5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Jan 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 2: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

5

DBST

reject

2~3

HWL 0.6 0.8m

PI, CBR

PI

Mr. Hum

Page 3: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

CBR

DBST

1

2~3

Page 4: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Research Center 10

Page 5: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

1.

25mm, 5mm

2.

25-5mm

5-0mm

Limestone .

MPWT

MPWT

Mr. Sinal

(Engi neer)

Mr. Pi seth

Page 6: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

1 TMC

2016 4 6 9: 30 12: 00, 13: 00 14: 30

TMC

1.

2.

CBR

3 50cm

Page 7: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

CBR

CBR

CBR

CBR 3

CBR

200m.

40% 500mm

CBR 16%

10kN

Job Mix

TMC

60 /H

20-13mm( 25mm), JIS 5

13-5mm JIS 6

5-0mm,

60/70

Page 8: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

5mm 2.5mm

2.5mm

50-37 37-19 39

37-19 19-12.5 21

19-12.5 12.5-5.0 13.5

12.5-5.0 5.0-2.5 3.5

5.0-0 2.5-0

As

/

/

1 /

M-30 20-10 5-0 70 20 10

10 16pass

Page 9: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

10 16pass

12 16

pass

12 16 20pass

150 11

145 11

135 10

110

Page 10: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

5

2016 4 7 14: 00 15: 00

MPWT 5

1.

( 5 )

ODA

25~30cm

20~25cm

5x2=10cm

5cm

CBR 200~500m

40~50cm

27cm 1

7cm

60/70

Page 11: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

ESAL 15x106

7

100km, 50km

Page 12: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2016 4 8 10: 30 13: 30

1.

2.

2

QC

11

5

LS

LS

MPWT

3~4

LS

60/70

3 10,000t

25

3

Page 13: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

30cm

1~2%

13cm

3.5cm+3.5cm

Page 14: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2016 4 11 9: 00 14: 30

EME

SMA

120 350

120 3~6% 350 2^%.

2

19 13.2 9.5 6.7 4.75 2.36 1.18 0.6 0.3

0.15 0.075

6.7 1.18

9.5

Page 15: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

13.2 13

14

JIS 6 13-5

14-10 10-7 7-5

400 /

300 350 /H

23

Quarry

10 14 20-14 14-10 10-7 7-

5 5-2.5

JIS

28-20 20-14 14-5 5-2.5 2.5-0

1

12 5mm~

12 3~5mm

Page 16: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

10,000 3mm

EME

1 2%.

Page 17: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2016 4 12 13: 30 16: 00

100mm

20mm 150mm

10,000 (4 ) 3mm

70 90

5%

Repeated flexural bending

Resilient modulus

Moisture sensitivity, Stripping

Potential)

Fatigue Test

Page 18: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

CBR

CBR

25 3

30 2.7 1000cc

4~10

Page 19: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2016 4 13 9: 30 12: 30

JACOBS

1.

2.

Austoroads Pavement Guide

Supplement

Roads and Marines

Empirical design methods, Mechanical design Methods

Empirical design method

Mechanical design methods

CIRCLY

Mr. Branco

Page 20: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Verification

Supervision, Hold Points, Non-

conformances, Certification(

spec

2

1

2

3

3 Liability

0.425mm PI

175mm

a) 150mm Capping layer

Page 21: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

b) Drains

c)

Page 22: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

ARRB

Mr. Michael Moffatt ( PIARC ) Mr. Kieran Sharp (REAAA

), Dr. Didier Bodin (Principal Research Engineer),

Mr. Shannon Malone (Laboratory Manager)

2016 4 14 12: 30 15: 30

ARRB

1.

2.

Austoroads Guide

ARRB

80%

Queensland Victoria

spec

Mechanistic design method

Mechanistic empirical design method

Mr. Mi chael

Page 23: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

1980 1984~7

1990

CBR

CBR

10

2 Standard Modified(

) Standard

100%

Natural gravel

Natural gravel

175mm

20mm

Aus+Stab Guide to Stabilization

2

0.1

ARRB 100 2

150 3

Page 24: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Servopac Gyropac

$10,000~$15,000 Servopac($20,000~$25,000)

1990

10,000

40,000

Page 25: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 26: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 27: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Invert Pavement

Plat Form

100%

40mm

200mm

TRH 60%

TRH-4 SARDS

South Africa Road Design System

TRH-4

G1

GAMES CRAMES

Ev Eh

E80 Traffic Axle Load Spectrum

weigh-in-motion

SANRAL

2 15

Page 28: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

SGC SGC

PG

6

HiMA

CSIR Dr.

Dee

SAPEM

Chapter14 15 SAPEM

Page 29: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

UK Research for

Community Access Partnership (ReCAP)

Low Volume Road DCP

Design

SANRAL SARDS

Empirical-Mechanical-Probability

MePAD MeGAME

SABITA TRH-8 Low,

Middle, High

CSIR

150mm As Base

40-50mm As

Page 30: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

1970 80

Brush Test

PG

Workability Durability

Fatigue

2 1 High Modulus

Asphalt

Bailey Method (US)

SABITA TRH-8

Page 31: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 32: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

PI Professional Indemnity

Insurance UK

PI

PI

1

Process Control Quality Control

National Judicative System

Page 33: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Material

Engineer

Page 34: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Double Seal DBST

As

As D=200mm 1%

5% As

Emulsion Treatment Base

50mm Asphalt Concrete

2 3

2 Co

45

500

4.6%

26mm

4.2%

Page 35: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

lime stone

ACV Aggregate Crushing Value

Zambia

SATAC

Geotextile PVC

T2

Inverted Seal

48 14

Process Control 100%

Quality Control 50:50

Professional Indemnity PI

10

Latent Defect

5% 10% retension 1 2

Insurence Bond

Page 36: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Lusaka Project

Manager Resident Engineer Assistant

Resident Engineer Geometric Surveyer

Material Engineer Material Technician 2

Inspector 2 8 Quantity Surveyer

Assistant Resident Engineer

Lusaka Project Engineer

Resident Project Engineer

Resident Project Engineer

Regional Manager

EU AfDB F/S D/D

D/D

Construction

Management Plan

Method Statement

Quality Assurance Plan

Client

Page 37: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

1981 2001

Weigh Bridge

MCC

No Quality Control

Page 38: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

SATCC

RDA

PM RE Assistant RE

CAD

Assistant RE Material/Pavement Engineer

RDA FS+DD DR+SV

DR

DD

DR 2 3

DR

PI

Page 39: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

Service Contract

Quality Management Plan

Environmental Management Plan

works Contract

Construction Plan

Plan

Tokyo Way

Page 40: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

DG

DG

Page 41: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

ODA

ODA

Page 42: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 43: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

53

Key Words

Page 44: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

54

Page 45: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

55

Page 46: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

56

Page 47: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

57

Page 48: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains

2000 12

58

Designing and Constructing SMA Mixtures

Page 49: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 50: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 51: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 52: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 53: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 54: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 55: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 56: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 57: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 58: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 59: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains
Page 60: 5 DBST - JICA · CIRCLY Mr. Branco . Verification Supervision, Hold Points, Non-conformances, Certification(spec 2 1 2 3 3 Liability 0.425mm PI 175mm a) 150mm Capping layer . b) Drains