Document Version 2.0 BHE-123 A TSSR Revision Track Revision Date Name Revision description 1 2 SITE SURVEY PARTICIPANTS: SA (Subco) - Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) RF Planner (Subco) - Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) TRS Planner (Subco)- Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) CW Surveyor (Subco)- Mast/Saroj Yadav/9801122332 (Company, Name & Phone #, Signature) HUAWEI Supervisor - Daud (Company, Name & Phone #, Signature) Owner - (it is enough if signature is on the sketch) Man Kumari Gurung (Company, Name & Phone #, Signature) Checked by HUAWEI Name&Position&Signature: Received by NCELL: (Name & Signature & Date) NOTE: NCELL should convey any objections in 48 hours otherwise the document is deemed as excepted. Checked by NCELL Name&Position&Signature: Comments: Version: 2.0 Date: __________ TSSR TECHNICAL SITE SURVEY REPORT NCELL GSM Project ITE ID (with candidate letter): Approved date Rejected date Approved date Rejected date
28
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TSSR-BHE123-A (V.3)

Document Version 2.0

BHE-123 A

TSSR Revision Track

Revision Date Name Revision description

12

SITE SURVEY PARTICIPANTS:

SA (Subco) - Mast/Saroj Yadav/9801122332(Company, Name & Phone #, Signature)

RF Planner (Subco) - Mast/Saroj Yadav/9801122332(Company, Name & Phone #, Signature)

TRS Planner (Subco)- Mast/Saroj Yadav/9801122332(Company, Name & Phone #, Signature)

CW Surveyor (Subco)- Mast/Saroj Yadav/9801122332(Company, Name & Phone #, Signature)

HUAWEI Supervisor - Daud(Company, Name & Phone #, Signature)

Owner - (it is enough if signature is on the sketch) Man Kumari Gurung(Company, Name & Phone #, Signature)

Checked by HUAWEI

Name&Position&Signature:

Received by NCELL:

(Name & Signature & Date)

NOTE: NCELL should convey any objections in 48 hours otherwise the document is deemed as excepted.Checked by NCELL

Name&Position&Signature:

Comments:

Version: 2.0

Date: __________

TSSR TECHNICAL SITE SURVEY REPORT

NCELL GSM Project

SITE ID (with candidate letter):

Approveddate

Rejecteddate

Approveddate

Rejecteddate

Page 2: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Site ID: BHE-123 A Site Name: Saraswati Gaun Date: 30.01.2012

Region: FWDR City: DAILEKH Phase: Phase 3

Municipality/VDC: Name: Narayan Nagarpalika

Site Address: NARAYAN NAGARPALIKA -8, DAILEKH

Coordinates: Latitude: 28.83003 Longitude: 81.70997Altitude: 1379 m

Site Type:

Equipment room type:

Ownership Type:

Site Contact Person Details: Site Owner Contact Details:

Name Man Kumari Gurung Name Man Kumari Gurung

Position Position

Mobile Phone 9841628153 Mobile Phone 9841628153

Phone/Fax 9841628153 Phone/Fax 9841628153

Legal address

Permission from civil avaition

Additional permits required

Permit to be received from:

Access to site Available _______

Restriction of time or any other details:NO

Location of Key:

Directions to get to Site:

Special access details:

SA

NARAYAN NAGARPALIKA -8, DAILEKH

60 KM NORTH FROM SUKHET,NEAR PASHU PARIKSHAN KENDRA,NARAYAN NAGARPALIKA

YES NO

Rooftop Greenfield

Week days

Saturday

Sunday

Appointment needed

Other:

On Site Off-Site

new shelter GF

indoor room Outdoor BTS

Othermodified room

existing shelter

Existing site

Existing tower / Chimney

State / Governmental

Communal

Private

YES NO

Municipality VDC

Page 3: TSSR-BHE123-A (V.3)

TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A

Site ID: BHE-123 A Site Adress: NARAYAN NAGARPALIKA -8, DAILEKH

Coordinates: North: 28.83003 East: 81.70997

RF- Data Equipment type:

GSM Network:

Sector1 Sector2 Sector3 Remarks

Band (900 / 1800) 900 900 900Cell ID BHE-123A BHE-123B BHE-123CStructure / Pole allocation LATTICE LATTICE LATTICE

Length of pole 24M 24M 24MNo of TRX 3 3 3Antenna Type DBXLH6565CVTM DBXLH6565CVTM DBXLH6565CVTMAzimuth (Degree) 40 110 230

