May 2014 Application Reference EN020001 Hinkley Point C Connection Project Design Drawings 132kV Overhead Lines Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 4.8.7 Document
9
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

May 2014Application Reference EN020001

Hinkley Point C Connection Project

Design Drawings 132kV Overhead Lines

Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

4.8.7Do

cum

ent

Page 2: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

44.5

10.8

18.2

TENSION

LATTICE PYLON

L8c D30 STD 400kV

TERMINAL

LATTICE PYLON

L8c DT STD 400kV

TERMINAL

LATTICE PYLON

L7(c) DT STD 132kV

JUNCTION

LATTICE PYLON

L4m DJT STD 132kV

SUSPENSION

LATTICE PYLON

L4m D STD 132kV

TENSION

LATTICE PYLON

L4m D30 STD 132kV

TENSION

LATTICE PYLON

L8c D60 STD 400kV

6.8

11.28.7

TENSION

LATTICE PYLON

L4m D60 STD 132kV

SUSPENSION

LATTICE PYLON

L8c D STD 400kV

TERMINAL

LATTICE PYLON

L4m DT STD 132kV

8.4

VARIES

13.4

26.1

14.3

12.4

26.2

26.0

26.3

26.5

25.8

4.0

5.7

TERMINAL

LATTICE PYLON

L12 DT 400kV

46.5

7.1

45.3

18.6

45.8

19.4

49.0

49.0

43.8

17.1

17.5

25.6

46.3

3.0 3.0 3.0

4.8 5.35.3 5.4

10.89.67.4

7.5 9.1 10.9 14.5

2.3 2.0

46.4

45.3

17.9

6.2

12.4

12.4

6.2

22.9

18.2

2.0

35.3

m

31m 31m31m

22.5m 22.8m

21.2

m

21.1

m

21.1

m

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

Notes

SHEET 1 OF 1 SHEET 1 OF 1

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

CAD

A1

TENSION

LATTICE PYLON

L12 D10 400kV

TENSION

LATTICE PYLON

L12 D25 400kV

TENSION

LATTICE PYLON

L12 D55 400kV

TENSION

LATTICE PYLON

L12 D90 400kV

SUSPENSION

LATTICE PYLON

L12 D 400kV

B 02/12/13 LK GYUsage

Updated for Rev 7 Plan Structure GY

16.6

21.4

C LK GY GY05/12/13Diamond terminal

Updated Gantry and removed

5.2125.2 5.2125.2

20897

15 13205 50

ALL DIMENSIONS IN METRES

JBLKD MAY '14

EN020001

13/NG/0280

PINS SHEET 63 OF 70

PYLON OUTLINES

132kV AND 400kV

1 : 450

D

SHEET 63 OF 70

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

35.2

m

35.2

m

FOR DCO SUBMISSION LD

SUSPENSION

400kV T PYLON

FLYING ANGLE

400kV T PYLON D10

GANTRY TERMINAL

400kV T PYLON

TENSION

400kV T PYLON D30

29.1

9.0

TERMINAL

132kV 4 WIRE 2 POLE

SUSPENSION

132kV 4 WIRE 2 POLE

TERMINAL

HEAVY ANGLE

132kV 4 WIRE 2 POLE

22.5m

21.5

13.6

6.7

18.2

14.0

76.5

SUSPENSION

LATTICE PYLON

L12 D E30 400kV

AVON RIVER CROSSING

14.5

Page 3: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

0

10

20

30

40

50

TO

PP

YL

ON

GR

OU

ND

SE

CTIO

NR

OU

TE

LAND USE

(m)

CH

AIN

AG

E

(AO

D)

ELE

VA

TIO

N

5.2

5

293.2m

0

10

20

30

40

TO

PP

YL

ON

GR

OU

ND

SE

CTIO

NR

OU

TE

LAND USE

(m)

CH

AIN

AG

E

(AO

D)

