    Item#Particulars ofItems of work

    Quantity Unit Rate Per Amount (Rs)

    15

    .2

    13mm(1/2)

    thick CementPlaster on wallsand columns inbasement,plinth andground floor

    includingmaking edges,corners andcuring.

    1:4

    Sq.m

    %Sft

    70,55

    655.45

    PSq.m

    Per %Sft

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    3/17

    Item # Particulars of Itemsof work Quantity Unit Rate Amount (Rs)

    14.1

    Providing and layinghand mixed cementconcrete bed underfloors

    Cu. M%Cft

    1612.14565.5

    using graded shingleor Bajri 50 mm anddown gaugecomplete withleveling, ramming,water and curing

    1:4:8

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    4/17

    S.No

    Description Quantity Unit Rate Amount

    14.2 P/L 1:2:4 cement

    concrete floor using

    graded screened

    shingle/bajri 19mm and

    down gauge in groundfloor laid in panels

    (without glass strip)

    including formwork,

    consolidation, finishingand curing.

    i)-50mm (2) nominalthick flooring

    Sq.m

    %Sft

    146.45

    1380.55

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    5/17

    17.4 Painting in ground flooror basement with paint

    mixed at site using

    ingredients and pigment

    to produce required

    texture and shade in two

    or more coats onplastered , rendered and

    or concrete surface over

    and including the cost of

    priming coat, surface

    preparation, rubbing

    down smooth, knottedfilling cracks, holes,removing blisters and

    other imperfections.

    Sq.m

    %Sft

    92.05

    855.15

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    6/17

    17.8 Painting in ground floor

    or basement with

    Robbialac (VIP) or

    equivalent plastic

    emulsion paint in two or

    more coats as permanufacturers

    instructions on plastered

    , rendered and or

    concrete surface over

    and including the cost of

    priming coat, surface

    preparation, rubbing

    down smooth, knotted

    filling cracks, holes,

    removing blisters and

    other imperfections.

    Sq.m

    %Sft

    119.15

    1108.95

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    7/17

    Rate Analysis for Cement Plaster. Detail of cost for 10 Sq.m.

    Mortar 107.6 x13/304.8 = 4.589 Cft

    Wastage 10% = 0.459 Cft.

    Total = 5.048 Cft.

    1:4 1. Material

    Mortar 0.143 Cu.m 661.00 94.52

    Water Charges 1.5% 1.42

    2. Labour

    Plasterer 6.50 hours Rs. 8/-per hour Rs. 52.00

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    8/17

    Cooly 4.50 hours Rs. 3/75-per hour Rs. 16.88 Bhishti 0.75 hours Rs. 4.38/p hour Rs. 3.29

    Total labour Rs. 72.17

    1:4 Material

    Mortar 0.143 cu.m Rs. 661.00 Rs. 94.52

    Water Charges 1.5% Rs. 1.42

    Labour Rs. 72.17

    Scaffolding 5% Rs. 3.61

    Total Rs. 171.72 Contractors Profit & Overhead 30% Rs. 51.51 Rs. 223.23 Rate per sq. m 223.23/10 Rs. 22.32

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    9/17

    25-4/2012

    Brick work (9x4-1/2 x3) 1350 nos. for 100 cu ft.

    Dry mortar for Brickwork 30% 30 cu ft for 100 Cu ft.

    Material for cement concrete 1:2:4Coarse aggregate 88 cu ft for 100 cu ft.

    Sand 41 Cu ft for 100 Cu ft.

    Cement 22 Cu ft for 100 Cu ft (18 bags)

    Dry mortar for plaster 6 Cu ft per 100 sft.

    Timber for panelled door shutter (1-1/2) thick 15 Cu ft/100sft.

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    10/17

    Earthwork for 1000 cu ft. 1. Excavation in foundation, trenches etc. in ordinary soil

    including disposal up 100 ft & lift of 5ft.{ 5 Beldars and 4Mazdoors}/day.

    2. Refelling excavated earth in foundation, plinth etc.

    including consolidation in 6 layer {3 Beldars, 2 Mazdoors and Bhisti (1000 cu ft)/day.

    3. Disposal of surplus earth within a lead of 100 ft { 1-Mazdoor {100 Cu ft}/day.

    Cement Concrete work per 100 Cu ft: Laying cement concre-2 Beldars, 3 Mazdoors, Bhisti and

    Mason can do 100 Cu ft/day

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    11/17

    R. C. C work:-1. Laying reinforced concrete-3 Beldars, 3 Mazdoors, 1-1/2

    Bhisti and Mason can do 100 Cu ft/day.

    2. Centering and shuttering for flat surfaces-4 Beldars and 4Carpenters (II class) can do 96 Sq ft/day.

    3. Reinforcement work for R.C.C- 1 Blacksmith or fitter and 1Beldar can bend and place in position 2 cwt of steel per day.

    1 cwt = 50.802 kg.cwt stands for cent(100)wt. length of onehook=8 to9 time the D.

    Additional length for two bent up = 2x .42d=.84d.Brick work per 100 Cu ft.First class brickwork in 1:4 cement mortar in superstructure,

    partition walls, and parapet wall-2-1/4 Mason, 4-1/2Mazdoor and Bhisti can do 100 cft/day.

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    12/17

    Properties of Round Bars

    Diameter Area Weight in lbs

    in inch in Sq. inch per rft.

    0.049 0.1673/8 0.110 0.376

    0.196 0.667

    5/8 0.307 1.043

    1 0.786 2.670

    The length of one hook may be taken as 9 Dia. Of bar.For two bent ups additional length is equal to 2x.45d=.9d

    where d is equal to depth of bean or slab minus bottom andtop covers.

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    13/17

    ESTIMATING AND COSTING BYr

    B.N. DUTTA

    Specifications of Brickwork I Class:

    Should be thoroughly burnt, regular in shape and their edges should

    be sharp and square, and shall emit clear ringing sound on beingstruck, and shall be free from cracks.

    Bricks shall not absorb water more than 1/6th of their weight, after onehour of soaking by immersing in water.

    Minimum crushing strength of 1500 lbs per sq inch.

    Soaking for 12 hours before use. Continue till air bubbling ceases.Mortar joint shall not exceed in thickness. Laid with frogs upward.

    Brick work shall be carried out not more than 3 ft height at a time.

    Curing for 12 days.

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    14/17

    D.D kohli, Estimating, Costing and Accounts, 9th Ed. S.Chand& Co. Pvt. Ltd.

    S. Dutta, Estimating and Costing in Civil Engineering 22ndEdn. S. Dutta & Co.

    E.w. Steel and Terene J. MC GHEE, Estimating & Costing.

  • 8/22/2019 93775305 Quantity Surveying Estimation 3

    15/17

    Total quantity of ingredient materials of cement concrete maybe taken as 152 Cu m for 100 cu m.

    Approximate method of determining the quantity of materialsfor 10 cu m concrete is to divide 15.2 by the sum of thenumerals of the proportion of the materials which gives the

    quantity of cement in Cu m. To find the materials for 10 Cu m of cement concrete of 1:4:8

    proportion, Cement = 15.2/1+4+8=15.2/13= 1.17 cum=say 1.15 cu m.

    Sand = 1.15x4=4.60

    Bajri= 1.15x8-9.20 cu m.