Centre height of antenna - AGL (m) 21M 21M 21M

Height Rooftop (m) N/A N/A N/A

Tilt (Electr) 4 2 2

Tilt (Mech.) 2 0 0

Feeder Length (m) 34M 34M 34MFeeder type OPTICAL OPTICAL OPTICALNo. of feeder 1 1 1

Comments and coverage targets

TRS- Data

Transmission:

MW Pole Capacity

AGL (m)

MW1 24 0.6 184 23M RTN605,1+0 BHE414 5.6km 16 E1 18G

MW2

MW3

MW4

MW5

Can you see BSC or HUB Site: Any other sites:

Transmission equipments Other site to be marked in panoramic photos!

Azimuth 4 Height 25 Antenna Size 0.6

Farend Type

IDU space Now Connected MaxPhoto

Lease Line TR Comments:Backbone Site

Repeater

NWP

No. of E1 (Single Band-1E1, Dual Band-2E1)

Antenna Size / Polarization

Azimuth (deg)

Height of Antenna

MW Configuration

Far End (Site 'B'

ID)

Hop Distance

(km)

frequency (GHz)

Feeder Length (m)

Feeder Type

Far End Feasibility Information:

Yes No Yes No

Stack Wall PoleOutdoor Indoor

1 E1 2 E1

Indoor

Outdoor

OKNOT OKAvailabl

eUnavailable

Page 4: TSSR-BHE123-A (V.3)

BHE123-A(ITS FAR END BHE414)

Farend Tower height30M

Layout diagram of the equipment placement at farend

FAREND IS PHASE-1 SITE /SPACE IS AVAILABLE FOR MW SPACE AVAILABILITY

PHOTOS FROM FAREND towards the surveyd Location Link direction site with Azimuth

provide clear photos ,should include the obstacles information ( trees , hills ) if any

If possible photo should shows the farend locatioin or its nearby other's Tower photo to certainfy link will happen But for longer hop link at least capture the photo in link direction

PHOTO OF THE BTS ROOM OF FAREND SITE SHOWING THE PLACE WHERE NEW EQUIPMENT AND DDF IS TO BE KEPT

Photo depicted the space of Installation of DDF either in the RACK or mounted on Wall. Need to see any space available for Wall Mount DDF

provide clear photos ,should include the overall equipments installed on Tower, can have many pics

NEW IDU place

Page 5: TSSR-BHE123-A (V.3)

Photo depicted the persent condition of Tower provide clear photos for avialablity of MCB in farend sites.

Page 6: TSSR-BHE123-A (V.3)

BHE123-A(ITS FAR END BHE414)

Space Availibilty Height at which MW antenna mountsyes 25m

Layout diagram of the equipment placement at farend

FAREND IS PHASE-1 SITE /SPACE IS AVAILABLE FOR MW SPACE AVAILABILITY

PHOTOS FROM FAREND towards the surveyd Location Link direction site with AzimuthAzimuth

provide clear photos ,should include the obstacles information ( trees , hills ) if any

If possible photo should shows the farend locatioin or its nearby other's Tower photo to certainfy link will happen But for longer hop link at least capture the photo in link direction

PHOTO OF THE BTS ROOM OF FAREND SITE SHOWING THE PLACE WHERE NEW EQUIPMENT AND DDF IS TO BE KEPT

Photo depicted the space of Installation of DDF either in the RACK or mounted on Wall. Need to see any space available for Wall Mount DDF

provide clear photos ,should include the overall equipments installed on Tower, can have many pics

Page 7: TSSR-BHE123-A (V.3)

Photo depicted the persent condition of Tower provide clear photos for avialablity of MCB in farend sites.

Page 8: TSSR-BHE123-A (V.3)
Page 9: TSSR-BHE123-A (V.3)
Page 10: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Model Site Type:MS1 MS7

ROOFTOP + Wall Mount GF 12M Monopole + Steel

ROOFTOP + 3M pole GF 18M Monopole + Steel

ROOFTOP + 4.5M pole

ROOFTOP + 6M pole

ROOFTOP + 9M pole on I Beam

ROOFTOP + Ballast Mast 4.5m

MS2 MS824M Greenfield Lattice Flexible Solution +9m GF

MS3 MS930M Greenfield Lattice Existing greenfield Tower + Lease

30M Greenfield Lattice

MS440M Greenfield Lattice

MS550M Greenfield Lattice

MS660M Greenfield Lattice

Electricity info:

Distance of single phase line from site:… 40 ..… m

Capacity/type/ distance of corresponding transformer from the site 50KV

Distance of three phase line from site:… 40m

Capacity/type/ distance of corresponding transformer from the site ............. KVA…………... Phase…………. mDistance of 11 KV line from the site 350M

Distance of 33 KV line from the si N/A

Pole needed: No. of poles needed:1

Crossing needed: If yes:

Are there any Disturbances/ Obstactles during Line Extension/ Crossing:

Power Cable routу starts at … ELECTRIC POLE

by pass .. LT PANNEL

till … ACDB BOX.

