Case Copenhagen Cycle Track Workshop, CIP

Conference 2013

Andreas Røhl, Head of Bicycle Programme,

City of Copenhagen (10 months with Urban

Systems in 2012)

Page 2: 4 cip infuse-copenhagen-rohl
Page 3: 4 cip infuse-copenhagen-rohl

Why cycle tracks

Cycle track design: Current focus in Cph

Public engagement process – Examples

Content

Page 4: 4 cip infuse-copenhagen-rohl

Why cycle tracks

Page 5: 4 cip infuse-copenhagen-rohl

Quality matters

+18%

+55%

Modal split; effect of cycle tracks:

4% to 55% increase in cycling

volume

1% to 30% of increase due to modal

change or new trips

Page 6: 4 cip infuse-copenhagen-rohl

6

Connectivity matters

Page 7: 4 cip infuse-copenhagen-rohl

Tryghed før og efter anlæg af cykelstier

0

5

10

15

20

25

30

35

1 2 3 4 5 6 7 8 9 10

1 Meget utryg - 10 Meget tryg

Pro

cen

t

Stormgade før Stormgade efter

”Fantastic with the cycle tracks”

”Very happy with the cycle track. More Please”

”We NEED cycle tracks!”

Source: CityStop interviews

Percieved safety

- before and after

1: Very unsafe 10: Very safe

Perceived safety before and after

- Cycle Tracks Stormgade

Page 8: 4 cip infuse-copenhagen-rohl

Monday morning

Page 9: 4 cip infuse-copenhagen-rohl

9

Tuesday morning

Page 10: 4 cip infuse-copenhagen-rohl

Cykeltrafikarbejde

1989-2012

mio. km pr. dag

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

Cykeltrafikarbejde

Kilometers cycled in Copenhagen - Million km per day, 1989-2012

Page 11: 4 cip infuse-copenhagen-rohl

33,900

31,000

25,800 24,000

20,200

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

Nørrebrogade Knippelsbro Langebro Gyldenløvsgade Torvegade

Eksempler, højt trafikerede strækninger cykler, årsdøgnstrafik 2011

Streets with high cycling volumes (examples) - Yearly average, bicycles per day

Page 12: 4 cip infuse-copenhagen-rohl

12

More diverse traffic - Reality and ambition

Page 13: 4 cip infuse-copenhagen-rohl

Cycle track design: Current focus

•Optimizing capacity

•What is a cycle track

Page 14: 4 cip infuse-copenhagen-rohl

1

4

Copenhagen

Cycle Track

Page 15: 4 cip infuse-copenhagen-rohl

Copenhagen

Cycle Lane

Page 16: 4 cip infuse-copenhagen-rohl

On-street facillities:

350 kms of cycle tracks

25 kms of cycle lanes

Page 17: 4 cip infuse-copenhagen-rohl

1st generation tracks

•Two travel lanes each direction

•2-2,25 meter wide

•Very little else

Page 18: 4 cip infuse-copenhagen-rohl

Towards 2nd generation

Tracks. Focus on...

Page 19: 4 cip infuse-copenhagen-rohl

Billede af Square dance

Help needed...

Page 20: 4 cip infuse-copenhagen-rohl

Where shall I stop when doing a

left turn (I)?

Page 21: 4 cip infuse-copenhagen-rohl

Before After

Where shall I stop when doing a

left turn (II)?

Page 22: 4 cip infuse-copenhagen-rohl

vlcsnap-2012-05-15-16h21m14s134.png

Where shall I drive? - Conversational lanes

Page 23: 4 cip infuse-copenhagen-rohl

Where shall I slow down before

turning?

Page 24: 4 cip infuse-copenhagen-rohl

Getting rid of bottlenecks

Page 25: 4 cip infuse-copenhagen-rohl

ITS solutions: •”Before green”

•Dynamic green wawes

•Personalized green wawes

•Flexible use of space during the day

.

Page 26: 4 cip infuse-copenhagen-rohl

Information combined with infrastructure

”Good Cycling

etiquette”

33 % has noticed

89% positive

Difficult to measure

exact effect on

capacity

Page 27: 4 cip infuse-copenhagen-rohl

Bredere cykelstier gør en forskel

• Større kapacitet - lavere rejsetid

• Mere plads til cyklister og fodgængere

Dr. Louises Bro (before and after)

Østerbrogade 2011

Extra space if needed

(and possible): * Three travel lanes each direction

* 3 meter wide

2007

2011

Page 28: 4 cip infuse-copenhagen-rohl

Services

Page 29: 4 cip infuse-copenhagen-rohl

29

Tools

- Better design and normalizing

Page 30: 4 cip infuse-copenhagen-rohl

Capacity monitoring •Theoretical capacity

•Subjective capacity

Page 31: 4 cip infuse-copenhagen-rohl

Realistisk simulering af cykeltrafik

Micro Simulation

Page 32: 4 cip infuse-copenhagen-rohl

North American

influence (I)

Page 33: 4 cip infuse-copenhagen-rohl

Figure 3: BQI Assessment Results

North American

influence (II)

Page 34: 4 cip infuse-copenhagen-rohl

Public engagement

Page 35: 4 cip infuse-copenhagen-rohl

Kort med alle cykelprojekter der er på vej

Very different

depending on project

Page 36: 4 cip infuse-copenhagen-rohl

Carparking consequences •limited public involvement (but much debate)

•a (very) political decision

Page 37: 4 cip infuse-copenhagen-rohl

Local knowledge

Page 38: 4 cip infuse-copenhagen-rohl

Input to prioritizing - Something has to give

Page 39: 4 cip infuse-copenhagen-rohl

Traffic experiments

Page 40: 4 cip infuse-copenhagen-rohl

Be where the citizens are

Page 41: 4 cip infuse-copenhagen-rohl

…and have the data to

set the background

Page 42: 4 cip infuse-copenhagen-rohl

Thanks!

More info: www.kk.dk/cityofcyclists