Top Banner
City Council Meeting August 12, 2013 1 ITEP GRANT SHERIDAN RD & CHICAGO AVE Bike Path
8

A7 itep grant sheridan chicago bike path presentation 8.12.13

Dec 23, 2014

Download

cityofevanston

Sheridan Rd and Chicago Ave Bike Path
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20131

ITEP GRANT

SHERIDAN RD & CHICAGO AVE

Bike Path

Page 2: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20132

ITEP GRANT

•Federally Funded Program

•IDOT Administered

•Up to 80% Federal Share

•At least 20% Local Match

Page 3: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 2013

• Sheridan Road (off-street)Ridge Avenue to South Campus Drive

Along east side in front of Northwestern University Campus

Connects to the Lakefront Bike Path and Wilmette’s Bike System

• Chicago Avenue (on-street)Sheridan Road to Davis Street

Connect Sheridan bike path to protected bike lanes on Church and Davis

3

Two-Way Bike Path

Page 4: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20134

Sheridan Road

Page 5: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20135

Sheridan Road•Description

• East side of street in the parkway (off-street)• 8 feet wide, bike path markings• Landscaping between street curb and bike path

•ImpactsSidewalk

• From 12 feet wide to 8 feet wide

Trees• Some trees may have to be removed or relocated• Minimize impact using permeable materials

Description and Impacts

Page 6: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20136

Chicago Avenue

Page 7: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 20137

Chicago Avenue•Description

• West side of street(on-street) in the parking lane• Raised median, delineators, bike path markings• Bike signal

•ImpactsParking Spaces

• 36 metered spaces• 16 non-metered spaces• 19 metered spaces can be added to the east side between

Sheridan Road and Clark Street

Trees• None

Description and Impacts

Page 8: A7 itep grant sheridan chicago bike path presentation 8.12.13

City Council Meeting August 12, 2013

QUESTIONS?

8

GGGQ