Top Banner
FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk 9 th FSP Meeting 6 th November 2012
15

9 th FSP Meeting 6 th November 2012

Feb 23, 2016

Download

Documents

fritzi

9 th FSP Meeting 6 th November 2012. Agenda 10:30 – 10:35 Welcome Simon Macaulay 10:35 – 10:40 Introductions All 10:40 – 10:50 Minutes/Matters Arising Simon Macaulay 10:50 – 11:30 Plastics industry packaging recycling targets Philip Law (BPF ) - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

9th FSP Meeting

6th November 2012

Page 2: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Agenda10:30 – 10:35 Welcome Simon Macaulay10:35 – 10:40 Introductions All10:40 – 10:50 Minutes/Matters Arising Simon Macaulay10:50 – 11:30 Plastics industry packaging recycling targets Philip Law (BPF)11:30 – 11:40 Defra update Jane Gardner11:40 – 11:50 FSP newsletter All11:50 – 12:30 FSP End of Year Report & Metrics Stuart Blofeld12:30 – 12:40 AOB12:40 – 12:45 Date of next meeting

12:45 – 13:15 LUNCH13:15 – 14:00 Tour of Anglo Recycling facility

Page 3: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Welcome from Chairman

Page 4: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Introductions

Page 5: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

8th FSP Meeting Minutes & Matters Arising

Page 6: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Plastics industry packaging recycling targets presentation

Philip Law (BPF)

Page 7: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Defra update

Jane Gardner

Page 8: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

FSP newsletter

Page 9: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

FSP Annual Summary Report & Metrics

Stuart Blofeld

Page 10: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

FSP Annual Summary Report content

• Foreword by the FSP Chair• Executive Summary• Intro to FSP (Who are we)• Achievements in 2012 (Broadloom, Carpet Tiles, Resilient, Resin, Hard)• FSP KPIs/Metrics? (to be discussed)• Appendix – List of FSP members

Page 11: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Example FSP KPIs/Metrics

LEVEL 1 KPIsTotal Energy Use (KPI1)Total Water Use (KPI2)Total Waste Generated (KPI3) 

LEVEL 2 KPIs (Waste)Tonnage Material produced/collected (KPI3-1)Tonnage Material reused (KPI3-2)Tonnage Material recycled (KPI3-3)Tonnage Material incinerated (KPI3-4)Tonnage Material landfilled (KPI3-5)% Materials diverted from landfill (KPI3-6)

Page 12: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

FSP KPIs/Metrics - considerations• What are we measuring?

• Must be comparable• Do we split KPIs by flooring sector• Do we include non-manufacturing operations? E.g. distribution

and installation?• Same reporting periods• Use metrics to set future targets and report against these• BRE Material Profiles LCA methodology already used across flooring

sectors – measure product performance• Are we attempting to create something similar at a

company/sector/industry wide level??

Page 13: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

AOB & Date of Next meeting

Page 14: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Next meeting dates March 2013 (w/c 11th March 2013)

Page 15: 9 th  FSP Meeting 6 th  November 2012

FLOORING SUSTAINABILITY PARTNERSHIP Email :[email protected] www.flooringwaste.co.uk

Lunch and Tour