Mr. James Judkins Base Civil Engineer I n t e g r i t y - S e r v i c e - E x c e l l e n c e “Warriors Committed to Readiness and Quality Support” Edwards AFB Update 20 Mar 14
30

4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

May 19, 2017

Download

Documents

amyeunmikong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Mr. James JudkinsBase Civil Engineer

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

“Warriors Committed to Readiness and Quality Support”

Edwards AFB Update20 Mar 14

Page 2: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Lakebeds(68 Square Miles of Lakebeds)

Page 3: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Paved Roads(284 Miles of Paved Roads)

Page 4: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Unpaved Roads(289 Miles of Unpaved Roads)

Page 5: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Runways(7.8 Miles of Paved Runways)

Page 6: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Unpaved Runways(59 Miles of Lakebed Runways)

Page 7: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Ramp Space(1.3 Million Square Yards Ramp Space)

Page 8: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Buildings(9.5 Million Square Feet Building Space)

Page 9: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Electrical Lines(270 Miles of Electrical Lines)

Page 10: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Wastewater(194 Miles of Wastewater Lines)

Page 11: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Natural Gas(72 Miles of Gas Lines)

Page 12: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

POL Storage(3.6 Million Gallons POL Storage)

Page 13: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Deployments(EOD)

Page 14: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Deployments(Our Civilians)

Mr. Ken Harnos – EMCS/SCADA Ms. Becky Goodwin – Training Manager

Mr. Robin Hairston – PavementsMr. Christopher Holman – ElectricalMr. Hector Aquino-Machuca – ElectricalMr. Dave Harrell – Energy

Page 15: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Deployments(Family Members)

SrA Ashley Bernhardt

Sgt David LaComb

SrA Steven Harrell

SSgt Michael Harrell

Maj’s Drew & Seher Judkins

Page 16: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB
Page 17: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB
Page 18: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB
Page 19: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Edwards AFB(Circa 1970)

Page 20: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Edwards AFB(Now)

Page 21: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Edwards AFB(Now)

Page 22: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

SunEdison’s Projects in the Region

•Oro Verde Solar – 450MW

•Antelope Solar – 20 MW

•Adobe Solar – 20 MW•Rigel Solar – 20 MW

•Orion Solar – 20 MW

•Regulus Solar – 60 MW

22

•Lancaster State Prison – 2.5 MW

•Bolthouse Farms – 1.9 MW

•CSU Bakersfield – 1.2 MW

Page 23: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

PhotovoltaicStirling Engine

Parabolic Trough (CSP) Solar Power Tower (CSP)

Solar Technologies

Page 24: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Edwards AFB

TehachapiMojave

Lancaster

Palmdale

Blueprint for a Secure Energy Future(Private Financing Initiative)

Page 25: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

ProposedEUL Location

AFRLDeliveryPoint

South BaseDeliveryPoint

North BaseDeliveryPoint

•12.5 miles

Energy Initiatives(Delivery Point Distances)

Page 26: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Sustainment/MFH Funding FY13(dollars in millions)

Annual Average Sustainment Requirements for EAFB = $76.2M (per UFC 3-701-07)

Total Funding Received = $72.3M

Page 27: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

SRM/DEMO/MFH/ARRA/USER FUNDEDFY08-FY14 PROJECTS AWARDED

FY08 FY09 FY10 FY11 FY12 FY13 FY14UNAWARDED FUNDED $15,363,670AWARDED $66,394,225 $81,860,480 $34,814,960 $34,566,157 $71,408,654 $66,578,800 $3,055,864

$0

$10,000,000

$20,000,000

$30,000,000

$40,000,000

$50,000,000

$60,000,000

$70,000,000

$80,000,000

$90,000,000

Page 28: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Exciting Times

• Oro Verde Solar Project

• Utility Conservation Program

• Space Consolidation Program

• Encroachment Management

• Civil Engineering Transformation

• Water Litigation

• Housing Privatization

• MILCON

Page 29: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Sustainment/MFH Funding FY13(dollars in millions)

Annual Average Sustainment Requirements for EAFB = $76.2M (per UFC 3-701-07)

Total Funding Received = $72.3M

Page 30: 4- Judkins SAME Presentation 20 Mar 14 Edwards AFB

Questions/CommentsTHE END