ELE

VA

TIO

N

ARABLE

305.9m

ARABLE

TO

PP

YL

ON

GR

OU

ND

SE

CTIO

NR

OU

TE

LAND USE

(m)

CH

AIN

AG

E

(AO

D)

ELE

VA

TIO

N

0

10

20

30

40

TO

PP

YL

ON

GR

OU

ND

SE

CTIO

NR

OU

TE

LAND USE

(m)

CH

AIN

AG

E

(AO

D)

ELE

VA

TIO

N

AT25R - AT26R293.2m

SAG 8.45m

0.0

ARABLE

ARABLE ARABLE ROAD ROAD ROADARABLE ARABLE ARABLE

4.7

9293.2

ARABLE

4.7

90.0

4.9

1305.9

5.0

3597.2

5.1

4854.4

5.2

41114.3

5.2

40.0

4.9

7

4.7

1

229.3

598.6

4.7

10.0

5.4

8216.0

Y=161128.57X=341058.20

29.1mL4m D E3

AT31

Y=160782.77X=341419.23

26.3mL4m DT STD

AT33

SAG 9.52m SAG 8.54m

SAG 5.53m

TR

AC

K

PASTURE

TR

AC

K

PASTURE

TR

AC

K

PASTURE

TR

AC

K

PASTURE PASTURE

31.7

8

30.7

1

30.7

1

32.1

0

31.2

4

31.2

4

26.2

6

26.1

6

32.0

4

30.5

9

30.5

9

34.4

6

216.0m

AT32 - AT33216.0m

Y=160881.49X=341227.11

26.0mL4m D30 STD

AT32

Y=161375.64X=340889.29

26.0mL4m D30 STD

AT30

291.3m

Y=160881.49X=341227.11

26.0mL4m D30 STD

AT32

SAG 8.67m

Y=162148.71

X=340652.73

29.1m

L4m D E3

AT27R

Y=161870.14

X=340737.97

26.1m

L4m D STD

AT28R

Y=161624.25

X=340813.22

26.1m

L4m D STD

AT29

SAG 6.64m SAG 6.76m

SAG 8.65m

Y=162531.94

X=340284.43

29.2m

L7c DT E3

AT25R

Y=162441.20

X=340563.23

25.8m

L4m D60 STD

AT26R

Y=162441.20

X=340563.23

25.8m

L4m D60 STD

AT26R

Y=161375.64

X=340889.29

26.0m

L4m D30 STD

AT30

299.3m 299.3m

AT30 - AT32598.6m

AT26R - AT301114.3m

257.1m 260.0m

Y=143249.88X=334265.22

26.2mL16 D30 STD

BW29

CFK JB PB

CAD

A120897

SHEET 1 OF 1 SHEET 1 OF 1

01_12342_61

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

1:200013/NG/0276

Notes

Key

A FOR S.42 & S.47 CONSULTATION

AUG '13

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

MAY '14 CFK LD JB

EN020001

132kV OHL SECTIONS

PINS SHEET 64 OF 70

SHEET 64 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

SECTION LABELS:

- RIGHTRT- LEFTLT

- PYLON DEVIATION

- PYLON POSITION

- PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

PYLON LABELS:

VEGETATION

GROUND PROFILE

6.7m GROUND CLEARANCE LINE

PHASE CONDUCTOR

EARTHWIRE

8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

6. LOCATION AND HEIGHT OF PYLONS ARE DATA

5. GROUND LINE IS TAKEN FROM LSTC SURVEY IS IN ACCORDANCE WITH ENATS 43-8

4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

3. ROUTE IS PROFILED FOR 6.7m MINIMUM 2. CONDUCTOR SAGGED FOR 75°C OPERATION1. CONDUCTOR: UPAS 300mm² AAAC

ROUTE REFERENCE: AT

WESTON TO SANDFORD

PYLONS AT25R - AT33

B

B FOR DCO SUBMISSION

Page 4: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

Y=143249.88X=334265.22

26.2mL16 D30 STD

BW29

CFK JB PB

CAD

A120897

SHEET 1 OF 1 SHEET 1 OF 1

01_12342_59

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

SAG 2.6m

0

10

20

30

40

1:2000

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

06.2

35.4

PASTUREPASTURETRACK

TO

PP

YL

ON

LANDFILSITE

42.2

9.2

278.1

40.5

8.3

437.4

SAG 7.9m SAG 4.6m

0

10

20

30

40

TO

PP

YL

ON

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

06.8

39.0

34.1

7.9

184.6

PASTURE

0

10

20

30

40

TO

PP

YL

ON

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

032.1

38.8

6.6

227.1

PASTURE

RO

UG

H

PLANTATION

227.1m

SAG 4.0mSAG 3.3m

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

022.6

48.8

27.1

51.2

27.4

51.5

185

389.8

777.5

PASTUREARABLE ROUGH ARABLE

0

10

20

30

40

50

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

017.8

46.4

0

10

20

30

40

50

15.4

42.5

ARABLE ARABLEPASTURE

SAG 7.0m

264.1

SAG 6.0m

21.0

46.0

6.0

line angle = 00° 00'Y = 179704.3X = 354164.4

26.2mL7(c) DT STD

G31R

line angle = 4° 26' RTY = 179920.0X = 354241.6

32.3mL7(c) D30 E6

G32

14° 54' LTY = 181951.0X = 353996.6

32.3mL7(c) D60 E6

G41

line angle = 00° 00'Y = 182069.3X = 353854.9

26.2mL7(c) DT STD

G42R

line angle = 00°00'Y = 169444.3X = 345573.6

26.2mL7(c) DT STD

W36R

line angle = 00°00'Y = 169261.7X = 345543.8

24.2mPL1 D2 STD

W37

line angle = 00°00'Y = 169058.9X = 345511.0

24.2mPL1 D2 STD

W38

SAG 14.4m

line angle = 20°11' RTY = 162310.6X = 345476.1

28.6mPL16 D60 E10

W69

line angle = 24°09' RTY = 162238.6X = 345221.8

27.2mPL16 DT90 STD

N1

line angle = 00°00'Y = 168676.6X = 345448.3

25.0mPL1 D10 E10

W39

line angle = 00° 00'Y = 182139.8X = 353786.9

29.2mL7(c) DT E3

DA2R

line angle = 00° 00'Y = 182136.6X = 354064.9

33mL7(c) D E6

DA3

line angle = 4° 20' LTY = 182134.8X = 354222.4

32.3mL7(c) D30 E6

DA4

185m 204.8m 387.7m 264.1m

184.6m159.4m278.1m

TO

PP

YL

ON

TO

PP

YL

ON

RECLAIMED LAND

13/NG/0277

A FOR S.42 & S.47 CONSULTATION

AUG '13

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

MAY '14 LD

132kV OHL SECTIONS

ROUTE REFERENCE:

DA - SEABANK TO IRON ACTON

G - AVONMOUTH TO SEABANK

W - PORTISHEAD TO CHURCHILL

PINS SHEET 65 OF 70

EN020001

SHEET 65 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

CFK

Notes

Key

SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

SECTION LABELS:

- RIGHTRT- LEFTLT

- PYLON DEVIATION

- PYLON POSITION

- PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

PYLON LABELS:

VEGETATION

GROUND PROFILE (NO SURVEY DATA)

GROUND PROFILE

6.7m GROUND CLEARANCE LINE

PHASE CONDUCTOR

EARTHWIRE

DA2R - DA4437.5m

G31R - G32227.1m

G41 - G42R184.6m

W36R - W39777.5m

W69 - N1264.1m

8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

7. A NUMBER OF TREES WILL NEED TO BE SPECIFIED WITHIN THE DCOCHANGE WITHIN THE LIMITS OF DEVIATION PYLONS ARE INDICATIVE AND SUBJECT TO

