Top Banner

of 18

5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

Apr 06, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    1/18

    Business Opportunities

    2122 March 2012

    Transport and Communications

    Division (EATC)East Asia Department (EARD)

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    2/18

    EARD Countries

    The Peoples Republic of

    China (PRC)

    Mongolia

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    3/18

    ADB Assistance to PRC and MongoliasTransport and Communication Sectors

    (as of 31 December 2011)

    Country Start Year

    Loan Amount

    ($ million) % of Total Lending TA Amount

    % of Total TA

    ($ million)

    PRC 1986 13,363.0 54 68.5 18

    Mongolia 1991 264.6 32 14.7 16

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    4/18

    Business Opportunities

    TypeNo. of TAProjects

    No. of LoanProjects

    Total Value(S million) Timeline

    1. Consulting Services 20 4 19.75 201220142. Equipment 0 8 727.67 201220203. Civil Works 0 3 462.40 20122020

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    5/18

    Consulting Services(Under Firm TAs)

    TA No. Project Name ApprovalDateTAAmount($ ) TAType Required Expertise LikelyTiming

    7449-MON Regional Transport

    Development -Regional Logistics II

    15-Dec-09 350,000 PPTA PPP specialist with

    logistics experience,material handling, andeconomic and financial

    2012

    7692-PRC CapacityDevelopment forRailway TrackMaintenance

    10-Dec-10 400,000 CDTA Track maintenance,human resourcemanagement, and largetrack maintenancemachine technicaltraining

    2012

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    6/18

    Consulting Services(Under Firm TAs)

    TA No. Project NameApproval

    Date

    TAAmount

    ($)TA

    Type Required ExpertiseLikelyTiming

    7916-PRC Improving EnergyEfficiency andReducing Emissionsthrough IntelligentRailway StationBuildings

    17-Nov-11 400.000 PATA Intelligent building andenergy efficiency, andbuilding automaticcontrol and data network

    2012

    7965-PRC Jiangxi Ji'an

    Sustainable UrbanTransport

    09-Dec-11 700,000 PPTA Urban transport, road

    safety, hub design,economic, financial,travel forecast,environment, and social

    2012

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    7/18

    Consulting Services(Under Firm TAs)

    TA No. Project NameApproval

    Date

    TAAmount

    ($)TA

    Type Required ExpertiseLikelyTiming

    7988-PRC Anhui IntermodalSustainableTransport

    12-Dec-11 1,000,000 PPTA Inland waterway, port,road design and safety,logistics, economic,financial, environment,social, and capacitybuilding

    2012

    7962-PRC Yunnan SustainableMaintenance

    12-Dec-11 800,000 PPTA Road maintenanceplanning; managementand engineering;transport informationsystem; road safety;

    highway procurement;environment; socialsafeguards; pavementmanagement; GIS; androad material engineer

    2012

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    8/18

    Consulting Services(Under Firm TAs)

    TA No. Project Name ApprovalDateTAAmount($) TAType Required Expertise LikelyTiming

    7975-PRC YuxiMohanSubregional RailwayLink

    13-Dec-11 800,000 PPTA Railway engineering;operation andinstitutional; economicand financial;environment and social;

    logistics and regionalcooperation; transportenergy; and multimodalhub design

    2013

    7976-PRC Beijing SustainableUrban Transport

    13-Dec-11 450,000 PATA Urban transport andtravel demandmanagement, transportfiscal and pricing

    strategy, vehicleemission, transportplanning and networkmodeling, trafficmanagement and trafficmodeling

    2012

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    9/18

    Consulting Services(Under Firm TAs)

    TA No. Project Name ApprovalDateTAAmount($) TAType Required Expertise LikelyTiming

    8002-PRC HubeiYichangSustainable Urban

    Transport

    15-Dec-11 900,000 PPTA BRT and publictransport, travel forecast

    road engineering,economic and financial,environment and social

    2012

    7925-PRC DevelopingMultimodalPassenger

    Transport Hubs

    24-Dec-11 500,000 PATA Integrated urbantransport planning,multimodal passenger

    hub architect, financial,design and costing civilengineer, andinstitutional coordination

    2012

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    10/18

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    11/18

    Consulting Services(Under Potential TAs)

    Country Indicative Project Name TA TypeIndicativeYear forADBApproval

    IndicativeTA Amount($)PRC Yunnan Puer Regional

    Roads Network IntegratedDevelopment

    PPTA 2012 750,000

    PRC Fujian Road NetworkRehabilitation and

    Integrated Development

    PPTA 2012 750,000

    PRC Strategy for Rural LogisticsDevelopment

    PATA 2013 700,000

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    12/18

    Consulting Services(Under Potential TAs)