CW

MS1A

Standard Application

Non-Standars Application, Site Design Drawings needed before CW start

MS3B

MS1A

Standard Application

Non-Standars Application, Site Design Drawings needed before CW start

MS1CMS1D

MS2MS3A

MS4MS5

MS7AMS7B

MS9

MS6

MS1EMS1F

MS1B

MS8

Yes

No

Yes

NoRoad

Private land

Building

River

Page 11: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

AC power needed (KW): 12 Distance from the nearest point of tapping to the site 40 m

Generator needed: Generator space available: Transformer Needed:

Final AC power supply: Main AC Current Fuses (A):

Any other comment regarding AC power supply: THE SAME POLE CONTAINING 11KV & THREE PHASE.

Power Source coodniate 3 Phase: Latitude:28.83016 Longitude:81.70957

1 Phase: Latitude:28.83016 Longitude:81.70957

11KV: Latitude:28.82834 Longitude:81.70941

Temporary power available: If yes, available AC power:

Distance to temporary power source: m Owner willingness to provide temporary power

Contact person details for temporary power connection:

Tree cutting required: If yes, No. of trees to be cut for power line extension ______

No. of trees to be cut within plot area _______

Rooftop Site Electricity Info: New AC Power cable:

Space for transformer available: Space for Grounding available:

Grounding solution: Grounding cable size(mm2):If Generator needed is yes then it is confirmed with owner that there will be no problem in future to run DG

Greenfield Site electricity info: New AC Power cable:

Existing AC power supply: ----------------> If Yes:

Solar Site Info:

Clearance towards south east direction for Sunlight:

Enough space for solar Panels installation as per design in south east direction of plot:

If there is any shadow of Tree/Mountain/Building/Tower/Shelter on solar Panels in whole sunlight available time:

Any other comment regarding Solar:

If Greenfield Site:

Tower type:

Height of tower (m): 24M Other:

Characteristics of site area:

Other:

Soil investigation according to local requirements:

Comments:

Fence type needed for site: Chainlink Fence Length (m): 41.8m

How far is site from the nearest motorable road(m):

Backfilling is needed Heigth (m):

Permanent Road needed for access to site: Length (m):

Crane access possible: Lorry access possible:NO HEAD LOAD

Any weight restriction to the site: Head load needed: If yes: mHL start: Latitude: Longitude:HL finish Latitude: Longitude:NO TRACTORABLE ROADTractor load needed: If yes: mTL start: Latitude: Longitude:TL finish: Latitude: Longitude:

Any height/width restriction to the site:

Any parking restriction to the site:

Any over head power cables or other obstacles at the site:

Any undeground installation at the site:

Yes

No

Yes No

Existing

New

Shown in Sketch

YesYesY

es o

YesY

es

Yes

s

New lattice tower

New monopole

New guyed mast

Existing structure

Other

Yes

Above Ground

Below Ground

no

Yes

Overheaded

Undegrounded

Overheaded

Undergrounded

To be investigated

Yes

To be investigated

Clay, Mud or similar

Sand/Gravel

Tarmac

Concrete

Other

Yes No

230V Single Phase

380V Three Phase

Yes

No

Yes

No

Yes No

Yes

o

Yes

Yes

No

230V Single Phase

11kV380V Three Phase

s

No

Yes

No

Yes

No

Yes

No

Yes

No

Page 12: TSSR-BHE123-A (V.3)

CW

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

IF Rooftop Site:

Building Structure type:

Height of tower (m):

Height of rooftop above ground level (m): How many floors in the build?:

Is there elevator room on rooftop?: Weight limit of elevator (kg):

Elevator type: Size of elevator (m) H W D

Building condition: Сrane access possible

Head load needed: If yes: mHL start: Latitude: Longitude:HL finish: Latitude: Longitude:

Tractor load needed: If yes: mTL start: Latitude: Longitude:TL finish: Latitude: Longitude:

Antenna support type:

If other:

Height of antenna support (m):

Describe wall and roof condition:

Comments about roof construction:

Rooftop penetrations needed:

Floor penetrations needed:

Wall penetrations needed:

If Existing Structure Site:

Antenna support type:

Other:

Height of existing tower (m):

Cable tray routes:

Length of cable tray needed (m): 6m Length of ducting needed (m):

Comments about cable tray or ducting:

Equipment room Details:

Shelter location:

Shelter ice-protection needed

Equipment type:

Equipment shelter camouflage needed:

Details:

CW

Good

Public

Service

None

Average

Bad

YesYesYes

Yes

Roof

Ground

Technical floor

Elevator room

Other

Yes

Yes

Yes

Lattice tower

Pylon

Water tower

Chimney

Other

Stack indoor

Wall indoor

Wall outdoor

Other

Stack outdoor

___ Pole

____m Guyed mast

Existing Structure

TV tower

Other

Masonry

Reinforced Concrete

Steel

Other

RT existing

Yes

Yes

Page 13: TSSR-BHE123-A (V.3)

TSSR TECHNICAL SITE SURVEY REPORT

Autocad Drawings

Drawings Of: Top View

1 Square Correspond to: _0,5__m Scale: ______

DE

TA

ILS

TO

WE

R H

T

FO

UN

DA

TIO

N S

IZE

TO

WE

R C

/C

DG

SIZ

E

OD

BT

S S

IZE

24M

(T

RI. A

NG

UL

AR

)

(44

00

X4400

)MM

(28

59

X2859

)MM

(15

00

X2500

)MM

(15

00

X3100

)MM

TO

TA

L A

RE

AR

EQ

UIR

ED

(7.0

X14.5

)M

FE

NC

E L

EN

GT

H41.8

M (

with

out

Gua

rd R

oom

)

37.3

M (

with

Gu

ard

Ro

om

)

EP

-2

EP

-3

EP

-1E

QU

IPM

EN

T E

AR

TH

ING

LIG

HT

ING

PR

OT

EC

TIO

N E

AR

TH

ING

NE

UT

RA

L P

RO

TE

CT

ION

EA

RT

HIN

G

**

**

**

**

*

*****

**

**

**

**

2

4M

-GB

T T

RIA

NG

ULA

R T

OW

ER

440

0

2859

4400

3100

400

0

150

0

PR

OP

OS

ED

SH

ELT

ER

(FU

TU

RE

)

905

600

Min

ishe

lter

(Batter

y&

ID

U)

1085

905

For

Fut

ure

Exp

ansi

on For

Fut

ure

Exp

ansi

onT

P48

200A

X3H

O

DG

150

0

2500150

0

350

0

1500

150

0

Septic Tank (Option)

GUARD ROOM (optional)

NGL

100mm gravellayer

EP

-2

900

900

EP

-3

900

900

EP

-1

900

300

0

900

300

0

LT Panel

E.pole

600

1300 1300

750

1300

1050

100

0

1300

1300

7000

145

00

280

00

Page 14: TSSR-BHE123-A (V.3)

CW (Top)

DE

TA

ILS

TO

WE

R H

T

FO

UN

DA

TIO

N S

IZE

TO

WE

R C

/C

DG

SIZ

E

OD

BT

S S

IZE

24M

(T

RI. A

NG

UL

AR

)

(44

00

X4400

)MM

(28

59

X2859

)MM

(15

00

X2500

)MM

(15

00

X3100

)MM

TO

TA

L A

RE

AR

EQ

UIR

ED

(7.0

X14.5

)M

FE

NC

E L

EN

GT

H41.8

M (

with

out

Gua

rd R

oom

)

37.3

M (

with

Gu

ard

Ro

om

)

EP

-2

EP

-3

EP

-1E

QU

IPM

EN

T E

AR

TH

ING

LIG

HT

ING

PR

OT

EC

TIO

N E

AR

TH

ING

NE

UT

RA

L P

RO

TE

CT

ION

EA

RT

HIN

G

**

**

**

**

*

****

**

**

**

**

*

2

4M

-GB

T T

RIA

NG

ULA

R T

OW

ER

440

0

2859

4400

3100

400

0

150

0

PR

OP

OS

ED

SH

ELT

ER

(FU

TU

RE

)

905

600

Min

ishe

lter

(Batter

y&

ID

U)

