Document Version 2.0 BHE-123 A TSSR Revision Track Revision Date Name Revision description 1 2 SITE SURVEY PARTICIPANTS: SA (Subco) - Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) RF Planner (Subco) - Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) TRS Planner (Subco)- Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) CW Surveyor (Subco)- Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) HUAWEI Supervisor - Daud (Company, Name & Phone #, Signature) Owner - (it is enough if signature is on the sketch) Man Kumari Gurung (Company, Name & Phone #, Signature) Checked by HUAWEI Name&Position&Signature: Received by NCELL: (Name & Signature & Date) NOTE: NCELL should convey any objections in 48 hours otherwise the document is deemed as excepted. Checked by NCELL Name&Position&Signature: Comments: Version: 2.0 Date: __________ TSSR TECHNICAL SITE SURVEY REPORT NCELL GSM Project ITE ID (with candidate letter): Approved date Rejected date Approved date Rejected date
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Document Version 2.0
BHE-123 A
TSSR Revision Track
Revision Date Name Revision description
12
SITE SURVEY PARTICIPANTS:
SA (Subco) - Mast/Saroj Yadav/9801122332(Company, Name & Phone #, Signature)
Transmission equipments Other site to be marked in panoramic photos!
Azimuth 4 Height 25 Antenna Size 0.6
Farend Type
IDU space Now Connected MaxPhoto
Lease Line TR Comments:Backbone Site
Repeater
NWP
No. of E1 (Single Band-1E1, Dual Band-2E1)
Antenna Size / Polarization
Azimuth (deg)
Height of Antenna
MW Configuration
Far End (Site 'B'
ID)
Hop Distance
(km)
frequency (GHz)
Feeder Length (m)
Feeder Type
Far End Feasibility Information:
Yes No Yes No
Stack Wall PoleOutdoor Indoor
1 E1 2 E1
Indoor
Outdoor
OKNOT OKAvailabl
eUnavailable
BHE123-A(ITS FAR END BHE414)
Farend Tower height30M
Layout diagram of the equipment placement at farend
FAREND IS PHASE-1 SITE /SPACE IS AVAILABLE FOR MW SPACE AVAILABILITY
PHOTOS FROM FAREND towards the surveyd Location Link direction site with Azimuth
provide clear photos ,should include the obstacles information ( trees , hills ) if any
If possible photo should shows the farend locatioin or its nearby other's Tower photo to certainfy link will happen But for longer hop link at least capture the photo in link direction
PHOTO OF THE BTS ROOM OF FAREND SITE SHOWING THE PLACE WHERE NEW EQUIPMENT AND DDF IS TO BE KEPT
Photo depicted the space of Installation of DDF either in the RACK or mounted on Wall. Need to see any space available for Wall Mount DDF
provide clear photos ,should include the overall equipments installed on Tower, can have many pics
NEW IDU place
Photo depicted the persent condition of Tower provide clear photos for avialablity of MCB in farend sites.
BHE123-A(ITS FAR END BHE414)
Space Availibilty Height at which MW antenna mountsyes 25m
Layout diagram of the equipment placement at farend
FAREND IS PHASE-1 SITE /SPACE IS AVAILABLE FOR MW SPACE AVAILABILITY
PHOTOS FROM FAREND towards the surveyd Location Link direction site with AzimuthAzimuth
provide clear photos ,should include the obstacles information ( trees , hills ) if any
If possible photo should shows the farend locatioin or its nearby other's Tower photo to certainfy link will happen But for longer hop link at least capture the photo in link direction
PHOTO OF THE BTS ROOM OF FAREND SITE SHOWING THE PLACE WHERE NEW EQUIPMENT AND DDF IS TO BE KEPT
Photo depicted the space of Installation of DDF either in the RACK or mounted on Wall. Need to see any space available for Wall Mount DDF
provide clear photos ,should include the overall equipments installed on Tower, can have many pics
Photo depicted the persent condition of Tower provide clear photos for avialablity of MCB in farend sites.
