Mobily WiMAX-LTE Project Site Survey Report Mobily WiMAX-LTE Project Technical Site Survey Report Site ID: 4399 Site name: 4399 Support-structure Type: 7m RT 12m tower Equipment Type: SHELTER Prepared by HAYAT COMM Date Jan. 18, 2011 Reviewed by HUAWEI Tech., Co., Ltd. Date Reviewed by Date Approved by Date 6/6/2022 HUAWEI CONFIDENTIAL Page 1 of 42
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Mobily WiMAX-LTE Project Site Survey Report
Mobily WiMAX-LTE Project
Technical Site Survey Report
Site ID: 4399
Site name: 4399
Support-structure Type: 7m RT 12m tower
Equipment Type: SHELTER
Prepared by HAYAT COMM Date Jan. 18, 2011
Reviewed by HUAWEI Tech., Co., Ltd. Date
Reviewed by Date
Approved by Date
4/7/2023 HUAWEI CONFIDENTIAL Page 1 of 35
Mobily WiMAX-LTE Project Site Survey Report
Information of Site Surveyor
Company* Hayat Comm. Date* Jan. 18, 2011
Surveyor* Jitender Phone* 0569318474 Approve RecordHuaweiMW Approver DateBTS Approver DateRF Approver DateCW Approver Date Astelit TNO Approver Date RNO Approver Date CPO Approver Date CW Approver Date
Huawei Technologies Co., Ltd.All Rights Reserved
4/7/2023 HUAWEI CONFIDENTIAL Page 2 of 35
Mobily WiMAX-LTE Project Site Survey Report
Table of Contents
1 Common Information...................................................................4
1.1 Site Basic Information...........................................................................................5
1.2 Information of indoor site.....................................................................................5
1.3 Information of outdoor site...................................................................................5
1.4 Site Access............................................................................................................6
1.5 Road Access to the Site.........................................................................................6
1.6 Security Status of the Site.....................................................................................6
Huawei IDU Type RTN910 RTN950 Others:_______________
Quantity of New MW Antennas 1 2 3 4 5 6 Others:_______________
New MW Antennas Antenna 1Antenna
2Antenna
3Antenna 4
Antenna 5
Antenna 6
Enough space for new antenna Yes No Yes N
o Yes No Yes No Yes No
Enough cable tray for new IF cableYes No Yes N
o Yes No Yes No Yes No
Diameter/Polarization 1.2
Height (m) 18
Antenna mounting type
Azimuth from Magnetic North(deg) 233.48
4/7/2023 HUAWEI CONFIDENTIAL Page 9 of 35
Mobily WiMAX-LTE Project Site Survey Report
Frequency Band (GHz)
Link Capacity
Hop Distance (km) 2.17
Far End Site ID 6480
Planned RX level
Fade Margin
Annual Availability
IF Cable Length (m)
Protection Type
Enough Space for new IDU Yes No
Transmission Rack Type(attach the picture)
Note:-
1.16 Microwave Link budget
1.17 Block
Information(Exchange Site)
Blocks Space Is there enough space for New TRM RACK(EN3B19inch2m)
1 Available Yes No
2 Available Yes No
3 Available Yes No
4 Available Yes No
4/7/2023 HUAWEI CONFIDENTIAL Page 10 of 35
We will submit separately with LOS
Note:- Attach Pathloss result.
Mobily WiMAX-LTE Project Site Survey Report
5 Available Yes No
6 Available Yes No
7 Available Yes No
8 Available Yes No
Note:- Block 8 is available.
1.18 DCDB & HVAC Height Information DCDB To Floor Height 1.75m HVAC To Floor Height 1.2mHVAC To Rack Distance (Block # 8 or 7 or 6) 2m
1.19 Shelter Temperature Shelter Temperature 32.1 C
2 Site RF Survey
2.1 Environment Information
2.2 Panorama AnalysisTable2-1 Photo of 4399 site and entironment
4/7/2023 HUAWEI CONFIDENTIAL Page 11 of 35
Mobily WiMAX-LTE Project Site Survey Report
4399 Tower location
Sector 1 0 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 12 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 2 120 deg.
Sector 3 240 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 13 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 1 antenna installation environment
Sector 2 antenna installation environment
4/7/2023 HUAWEI CONFIDENTIAL Page 14 of 35
Mobily WiMAX-LTE Project Site Survey Report
Sector 3 antenna installation environment
0 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 15 of 35
Mobily WiMAX-LTE Project Site Survey Report
30 deg.
60 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 16 of 35
Mobily WiMAX-LTE Project Site Survey Report
90 deg.