1085

905

For

Fut

ure

Exp

ansi

on For

Fut

ure

Exp

ansi

onT

P48

200A

X3H

O

DG

150

0

2500150

0

350

0

1500

150

0

Septic Tank (Option)

GUARD ROOM (optional)

NGL

100mm gravellayer

EP

-2

900

900

EP

-3

900

900

EP

-1

900

300

0

900

300

0

LT Panel

E.pole

600

1300 1300

750

1300

1050

100

0

1300

1300

7000

145

00

280

00

Page 15: TSSR-BHE123-A (V.3)

BHE-123 A

DE

TA

ILS

TO

WE

R H

T

FO

UN

DA

TIO

N S

IZE

TO

WE

R C

/C

DG

SIZ

E

OD

BT

S S

IZE

24M

(T

RI. A

NG

UL

AR

)

(44

00

X4400

)MM

(28

59

X2859

)MM

(15

00

X2500

)MM

(15

00

X3100

)MM

TO

TA

L A

RE

AR

EQ

UIR

ED

(7.0

X14.5

)M

FE

NC

E L

EN

GT

H41.8

M (

with

out

Gua

rd R

oom

)

37.3

M (

with

Gu

ard

Ro

om

)

EP

-2

EP

-3

EP

-1E

QU

IPM

EN

T E

AR

TH

ING

LIG

HT

ING

PR

OT

EC

TIO

N E

AR

TH

ING

NE

UT

RA

L P

RO

TE

CT

ION

EA

RT

HIN

G

**

**

**

**

*

****

**

**

**

**

*

2

4M

-GB

T T

RIA

NG

ULA

R T

OW

ER

440

0

2859

4400

3100

400

0

150

0

PR

OP

OS

ED

SH

ELT

ER

(FU

TU

RE

)

905

600

Min

ishe

lter

(Batter

y&

ID

U)

1085

905

For

Fut

ure

Exp

ansi

on For

Fut

ure

Exp

ansi

onT

P48

200A

X3H

O

DG

150

0

2500150

0

350

0

1500

150

0

Septic Tank (Option)

GUARD ROOM (optional)

NGL

100mm gravellayer

EP

-2

900

900

EP

-3

900

900

EP

-1

900

300

0

900

300

0

LT Panel

E.pole

600

1300 1300

750

1300

1050

100

0

1300

1300

7000

145

00

280

00

Page 16: TSSR-BHE123-A (V.3)

CW (Top)

DE

TA

ILS

TO

WE

R H

T

FO

UN

DA

TIO

N S

IZE

TO

WE

R C

/C

DG

SIZ

E

OD

BT

S S

IZE

24M

(T

RI. A

NG

UL

AR

)

(44

00

X4400

)MM

(28

59

X2859

)MM

(15

00

X2500

)MM

(15

00

X3100

)MM

TO

TA

L A

RE

AR

EQ

UIR

ED

(7.0

X14.5

)M

FE

NC

E L

EN

GT

H41.8

M (

with

out

Gua

rd R

oom

)

37.3

M (

with

Gu

ard

Ro

om

)

EP

-2

EP

-3

EP

-1E

QU

IPM

EN

T E

AR

TH

ING

LIG

HT

ING

PR

OT

EC

TIO

N E

AR

TH

ING

NE

UT

RA

L P

RO

TE

CT

ION

EA

RT

HIN

G

**

**

**

**

*

****

**

**

**

**

*

2

4M

-GB

T T

RIA

NG

ULA

R T

OW

ER

440

0

2859

4400

3100

400

0

150

0

PR

OP

OS

ED

SH

ELT

ER

(FU

TU

RE

)

905

600

Min

ishe

lter

(Batter

y&

ID

U)

1085

905

For

Fut

ure

Exp

ansi

on For

Fut

ure

Exp

ansi

onT

P48

200A

X3H

O

DG

150

0

2500150

0

350

0

1500

150

0

Septic Tank (Option)

GUARD ROOM (optional)

NGL

100mm gravellayer

EP

-2

900

900

EP

-3900

900

EP

-1

900

300

0

900

300

0

LT Panel

E.pole

600

1300 1300

750

1300

1050

100

0

1300

1300

7000

145

00

280

00

Page 17: TSSR-BHE123-A (V.3)

TSSR TSSR

TECHNICAL SITE SURVEY REPORT BHE-123 A

Autocad Drawings

Drawings Of: Side View

1 Square Correspond to: _0,5__m Scale: ______

CW (Side)

Page 18: TSSR-BHE123-A (V.3)

TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A

Hand sketch Drawings

Drawings Of: CW Layout & comments

1 Square Correspond to: ___m Scale: ______

CW (Signed sketch)

Note: Here scanned handwritten sketch should be placed, signed by all

representatives including owner. This is to acknowlige all parties on how the site will look like. Please, follow this

strictly!