    Country Indicative Project Name TA TypeIndicativeYear forADBApproval

    IndicativeTA Amount($)

    PRC Capacity Building for HighSpeed Train Drivers andManagement Personnel

    CDTA 2013 400,000

    PRC Automobile's EnvironmentalPerformance Conformity inFuel Consumption and

    Pollutant Emission

    PATA 2013 500,000

    PRC Shaanxi Trunk RoadsImprovement

    PPTA 2013 750,000

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    13/18

    Consulting Services(under Loans)

    Loan No. Project Name ApprovalDate Required ExpertiseCostEstimates($ million)

    2600-PRC Anhui Integrated Transport

    Sector Improvement

    10-Dec-09 Highway financing study, and

    overseas training

    1.5

    2802-PRC Xi'an Urban Road Network

    Improvement

    08-Nov-11 Project management and

    training

    1.5

    2847-MON MFF Western Regional Road

    Corridor - Tranche 1

    22-Dec-11 Project management,

    construction supervision, and

    road maintenance

    2.0

    PRC 43031 Hunan Xiangjiang Inland

    Waterway Transport

    Institutional strengthening,

    capacity building, and port

    development study

    1.0

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    14/18

    Equipment

    Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)2345-PRC Westen Guangxi Roads

    Development

    14-Aug-07 (1) Tolling, monitoring and

    communications

    6.5

    (2) Maintenance and safety

    (3) Pavement testing

    (4) Storage and container(5) Highway transport

    information system

    2605-PRC MFF Railway Energy

    Efficiency and Safety

    Enhancement

    Tranche 1

    15-Dec-09 Telecommunication systems;

    signaling; overhead catenary;

    traction substation system;

    electric power cable andequipment; noise barriers;

    operation, maintenance, and

    safety; and fasteners

    260.0

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    15/18

    Equipment

    Loan No. Project NameApproval

    Date Type of EquipmentCost Estimates

    ($ million)2709-PRC Yunnan Integrated

    Road NetworkDevelopment

    02-Dec-10 Road maintenanceequipment

    3.0

    2724-PRC MFF Railway EnergyEfficiency and Safety

    Enhancement

    Tranche 2

    14-Dec-10 Bridge bearings, heavy dutyswitches and fasteners

    98.4

    2765-PRC MFF Railway EnergyEfficiency and SafetyEnhancementTranche 3

    20-Jul-11 Railway electrification,electric power supplysystem, noise barriers,fasteners and switches,railway telecommunication

    system, railway signalingsystem, advanced railwayinspection equipment, andemergency rescueequipment

    250.0

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    16/18

    Equipment

    Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)2802-PRC Xi'an Urban Road

    Network Improvement

    08-Nov-11 Light signaling systems, road

    lighting, traffic signal control

    system, IT enforcement

    system, intelligent transport

    system (traffic information

    collection and release, traffic

    video monitoring, and camera

    enforcement)

    25.5

    2847-MON MFF Western Regional

    Road Corridor

    22-Dec-11 Maintenance equipment 0.27

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    17/18

    Equipment

    Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)PRC 43031 Hunan Xiangjiang

    Inland WaterwayTransport

    Turbine generator andauxiliary equipment, metalstructure of power plant andsluice structure, metalstructure of shiplock, hydraulichoist of dial gates andshiplock, dam crest cranegantry crane, tailwater gantrycrane, overhead crane,sewage crane, power supplyand distribution system andauxiliary equipment for

    shiplock, power supply anddistribution system andauxiliary equipment for sluicestructure

    84.0

  • 8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li

    18/18

    Civil Works

    Loan No. Project NameApproval

    Date Type of WorksCost Estimates

    ($ million)

    2802-PRC Xi'an Urban RoadNetwork Improvement

    08-Nov-11 Road subgrade, bridges,pavement, road furniture,transport hubs, CNG stations

    works, and greening works

    282.0

    2847-MON Western Regional RoadCorridorTranche 1

    22-Dec-11 103 km road works and 20 kmcommunity access roads

    50.4

    PRC 43031 Hunan Xiangjiang InlandWaterway Transport

    Shiplock, barrage andpowerhouse road, cofferdam,

    administrative buildings,shiplock control center, Yunjiport berth, Songbai port