Distance of single phase line from site:… 40 ..… m
Capacity/type/ distance of corresponding transformer from the site 50KV
Distance of three phase line from site:… 40m
Capacity/type/ distance of corresponding transformer from the site ............. KVA…………... Phase…………. mDistance of 11 KV line from the site 350M
Distance of 33 KV line from the si N/A
Pole needed: No. of poles needed:1
Crossing needed: If yes:
Are there any Disturbances/ Obstactles during Line Extension/ Crossing:
Power Cable routу starts at … ELECTRIC POLE
by pass .. LT PANNEL
till … ACDB BOX.
CW
MS1A
Standard Application
Non-Standars Application, Site Design Drawings needed before CW start
MS3B
MS1A
Standard Application
Non-Standars Application, Site Design Drawings needed before CW start
MS1CMS1D
MS2MS3A
MS4MS5
MS7AMS7B
MS9
MS6
MS1EMS1F
MS1B
MS8
Yes
No
Yes
NoRoad
Private land
Building
River
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
AC power needed (KW): 12 Distance from the nearest point of tapping to the site 40 m
Generator needed: Generator space available: Transformer Needed:
Final AC power supply: Main AC Current Fuses (A):
Any other comment regarding AC power supply: THE SAME POLE CONTAINING 11KV & THREE PHASE.
Power Source coodniate 3 Phase: Latitude:28.83016 Longitude:81.70957
1 Phase: Latitude:28.83016 Longitude:81.70957
11KV: Latitude:28.82834 Longitude:81.70941
Temporary power available: If yes, available AC power:
Distance to temporary power source: m Owner willingness to provide temporary power
Contact person details for temporary power connection:
Tree cutting required: If yes, No. of trees to be cut for power line extension ______
No. of trees to be cut within plot area _______
Rooftop Site Electricity Info: New AC Power cable:
Space for transformer available: Space for Grounding available:
Grounding solution: Grounding cable size(mm2):If Generator needed is yes then it is confirmed with owner that there will be no problem in future to run DG
Greenfield Site electricity info: New AC Power cable:
Existing AC power supply: ----------------> If Yes:
Solar Site Info:
Clearance towards south east direction for Sunlight:
Enough space for solar Panels installation as per design in south east direction of plot:
If there is any shadow of Tree/Mountain/Building/Tower/Shelter on solar Panels in whole sunlight available time:
Any other comment regarding Solar:
If Greenfield Site:
Tower type:
Height of tower (m): 24M Other:
Characteristics of site area:
Other:
Soil investigation according to local requirements:
Comments:
Fence type needed for site: Chainlink Fence Length (m): 41.8m
How far is site from the nearest motorable road(m):
Backfilling is needed Heigth (m):
Permanent Road needed for access to site: Length (m):
Crane access possible: Lorry access possible:NO HEAD LOAD
Any weight restriction to the site: Head load needed: If yes: mHL start: Latitude: Longitude:HL finish Latitude: Longitude:NO TRACTORABLE ROADTractor load needed: If yes: mTL start: Latitude: Longitude:TL finish: Latitude: Longitude:
Any height/width restriction to the site:
Any parking restriction to the site:
Any over head power cables or other obstacles at the site:
Any undeground installation at the site:
Yes
No
Yes No
Existing
New
Shown in Sketch
YesYesY
es o
YesY
es
Yes
s
New lattice tower
New monopole
New guyed mast
Existing structure
Other
Yes
Above Ground
Below Ground
no
Yes
Overheaded
Undegrounded
Overheaded
Undergrounded
To be investigated
Yes
To be investigated
Clay, Mud or similar
Sand/Gravel
Tarmac
Concrete
Other
Yes No
230V Single Phase
380V Three Phase
Yes
No
Yes
No
Yes No
Yes
o
Yes
Yes
No
230V Single Phase
11kV380V Three Phase
s
No
Yes
No
Yes
No
Yes
No
Yes
No
CW
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
IF Rooftop Site:
Building Structure type:
Height of tower (m):
Height of rooftop above ground level (m): How many floors in the build?:
Is there elevator room on rooftop?: Weight limit of elevator (kg):
Elevator type: Size of elevator (m) H W D
Building condition: Сrane access possible
Head load needed: If yes: mHL start: Latitude: Longitude:HL finish: Latitude: Longitude:
Length of cable tray needed (m): 6m Length of ducting needed (m):
Comments about cable tray or ducting:
Equipment room Details:
Shelter location:
Shelter ice-protection needed
Equipment type:
Equipment shelter camouflage needed:
Details:
CW
Good
Public
Service
None
Average
Bad
YesYesYes
Yes
Roof
Ground
Technical floor
Elevator room
Other
Yes
Yes
Yes
Lattice tower
Pylon
Water tower
Chimney
Other
Stack indoor
Wall indoor
Wall outdoor
Other
Stack outdoor
___ Pole
____m Guyed mast
Existing Structure
TV tower
Other
Masonry
Reinforced Concrete
Steel
Other
RT existing
Yes
Yes
TSSR TECHNICAL SITE SURVEY REPORT
Autocad Drawings
Drawings Of: Top View
1 Square Correspond to: _0,5__m Scale: ______
DE
TA
ILS
TO
WE
R H
T
FO
UN
DA
TIO
N S
IZE
TO
WE
R C
/C
DG
SIZ
E
OD
BT
S S
IZE
24M
(T
RI. A
NG
UL
AR
)
(44
00
X4400
)MM
(28
59
X2859
)MM
(15
00
X2500
)MM
(15
00
X3100
)MM
TO
TA
L A
RE
AR
EQ
UIR
ED
(7.0
X14.5
)M
FE
NC
E L
EN
GT
H41.8
M (
with
out
Gua
rd R
oom
)
37.3
M (
with
Gu
ard
Ro
om
)
EP
-2
EP
-3
EP
-1E
QU
IPM
EN
T E
AR
TH
ING
LIG
HT
ING
PR
OT
EC
TIO
N E
AR
TH
ING
NE
UT
RA
L P
RO
TE
CT
ION
EA
RT
HIN
G
**
**
**
**
*
*****
**
**
**
**
2
4M
-GB
T T
RIA
NG
ULA
R T
OW
ER
440
0
2859
4400
3100
400
0
150
0
PR
OP
OS
ED
SH
ELT
ER
(FU
TU
RE
)
905
600
Min
ishe
lter
(Batter
y&
ID
U)
1085
905
For
Fut
ure
Exp
ansi
on For
Fut
ure
Exp
ansi
onT
P48
200A
X3H
O
DG
150
0
2500150
0
350
0
1500
150
0
Septic Tank (Option)
GUARD ROOM (optional)
NGL
100mm gravellayer
EP
-2
900
900
EP
-3
900
900
EP
-1
900
300
0
900
300
0
LT Panel
E.pole
600
1300 1300
750
1300
1050
100
0
1300
1300
7000
145
00
280
00
CW (Top)
DE
TA
ILS
TO
WE
R H
T
FO
UN
DA
TIO
N S
IZE
TO
WE
R C
/C
DG
SIZ
E
OD
BT
S S
IZE
24M
(T
RI. A
NG
UL
AR
)
(44
00
X4400
)MM
(28
59
X2859
)MM
(15
00
X2500
)MM
(15
00
X3100
)MM
TO
TA
L A
RE
AR
EQ
UIR
ED
(7.0
X14.5
)M
FE
NC
E L
EN
GT