6. LOCATION AND HEIGHT OF REPLACEMENT DATA WHERE AVAILABLE

5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

3. ROUTE IS PROFILED FOR 6.7m MINIMUM 2. CONDUCTOR SAGGED FOR 75°C OPERATION

W ROUTE - UPAS 300mm² AAACG ROUTE - UPAS 300mm² AAACDA ROUTE - RUBUS 500mm² AAAC

1. CONDUCTOR:

B FOR DCO SUBMISSION JB

B

Page 5: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

SAG 9.6m

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

TO

PP

YL

ON

6.9

43.1

37.4

0

10

20

30

40

1845.1

2076.1

ARABLEORCHARDPASTURE PASTURE

11.3

34.0

13.0

SAG 4.96mSAG 7.17m

line angle = 00° 00'Y = 176672.15X = 349533.21

27.1L16 D2 STD

BW34

line angle = 00° 00'Y = 176724.46X = 349259.15

30.1L16 D2 E10

BW35

line angle = 00° 00'Y = 176767.77X = 349032.25

26.16L7(c) DT STD

BW36R

1566.1

0

10

20

30

40

PASTURE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0

TO

PP

YL

ON

8.2

34.3

SAG 4.0m

6.7

182.3

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0

TO

PP

YL

ON

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0

TO

PP

YL

ON

7.3

33.2

7.0

180.7

9.8

339.6

33.5

9.2

38.4

ROUGHPARKCAR

PARKCAR

ROUGH

0

10

20

30

40

0

10

20

30

40

line angle = 14° 54' RTY = 181973.7X = 354025.5

32.3L7(c) D60 E6

BW3

line angle = 00°00'Y = 182089.2X = 353884.5

26.2L7(c) DT STD

BW2R

line angle = 31° 23' RTY = 176524.8X = 351635.3

26.2L16 D60 STD

BW27

line angle = 12° 47' RTY = 176378.5X = 351071.5

26.2L16 D30 STD

BW29

39.0

36.0

SAG 2.31m

231.00m279.00m

330.31m182.32m 108.76m

line angle = 00° 00'Y = 176454.6X = 351552.2

26.16L7(c) DT STD

BW28R

line angle = 00° 00'Y = 176411.4X = 351400.2

29.21L7(c) DT E3

BW29A

BW29 - BW36RMODIFIED SECTION LENGTH 2076.07m

BW2R - BW3 182.32m

BW27 - BW28R108.76m

BW29A - BW29330.31m

Y=143249.88X=334265.22

26.2mL16 D30 STD

BW29

WALL

CFK JB PB

CAD

A120897

SHEET 1 OF 1 SHEET 1 OF 1

01_12342_60

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

1:200013/NG/0278

A FOR S.42 & S.47 CONSULTATION

AUG '13

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

MAY '14 CFK JB

PINS SHEET 66 OF 70

EN020001

132kV OHL SECTIONS

ROUTE REFERENCE:

BW - SEABANK TO PORTISHEAD

SHEET 66 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

Notes

Key

SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

SECTION LABELS:

- RIGHTRT- LEFTLT

- PYLON DEVIATION

- PYLON POSITION

- PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

PYLON LABELS:

VEGETATION

GROUND PROFILE

6.7m GROUND CLEARANCE LINE

PHASE CONDUCTOR

EARTHWIRE

8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

7. A NUMBER OF TREES WILL NEED TO BE SPECIFIED WITHIN THE DCOCHANGE WITHIN THE LIMITS OF DEVIATION PYLONS ARE INDICATIVE AND SUBJECT TO