120 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 17 of 35
Mobily WiMAX-LTE Project Site Survey Report
150 deg.
180 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 18 of 35
Mobily WiMAX-LTE Project Site Survey Report
210 deg.
240 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 19 of 35
Mobily WiMAX-LTE Project Site Survey Report
270 deg.
300 deg.
330 deg.
4/7/2023 HUAWEI CONFIDENTIAL Page 20 of 35
Mobily WiMAX-LTE Project Site Survey Report
Evaluation of Greenfield
2.3 RF parameters Table2-2 Table of RF parameters
Sector 1 Sector 2 Sector 3Cell ID 4399
Type of antenna
Manufactory Kathrein 742265
Kathrein 742265
Kathrein 742265
Width of level lobe 65° 65° 65°Gain of antenna 18 dBi 18 dBi 18 dBi
Height of ant (midpoint of ant)
19m 19m 19m
Azimuth (deg) 0 120 240Electrical downtilt 0 0 0Mechanical downtilt 1 1 1Length of feeder(m) 50m 50m 50mType of feeder(inch) 7/8” 7/8” 7/8”Supporting method of ant 9M TOWER 9M TOWER 9M TOWER
Supporting structure of antType of fixing RT RT RTHeight(m) 19m 19m 19m
TMA(Y/N) N N N
2.4 Site Photos
4/7/2023 HUAWEI CONFIDENTIAL Page 21 of 35
Mobily WiMAX-LTE Project Site Survey Report
Door label
Existing equipments pictures
4/7/2023 HUAWEI CONFIDENTIAL Page 22 of 35
Mobily WiMAX-LTE Project Site Survey Report
4 sides of shelter
4/7/2023 HUAWEI CONFIDENTIAL Page 23 of 35
Mobily WiMAX-LTE Project Site Survey Report
DDF
Indoor Grounding Bus Bar
4/7/2023 HUAWEI CONFIDENTIAL Page 24 of 35
Mobily WiMAX-LTE Project Site Survey Report
Out Door Grounding
Tower Feeder System / Tray / Ladder
4/7/2023 HUAWEI CONFIDENTIAL Page 25 of 35
Mobily WiMAX-LTE Project Site Survey Report
Access Road
Site Access
4/7/2023 HUAWEI CONFIDENTIAL Page 26 of 35
Mobily WiMAX-LTE Project Site Survey Report
Cable ladder Indoor
Cable ladder Outdoor
4/7/2023 HUAWEI CONFIDENTIAL Page 27 of 35
Mobily WiMAX-LTE Project Site Survey Report
Roxtec from Outdoors
Roxtec from Indoors
4/7/2023 HUAWEI CONFIDENTIAL Page 28 of 35
Mobily WiMAX-LTE Project Site Survey Report
Existing DC Power system
Proposed breaker picture
4/7/2023 HUAWEI CONFIDENTIAL Page 29 of 35
63A Available
Mobily WiMAX-LTE Project Site Survey Report
Space available for New wimax antenna.
No space in Existing Tower for new Wimax Antenna Sector 1
Existing Tower for new Antenna Sector 2
4/7/2023 HUAWEI CONFIDENTIAL Page 30 of 35
Existing 2G&3G Antenna Existing 2G&3G Antenna
Existing 2G&3G Antenna Existing 2G&3G Antenna
Mobily WiMAX-LTE Project Site Survey Report
Existing Tower for new Antenna Sector 3
Proposed RRU RACK Location
4/7/2023 HUAWEI CONFIDENTIAL Page 31 of 35
PROPOSED RRU RACK LOCATION
Existing 2G&3G Antenna Existing 2G&3G Antenna
Mobily WiMAX-LTE Project Site Survey Report
Feeder Window Location Existing or Proposed
Space for new TRM Rack
4/7/2023 HUAWEI CONFIDENTIAL Page 32 of 35
Existing Feeder Window Location
Space Available
Mobily WiMAX-LTE Project Site Survey Report
Proposed BBU Location
Existing MW Antenna picture
4/7/2023 HUAWEI CONFIDENTIAL Page 33 of 35
MWSize: 0.3mAz: 125°Ht:19m
Space Available for
BBU and IDU
Mobily WiMAX-LTE Project Site Survey Report
Proposed New Micro Wave
2.5 Drawings
Site layout with outdoor proposed requirement like gantry, cable tray, Bus bar, new opening, new equipment Etc.
Existing and Proposed floor layout Existing and proposed Antenna drawings Existing and Proposed cable ladder drawings. Existing and proposed Dc connection drawings.