H41.8
M (
with
out
Gua
rd R
oom
)
37.3
M (
with
Gu
ard
Ro
om
)
EP
-2
EP
-3
EP
-1E
QU
IPM
EN
T E
AR
TH
ING
LIG
HT
ING
PR
OT
EC
TIO
N E
AR
TH
ING
NE
UT
RA
L P
RO
TE
CT
ION
EA
RT
HIN
G
**
**
**
**
*
****
**
**
**
**
*
2
4M
-GB
T T
RIA
NG
ULA
R T
OW
ER
440
0
2859
4400
3100
400
0
150
0
PR
OP
OS
ED
SH
ELT
ER
(FU
TU
RE
)
905
600
Min
ishe
lter
(Batter
y&
ID
U)
1085
905
For
Fut
ure
Exp
ansi
on For
Fut
ure
Exp
ansi
onT
P48
200A
X3H
O
DG
150
0
2500150
0
350
0
1500
150
0
Septic Tank (Option)
GUARD ROOM (optional)
NGL
100mm gravellayer
EP
-2
900
900
EP
-3
900
900
EP
-1
900
300
0
900
300
0
LT Panel
E.pole
600
1300 1300
750
1300
1050
100
0
1300
1300
7000
145
00
280
00
BHE-123 A
DE
TA
ILS
TO
WE
R H
T
FO
UN
DA
TIO
N S
IZE
TO
WE
R C
/C
DG
SIZ
E
OD
BT
S S
IZE
24M
(T
RI. A
NG
UL
AR
)
(44
00
X4400
)MM
(28
59
X2859
)MM
(15
00
X2500
)MM
(15
00
X3100
)MM
TO
TA
L A
RE
AR
EQ
UIR
ED
(7.0
X14.5
)M
FE
NC
E L
EN
GT
H41.8
M (
with
out
Gua
rd R
oom
)
37.3
M (
with
Gu
ard
Ro
om
)
EP
-2
EP
-3
EP
-1E
QU
IPM
EN
T E
AR
TH
ING
LIG
HT
ING
PR
OT
EC
TIO
N E
AR
TH
ING
NE
UT
RA
L P
RO
TE
CT
ION
EA
RT
HIN
G
**
**
**
**
*
****
**
**
**
**
*
2
4M
-GB
T T
RIA
NG
ULA
R T
OW
ER
440
0
2859
4400
3100
400
0
150
0
PR
OP
OS
ED
SH
ELT
ER
(FU
TU
RE
)
905
600
Min
ishe
lter
(Batter
y&
ID
U)
1085
905
For
Fut
ure
Exp
ansi
on For
Fut
ure
Exp
ansi
onT
P48
200A
X3H
O
DG
150
0
2500150
0
350
0
1500
150
0
Septic Tank (Option)
GUARD ROOM (optional)
NGL
100mm gravellayer
EP
-2
900
900
EP
-3
900
900
EP
-1
900
300
0
900
300
0
LT Panel
E.pole
600
1300 1300
750
1300
1050
100
0
1300
1300
7000
145
00
280
00
CW (Top)
DE
TA
ILS
TO
WE
R H
T
FO
UN
DA
TIO
N S
IZE
TO
WE
R C
/C
DG
SIZ
E
OD
BT
S S
IZE
24M
(T
RI. A
NG
UL
AR
)
(44
00
X4400
)MM
(28
59
X2859
)MM
(15
00
X2500
)MM
(15
00
X3100
)MM
TO
TA
L A
RE
AR
EQ
UIR
ED
(7.0
X14.5
)M
FE
NC
E L
EN
GT
H41.8
M (
with
out
Gua
rd R
oom
)
37.3
M (
with
Gu
ard
Ro
om
)
EP
-2
EP
-3
EP
-1E
QU
IPM
EN
T E
AR
TH
ING
LIG
HT
ING
PR
OT
EC
TIO
N E
AR
TH
ING
NE
UT
RA
L P
RO
TE
CT
ION
EA
RT
HIN
G
**
**
**
**
*
****
**
**
**
**
*
2
4M
-GB
T T
RIA
NG
ULA
R T
OW
ER
440
0
2859
4400
3100
400
0
150
0
PR
OP
OS
ED
SH
ELT
ER
(FU
TU
RE
)
905
600
Min
ishe
lter
(Batter
y&
ID
U)
1085
905
For
Fut
ure
Exp
ansi
on For
Fut
ure
Exp
ansi
onT
P48
200A
X3H
O
DG
150
0
2500150
0
350
0
1500
150
0
Septic Tank (Option)
GUARD ROOM (optional)
NGL
100mm gravellayer
EP
-2
900
900
EP
-3900
900
EP
-1
900
300
0
900
300
0
LT Panel
E.pole
600
1300 1300
750
1300
1050
100
0
1300
1300
7000
145
00
280
00
TSSR TSSR
TECHNICAL SITE SURVEY REPORT BHE-123 A
Autocad Drawings
Drawings Of: Side View
1 Square Correspond to: _0,5__m Scale: ______
CW (Side)
TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A
Hand sketch Drawings
Drawings Of: CW Layout & comments
1 Square Correspond to: ___m Scale: ______
CW (Signed sketch)
Note: Here scanned handwritten sketch should be placed, signed by all
representatives including owner. This is to acknowlige all parties on how the site will look like. Please, follow this
strictly!
TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A
Drawings
Drawings Of: TI Layout & comments
1 Square Correspond to: 0.1 m Scale: ______
TI or/and CW(indoor)
10 20 30 400
5 15 25 350
10
20
5
15
30
40
25
35
50
45
55
45
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
Addidional information
Photos of Candidate:
Photos
Place of outdoor
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
Addidional information
Temporary power source
3 phase supply power source
1 phase supply power source
HT line (Mention 11KV or 33KV)
Existing transformer location
Sector Photos
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
Addidional information
View of Sector 1
View of Sector 2
View of Sector 3
Sector Photos
30°
120°
240°
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
Addidional information
PANORAMIC PHOTO
0 30 60
90 120150
TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A
ANTENNAAntenna locationAntenna typeSPACE Requirement for Antenna installationConcrete Foundation for VSAT antennaDistance from VSAT antenna to any obstacle(fence,barbed wire) on satellite look angle(minimum 6m)
Type of power Source Output power supply available
IF Indoor room/Shelter Space available for installation of modem with 19"rackUPS/inverter with battery for VSAT equipment (supplied by) If NCELLFor no Head load sites
For long distance head load sites Space available for 1KVA UPS with 12V 2*100AH batteries(1m*1m) IF VENDORAC voltage source with battery backupDC/AC converter with battery available, if DC source
IF Outdoor cabinet/OthersSpace available for installation of modem inside cabinet 2U (19")UPS/inverter with battery for VSAT equipment (supplied by) If NCELL
IF VENDORAC voltage source with battery backupDC/AC converter with battery available, if DC source
Specification for Electrical Power RequirementsModemModem TypeElectric Power Consumption 200W 300W 200WCurrent 5A/2.5A 3A 1.0-0.4AVoltage 110-240VAC/+24or+48DC 110-240VAC 110-240VACBUCBUC typeBUC electrical power consumption 140W 850W 500WVoltage 220VAC/-48VDC 220VAC 220VAC
Fig1. Reference for Antenna look angle(elevation angle of antenna) Fig2. Reference for checking any obstable with in elevation of antenna
Location of indoor VSAT equipments (modems/ups/inverter/charger/battery)
Distance between VSAT antenna and Modem location(should be less than 22m)
Feeder holes for 2 IF cables,1 power supply cable and 1 grounding cable from VSAT antenna to modem location
Space available for 7KVA UPS with charger 12V 20*100AH batteries(minimum 3m*2m)
Space available for 1KVA UPS with 12V 2*100 AH batteries batteries(minimum 3m*2m)
Greenfield
Rooftop Other1.8m ANDREW
2.4m ANDREW
2.4m PRODLINE2m*2m 3m*3m 4m*4mRequired (if
Greenfield)
Not RequiredYes
No
32°-40°230°-240° N
Yes
No Yes
No Yes
No Yes
No
INDOOR ROOM
Shelter Outdoor cabinet
Other
Yes
No
Yes
No
NEASolar
DG
Others AC DC
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No Yes
No
Vendor
NCELL
Vendor
NCELL
IDIRECT
RADYNE
PARADISE
AMPLUS 10W
AGILIS 80W
AMPLUS 80W
TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A
Notes List
Item Notes1 Plot size is 28mx7.2 Required area is 7mx14.5m3 Fence lengtth is 41.8m.5 Guard room is optional.
Explanation: put comments if site requires non-standard solutions or in case if additional materials will be needed