6. LOCATION AND HEIGHT OF REPLACEMENT DATA

5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

3. ROUTE IS PROFILED FOR 6.7m MINIMUM 2. CONDUCTOR SAGGED FOR 75°C OPERATION

BW ROUTE BW9 TO BW39 - ZEBRA 400mm² ACSRBW ROUTE BW1 TO BW9 - RUBUS 500mm² AAAC

1. CONDUCTOR:

B FOR DCO SUBMISSION

LD

B

Page 6: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

Y=143249.88X=334265.22

26.2mL16 D30 STD

BW29

CFK JB PB

CAD

A120897

SHEET 1 OF 1 SHEET 1 OF 1

01_12342_62

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

1:2000

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0 0 0 0

0

16.6

41.6

13.5

40.0

13.5

40.0

12.1

24.6

12.1

24.6

11.1

27.1

10.1

26.6

10.1

26.6

10.8

22.3

10.8

22.3

10.6

23.1

13.5

40.0

12.9

25.3

2031.0

2227.8

32.6

82.5

172.9

57.5

18.8

31.2

PASTURE

RO

AD

PASTURE

AR

AB

LE

AR

AB

LE

PA

ST

UR

E

PASTURE

TR

AC

K

PLANTATION PLANTATION

PL

AN

TA

TIO

N

AR

AB

LE

PA

ST

UR

E

PASTURE

TR

AC

K

PLANTATION PLANTATION

PL

AN

TA

TIO

N

13/NG/0279

TO

PP

OLE

TO

PP

OLE

TO

PP

OLE

TO

PP

YL

ON

TO

PP

YL

ON

TO

PP

YL

ON

A FOR S.42 & S.47 CONSULTATION

AUG '13

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

MAY '14 LD

EN020001

132kV OHL SECTIONS

ROUTE REFERENCE:

N - CHURCHILL TO SANDFORD

PINS SHEET 67 OF 70

SHEET 67 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

CFK

Notes

Key

SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

SECTION LABELS:

- RIGHTRT- LEFTLT

- PYLON DEVIATION

- PYLON POSITION

- PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

PYLON LABELS:

VEGETATION

GROUND PROFILE

6.7m GROUND CLEARANCE LINE

PHASE CONDUCTOR

EARTHWIRE

8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

6. LOCATION AND HEIGHT OF PYLONS ARE DATA

5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

3. ROUTE IS PROFILED FOR 6.7m MINIMUM 2. CONDUCTOR SAGGED FOR 75°C OPERATION1. CONDUCTOR: UPAS 300mm² AAAC

B FOR DCO SUBMISSION JB

B

SAG 0.9m

32.6m

N15R - N16A32.6m

N16A - N18A172.9m

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

DLAND USE

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0 0 0

12.9

25.3

11.8

27.8

10.7

27.1

10.7

27.1

12.1

23.6

12.1

23.6

12.0

24.5

line angle = 00° 00'Y = 160234.3X = 341961.1

25.0PL1 D2 E10

N14

line angle = 60° 52' RTY = 160154.6X = 341781.1

26.5L4m DJT STD

N15R

line angle = 19° 10' RTY = 160174.2X = 341755.1

12.4TERMINAL WOOD POLE

N16A

line angle = 57° 30'Y = 160318.8X = 341660.1

16.4ANGLE WOOD POLE

N18A

line angle = 57° 19'Y = 160371.0X = 341684.2

11.4ANGLE WOOD POLE

N19A

line angle = 00° 00'Y = 160242.7X = 341709.1

16.0INTERMEDIATE WOOD POLE

N17A

SAG 3.9m SAG 2.3m SAG 2.7m SAG 1.6m SAG 0.5m

SAG 2.4m SAG 1.8m SAG 0.7m

196.8m

83.2

162.5

65.7

25.3

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

0

10

20

30

40

25.3m65.7m

SAG 2.2m

79.3m83.2m

18.8m57.5m90.4m82.5m

TO

PP

OLE

TO

PP

OLE

TO

PP

OLE

N7 - N15RMODIFIED SECTION LENGTH 2227.8m

N18A - N19A57.5m

N19A - N20A18.8m

line angle = 00° 00'Y = 160386.8X = 341674.1

12.4TERMINAL WOOD POLE

N20A

line angle = 97° 16' RTY = 160154.6X = 341781.1

26.5L4m DJT STD

N15R

line angle = 17° 13'Y = 160184.6X = 341772.2

12.4TERMINAL WOOD POLE

N16B

line angle = 00° 00'Y = 160253.7X = 341725.8

16.0INTERMEDIATE WOOD POLE

N17B

line angle = 57° 19'Y = 160380.1X = 341710.4

11.4ANGLE WOOD POLE

N19B

line angle = 57° 30'Y = 160320.4X = 341682.9

16.4ANGLE WOOD POLE

N18B

line angle = 00° 00'Y = 160401.4X = 341696.8

12.4TERMINAL WOOD POLE

N20B

SAG 0.9m

31.2m

N15R - N16B31.2m

N16B - N18B162.5m

N18B - N19B65.7m

N19B - N20B25.3m

Page 7: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

Y=143249.88X=334265.22

26.2mL16 D30 STD

BW29

CFK JB PB

CAD

A120897

SHEET 1 OF 1 SHEET 1 OF 1

01_12342_63

NG INVESTMENT No. APPLICATION No.

NG DRAWING No. DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

1:2000

SAG 3.3m

0

10

20

30

40

TO

PP

YL

ON

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE PASTURE

168.2m

line angle = 44°19' LTY = 162310.6X = 345476.1

28.6mPL16 D60 E10

W69

line angle = 95°39' LTY = 162150.9X = 345423.5

29.5mL4m DJT E3

Y1R

TO

PP

YL

ON

(m)

CH

AIN

AG

E(A

OD)

ELE

VA

TIO

N

RO

UT

ES

EC

TIO

NG

RO

UN

D

LAND USE

0

0

10

20

30

40

50

ARABLE

LA

NE

46.4

17.8

0

168.2

17.3

46.8

212.5m 203.3m 287.1m 333.5m

SAG 11.3mSAG 8.4mSAG 4.2mSAG 4.6m

line angle = 95°39' LTY = 162150.9X = 545423.5

29.5mL4m DJT E3

Y1R

line angle = 00°00'Y = 162105.5X = 345626.2

26.3mPL16 D2S STD

Y2

line angle = 00°00'Y = 162061.3X = 345823.0

29.3mPL16 D2S E10

Y3

line angle = 00°00'Y = 161998.9X = 346102.5

26.3mPL16 D2S STD

Y4

line angle = 03°26' LTY = 161925.7X = 346428.6

25.7mPL16 D10

Y5

17.3

46.8

212.5

18.4

44.7

415.8

702.9

1036.3

17.8

47.1

14.8

41.1

15.9

25.7

ARABLEPASTUREPASTURE

DIT

CH

RIV

ER Y

EO

PASTURE ARABLE

A FOR S.42 & S.47 CONSULTATION

13/NG/0281

AUG '13

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITYTRANSMISSION Plc

MAY '4 LD

132kV OHL SECTIONS

ROUTE REFERENCE:

W - PORTISHEAD TO RADSTOCK

Y - CHURCHILL TO RADSTOCK

PINS SHEET 68 OF 70

EN020001

SHEET 68 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

CFK

Notes

Key

SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

SECTION LABELS:

- RIGHTRT- LEFTLT

- PYLON DEVIATION

- PYLON POSITION

- PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

PYLON LABELS:

VEGETATION

GROUND PROFILE

6.7m GROUND CLEARANCE LINE

PHASE CONDUCTOR

EARTHWIRE

Y1R - Y51036.3m

W69 - Y1R168.2m

8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

7. A NUMBER OF TREES WILL NEED TO BE SPECIFIED WITHIN THE DCOCHANGE WITHIN THE LIMITS OF DEVIATION PYLONS ARE INDICATIVE AND SUBJECT TO

6. LOCATION AND HEIGHT OF REPLACEMENT PROFILES AND LSTC SURVEY DATA

5. GROUND LINE IS TAKEN FROM EXISTING WPD IS IN ACCORDANCE WITH ENATS 43-8

4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

3. ROUTE IS PROFILED FOR 6.7m MINIMUM 2. CONDUCTOR SAGGED FOR 75°C OPERATION1. CONDUCTOR: UPAS 300mm² AAAC

B

B FOR DCO SUBMISSION JB

Page 8: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

CG

B 3133

B 3133

ETL

House

Gardner's Arms

12.6m

Pond

Stock

ETL

ET

L

ETL

17.1m

STOCK LANE

Track

19.2m

Drain

9.7m

Pond

Stoneycroft

Abdullam

Bridle

way

Cottage

Stable

Cottage

Mast

BS

0.9

1m

RH

0.9

1m

RH

CADNG INVESTMENT No. APPLICATION No.

