES
SH-1
2"FD-1
CONNECT 2"VTO EXISTING VENT SYSTEM
B
4"RD UPTIE OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3"/HR DOWN STREAM.
3"RD/OD UP(1450 SQFT)
3"RD/OD UP(1450 SQFT)
4"RD UPTIE OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3/HR DOWN STREAM.
3"RD UP & DN(825 SF)
4"RD UP(2040 SF)4" RD DN(2865 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE (3270 SF)CONNECT TO THE EXISTING 5"RD
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE(6"RD DN 2715 SF)PACKAGE 1
3" RD UP(350 SF)
3"RD/OD UP(2470 SF)
3"RD/OD UP(2205 SF)
3"RD/OD UP(160 SF)
3"SAN UP
2"V UP
1"CW UP
1/2"TP UPTO ASSEMBLY
3"SAN DN
1"CW DN
1/2"HW UP
2"SAN UP
2"SAN UPTO FD
1 1/2"CW UP
4"SAN UP
4"SAN DN
1 1/2"CW,1/2"HW,1/2"HWR DN
3"RD UP(800 SF)
4"@ 1%
3"@ 2%
EXISTING RESTROOMTO REMAIN
3"V DN
PROVIDE SEISMICGAS SHUT OFF VALVEON EXISTING GAS TRAIN
CONTRACTOR TOVERIFY EXISTINGFD & PIPING CAN BEREUSED
(E)2" MG
(E) 1 1/2" MG
(E) 1 1/4" MG
(E)1 1/4" MG
4"@ 1%
(E)
(E)
(E)
(E)
(E)
(E)
4"V DN
4"V UP
engineers for a sustainable futureTM
www.glumac.com
Job. No.:
Contact:
ISSUE DATE:
PROJECT NO.:
CHECKED BY:
REVISIONS
The
se d
raw
ings
and
thei
r co
nten
t are
the
prop
erty
of S
ER
A A
rchi
tect
s In
c. a
nd a
re to
be
utili
zed
on th
is p
roje
ct. R
epro
duct
ion
of a
ny p
art o
f thi
s m
ater
ial,
with
out t
he e
xpre
ss w
ritte
n pe
rmis
sion
of S
ER
A A
rchi
tect
s In
c. is
pro
hibi
ted.
SE
RA
AR
CH
ITE
CT
S C
OP
YR
IGH
T 2
012
900 SW Fifth Ave., Suite 1600
Portland, OR 97204
T. 503.227.5280 F. 503.274.7674
02.13.00545
TODD KOLIBABA
ER
B M
EM
OR
I AL
UN
ION
- R
EN
OV
AT
ION
& A
DD
ITI O
N
PA
CK
AG
E 4
100%
CO
NS
TR
UC
TIO
N D
OC
UM
EN
TS
2014.08.01
7/3
0/2
014 2
:50:2
9 P
M
P151mD
11045
MEZZANINE -LEVEL 1 SOUTH -PLUMBING
UN
IVE
RS
ITY
OF
OR
EG
ON
13T
H A
VE
NU
E &
UN
IVE
RS
ITY
ST
RE
ET
SCALE: 1/8" = 1'-0"1MEZZANINE FLOOR PLAN - SECTOR D - PLUMBING
AB018 04/09/14
KEY PLAN (NTS)
D
0 16 24 328
1/8"-1'-0"
WC-2
WC-1
WC-1
WC-2
L-1
L-1
2"FD-1L-1
L-1
L-1UR-2
UR-1
MS-1
2"FD-1
S-1
3"V DN
4"V UPTO 4"VTR
2 1/2" V DN
4" SAN DN
4" SAN DN
1 1/2" V DN
2" SAN DN
4" SAN DN
1 1/2"HW UP
DF-1
4" V UP
CSP-1ASD-1
WSP-1
S-1
1 1/2"CW UP
3/4"HWR UP
3/4"HWR
2"CW DN
MEN'S CENTER
211
STAIR 2
S202
SUPPLY
213A
NON-TRADITIONAL STUDENT
UNION
212
STUDENT ACTIVITIES AND
RESOURCE CENTER
213
COPY CENTER
213B
CHAIR STORAGE
213C
V. SM. CONF
210
STUDENT ACTIVITIES AND
RESOURCE CENTER
213
SEATING STORAGE
214D
TEAM
213D
TEAM
213E
DIRECTOR
213F
ASUO ADVISOR
213G
MF AUDITORIUM STORAGE
214C
STORAGE
214B AV
214A
MULTI-FUNCTIONAL
AUDITORIUM
214
?
?
MEN
216
WOMEN
217
OFFICE
223A
CULTURAL FORUM
223
STAIR 3
S203
ELECTRICAL
222
JAN
221
MEDIUM CONF
219
STORAGE
218
VESTIBULE
V214C
CORRIDOR
H223
STUDY/ COLLABORATION
H201
CIRCULATION
H200
MEDIUM CONF ROOM
230
4"RD /OD UP(3430 SF)
3"RD/OD UP(2325 SF)
4"RD /OD UP(3430 SF)
COMBINE OD INTO THEPRIMARY RD ON THE VERTICALAS PER CODE6"RD DN (8210 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THE VERTICALAS PER CODE,6"RD DN (3430 SF)
3"RD/OD UP(750 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THEVERTICAL AS PER CODE,3"RD DN (750 SF)
4"RD/OD UP(1925 SF)
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THEVERTICAL AS PER CODE,6"RD DN (4255 SF)
4"RD/OD UP(3586 SF)
COMBINE OD INTO THEPRIMARY RD ON THEVERTICALAS PER CODE (TYPICAL)6"RD DN (3586 SF)
3"RD/OD UP(2445 SF)
3"RD/OD UP(840 SF)
3"RDDN(1490 SF)
3" OD (3400 SF)
2" V DN
4"SAN UP
2"V UP
4"SAN UP
2"V UP
1/2"TP UPTO ASSEMBLY ABOVE
2"V UP
2"SAN DN
4"SAN UP
1"CW UP
1/2"TP LINE UP TOASSEMBLY ABOVE
4"SAN DN
2"V UP
SPRINKLER LINE UPTO PENTHOUSE
2"FD-1
(2) 1/2" TRAP PRIMERASSEMBLY ABOVE
2"V UP
M N P Q R S T U V W
22
21
20
19
18
17
16.5
19.7
20.5
21.6
COMBINE OD INTO THEPRIMARY ROOF DRAIN ON THEVERTICAL AS PER CODE,8"RD DN (8425 SF)