Top Banner

of 13

4 ENRA - EARD by Y. Jiang

Apr 03, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    1/13

    Environment,Natural Resources, and

    Agriculture Division,

    East Asia Department(EAER/EARD)

    Asian Development Bank

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    2/13

    Sector

    Environment, Natural Resources, andAgriculture Sector

    Countries

    Peoples Republic of China (PRC)Mongolia

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    3/13

    Areas of Operation

    Integrated Water Resources Management, WaterResources Development, Flood Management,Drought Management, Groundwater Management,Irrigation Management, Safe Drinking Water

    Wetlands and Lakes Protection, Ecological andBiodiversity Management, Wastewater and SolidWaste Management, Rural and Agricultural PollutionControl and Regional Environment Protection

    High-Value Production and Market Supply-ChainManagement, Sustainable Rural Livelihoods, LandManagement (Dry Lands, Forests, Coastal Lands),Forestry Development, Biomass Clean Energy andLow Carbon Agriculture, Food Safety and GreenAgriculture

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    4/13

    EAER Portfolio

    Ongoing Loan, Co-financed, and Grant ProjectsPRC: 15, Mongolia: 3

    Ongoing Technical Assistances (TAs)

    PRC: 26, Mongolia: 1, Regional: 2

    Loan Projects being Formulated (for 2013-2015)PRC: 11, Mongolia: 1

    TAs being Formulated (for 2013-2014)PRC: 20

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    5/13

    Consulting Services (March 2013-)(Ongoing Loan Project) Loan2738-PRC: Qinghai Rural Water Resources

    Management Project (Total Loan Amount: $60Million)

    For irrigation management, farmingtechnologies, capacity development, safeguards,project management, etc.

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    6/13

    Consulting Services (March 2012-)(Ongoing Loan Project with Associated TA) Loan2829-PRC: Hai River Estuary Area Pollution

    Control and Ecosystem RehabilitationProject/TA7985-PRC Capacity Development forGreen Growth Demonstration (Ongoing, Total LoanAmount: $100 Million, Total TA Grant Amount: $1Million)

    For capacity development for applyinginternational best practices in environmental

    management and establishing ISO quality andenvironmental management systems

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    7/13

    Consulting Services (March 2013-)(New Loan and Grant Projects) PRC: Anhui Huainan Urban Water Systems

    Integrated Rehabilitation (2013 Firm, Total LoanAmount: $150 Million)

    PRC: Jiangxi Zhelin Lake Water ResourcesIntegrated Utilization (2014 Firm, Total LoanAmount: $100 Million)

    PRC: Guangdong Chaonan Water ResourcesProtection and Conservation (2014 Firm, Total LoanAmount: $100 Million)

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    8/13

    Consulting Services (March 2013-)(New Loan Projects) PRC: Henan Value Chain and Products Safety

    Demonstration (2014 Standby, 2015 Firm, TotalLoan Amount: $80 Million)

    PRC: Gansu Featured Agriculture and FinancialServices System Development (2015 Firm, TotalLoan Amount: $100 Million)

    PRC: Hubei Enshi Qingjiang River UpstreamEnvironment Rehabilitation & EcologicalConservation (2015 Firm, Total Loan Amount: $100Million)

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    9/13

    Consulting Services (March 2013-)(New Project Preparatory TAs) PRC: Henan Value Chain and Products Safety

    Demonstration (2013 Firm, Total TA Grant Amount:$0.60 Million)

    PRC: Gansu Featured Agriculture and FinancialServices System Development (2013 Firm, Total TAGrant Amount: $0.55 million)

    PRC: Hubei Enshi Qingjiang River UpstreamEnvironment Rehabilitation & EcologicalConservation (2013 Firm, Total TA Grant Amount:$0.60 million)

    PRC: Shandong Groundwater Allocation & Protection(2013 Firm, Total TA Grant Amount: $0.60 million)

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    10/13

    Consulting Services (March 2013-)(New Policy and Advisory TAs/Capacity Development

    TAs) PRC: Policy and Management System Development

    for Rural Environment Protection (2013 Firm, TotalTA Grant Amount: $0.45 Million)

    PRC: Market-based Eco-compensation Mechanism inBeijing (2013 Firm, Total TA Amount: $0.40 Million)

    PRC: Hunan Chang-Zhu-Tan Cluster City SustainableLow Carbon Development (2013 Firm, Total TAAmount: $0.40 Million)

    PRC: Weihe River Watershed Management inShaanxi (2013 Firm, Total TA Amount: $0.35 Million)

    PRC: Daguhe Underground Rehabilitation &Protection (2013 Firm, Total TA Grant Amount:

    $0.30 Million)

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    11/13

    Consulting Services (March 2013-)(New Policy and Advisory TAs/Capacity DevelopmentTAs) PRC: Sustainable & Climate Resilient Land

    Management in Western PRC (2013 Firm,Cofinancing with GEF: $3.636 Million)

    PRC: Modern Agriculture Development & AgricultureSupport (2013 Standby/2014 Firm, Total TA GrantAmount: $0.40 Million)

    PRC: Natural Disaster Risk Management in the

    Southern Mountain Area in Jiangxi (2013 Standby/2014 Firm, Total TA Grant Amount: $0.50 Million)

    PRC: Establish a New Knowledge Hub on GreenDevelopment and Eco-Compensation (2013 Standby

    /2014 Firm, Total TA Grant Amount: $0.30 Million)

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    12/13

    Consulting Services (March 2012-)(New Policy and Advisory TAs/Capacity DevelopmentTAs) PRC: Strengthening Capacity for Wetland Protection

    for Sanjiang Plain (2013 Standby/2014 Firm, TotalTA Grant Amount: $0.30 Million)

    PRC: Agricultural Non-point Source Pollution TotalAmount Control in Taihu Basin (2014 Firm, Total TAGrant Amount: $0.40 Million)

    PRC: Optimization of Crop Structure in Sounthern

    Mountain Area in Gansu (2014 Firm, Total TA GrantAmount: $0.50 Million)

    Strategy for Resource-saving and Environment-Friendly Development in Xilinggol League (2014Firm, Total TA Grant Amount: $0.50 Million).

  • 7/29/2019 4 ENRA - EARD by Y. Jiang

    13/13

    For More InformationYi JiangEnvironmental Economist, [email protected]

    Consultant Services Recruitment Noticeshttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F3

    49B4DE0A42F84BD3D82A8DC039?page=mainPage

    mailto:[email protected]://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagemailto:[email protected]