NG DRAWING No.

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

Notes

Site MapSite Map

SHEET 1 OF 1 SHEET 1 OF 1

13/NG/0282

20897 EN020001

28_12342_80

A1

132kV Cable to be installed

132kV Overhead line to be removed

CFK

Cable sealing end platform pylon

Y1RY1

Y2

N1

1 : 1000

Key

Existing

132kV Overhead line to be installed

Order Limits

Pylon to be removed

Typical pylon

NORTH SOMERSET COUNCIL

SHEET 69 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

Reference Drawings

ONLY

CABLE ROUTE SHOWN IS INDICATIVE

A

A

PINS SHEET 69 OF 70

AND CABLE ENTRIES

132kV OVERHEAD LINE

132kV SUBSTATION

CHURCHILL

SUBSTATION132kVCHURCHILL

W69

PLAN 13/NG/0259 (PINS SHEET 35)

CHURCHILL 132kV SUBSTATION SITE

FOR DCO SUBMISSIONMAY '14 LD JB

Page 9: 4.8.7 Design Drawings - 132kV Overhead Lines(1)

Chy

Tank

Drain

Drain

ETL

Drain

Tank

Drain

Tank

ETL

Drain

SE

VER

N R

OA

D

6.7m

Tanks

ETL

Crook's Marsh

Tk

Drain

Drain

Drain

ETL

ETL

Drain

Pond

Drain

ABLET

ON L

ANE

6.6m

Drain

Drain

Drain

Drain

Drain

FB PondDrain

AB

LE

TO

N

LA

NE (T

RA

CK)

Drain

Drain

6.4m

Mast

Ramp

Depot

Pond

Path

Depot

Depot

SD

FF

Boro

Const

&

UA

Bdy

Boro Const

&

Co Const

& CP Bdy

UA

Bdy R

H

SD

Def

FF

Co

Const

&

CP

Bdy

Und

Def

Boro

Const

&

UA

Bdy

RH

CADNG INVESTMENT No. APPLICATION No.

NG DRAWING No.

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

DRAWING No. SCALE

ISSUE

TITLE:

ISSUE DATE COMMENTS CHK'D APP'DDRAWN

Notes

Key

Site MapSite Map

20897

28_12342_8113/NG/0283

DA2R

BW2R

G42R

DA2

BW2

G42

BW3

G41

G43

BW1

DA1

A1

SHEET 1 OF 1 SHEET 1 OF 1

EN020001

CFK

1 : 1000

132kV Cable to be installed

132kV Overhead line to be removed

132kV Overhead line to be installed

Existing

Cable sealing end platform pylon

DA3

BRISTOL CITY COUNCIL

SHEET 70 OF 70 SHEETS

(REGULATION 5(2)(o))

DESIGN DRAWINGS

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

SUBSTATION

SEABANK 132kV

SUBSTATION

SEABANK 400kV

Typical pylon

Pylon to be removed

Reference Drawings

13/NG/0254 (PINS sheet 33)

13/NG/0253 (PINS sheet 32) and

SUBSTATION SITE PLAN

SEABANK 400kV/132kV

Order Limits

A

PINS SHEET 70 OF 70

AND CABLE ENTRIES

132kV OVERHEAD LINE

400kV/132kV SUBSTATION

SEABANK

ONLY

CABLE ROUTE SHOWN IS INDICATIVE

FOR DCO SUBMISSIONA MAY '14 LD JB