Page 19: TSSR-BHE123-A (V.3)

TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A

Drawings

Drawings Of: TI Layout & comments

1 Square Correspond to: 0.1 m Scale: ______

TI or/and CW(indoor)

10 20 30 400

5 15 25 350

10

20

5

15

30

40

25

35

50

45

55

45

Page 20: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Addidional information

Photos of Candidate:

Photos

Place of outdoor

Page 21: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Addidional information

Temporary power source

3 phase supply power source

1 phase supply power source

HT line (Mention 11KV or 33KV)

Existing transformer location

Sector Photos

Page 22: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Addidional information

View of Sector 1

View of Sector 2

View of Sector 3

Sector Photos

30°

120°

240°

Page 23: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

Addidional information

PANORAMIC PHOTO

0 30 60

90 120150

Page 24: TSSR-BHE123-A (V.3)

TSSRTECHNICAL SITE SURVEY REPORT BHE-123 A

ANTENNAAntenna locationAntenna typeSPACE Requirement for Antenna installationConcrete Foundation for VSAT antennaDistance from VSAT antenna to any obstacle(fence,barbed wire) on satellite look angle(minimum 6m)

SATELLITE VISIBILITYAntenna Elevation angle clearance(see ref fig1&2 below)

Yamal202 49° EAntenna Azimuth clearancePanoramic photos availableAny rigid obstacle on the satellite look angle (solar panel, house,trees,hills,electrical poles,DG,shelter etc) Fig2. below

Type of power Source Output power supply available

IF Indoor room/Shelter Space available for installation of modem with 19"rackUPS/inverter with battery for VSAT equipment (supplied by) If NCELLFor no Head load sites

For long distance head load sites Space available for 1KVA UPS with 12V 2*100AH batteries(1m*1m) IF VENDORAC voltage source with battery backupDC/AC converter with battery available, if DC source

IF Outdoor cabinet/OthersSpace available for installation of modem inside cabinet 2U (19")UPS/inverter with battery for VSAT equipment (supplied by) If NCELL

IF VENDORAC voltage source with battery backupDC/AC converter with battery available, if DC source

Specification for Electrical Power RequirementsModemModem TypeElectric Power Consumption 200W 300W 200WCurrent 5A/2.5A 3A 1.0-0.4AVoltage 110-240VAC/+24or+48DC 110-240VAC 110-240VACBUCBUC typeBUC electrical power consumption 140W 850W 500WVoltage 220VAC/-48VDC 220VAC 220VAC

Fig1. Reference for Antenna look angle(elevation angle of antenna) Fig2. Reference for checking any obstable with in elevation of antenna

Location of indoor VSAT equipments (modems/ups/inverter/charger/battery)

Distance between VSAT antenna and Modem location(should be less than 22m)

Feeder holes for 2 IF cables,1 power supply cable and 1 grounding cable from VSAT antenna to modem location

Space available for 7KVA UPS with charger 12V 20*100AH batteries(minimum 3m*2m)

Space available for 1KVA UPS with 12V 2*100 AH batteries batteries(minimum 3m*2m)

Greenfield

Rooftop Other1.8m ANDREW

2.4m ANDREW

2.4m PRODLINE2m*2m 3m*3m 4m*4mRequired (if

Greenfield)

Not RequiredYes

No

32°-40°230°-240° N

Yes

No Yes

No Yes

No Yes

No

INDOOR ROOM

Shelter Outdoor cabinet

Other

Yes

No

Yes

No

NEASolar

DG

Others AC DC

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No

Yes

No Yes

No

Vendor

NCELL

Vendor

NCELL

IDIRECT

RADYNE

PARADISE

AMPLUS 10W

AGILIS 80W

AMPLUS 80W

Page 25: TSSR-BHE123-A (V.3)

TSSR TECHNICAL SITE SURVEY REPORT BHE-123 A

Notes List

Item Notes1 Plot size is 28mx7.2 Required area is 7mx14.5m3 Fence lengtth is 41.8m.5 Guard room is optional.

Explanation: put comments if site requires non-standard solutions or in case if additional materials will be needed