R. A. MAcOnEOOR, P.ENO. 32084sweeie z. i3867 GAUTHIER 010 Report on Analysis of Samples Collected in Larder Lake and Other Areas of Ontario PAGE NO. RECEIVED 06 1990 MINING LANDS SECTION INTRODUCTION A number of previously collected samples were submitted for analysis for gold, whole rock and a few for silver, copper and zinc. Description of Samples Sample number 12821 Drill core from 95' in hole M-l, 1970 drilled on claim L102304, 1,000 feet south and 700' west #1 post Quartz veining and graphitic material 12867 Pyritized qtz veining 200' west 100' south #1 post L522776, Hearst Township 12868 Quartz vein, volcanic inclusion same location as 12867 12869 Quartz vein some pyrite 500' west 100' north #2 L919924 Hearst Township 12870 Quartz vein, barren same location as 12869 12871 Pyritized greywacke some location as 12869 12872 Greenish volcanic tuff, weak shearing 600' north 200' east # 3 post L1015372, Hearst Township 12873 Greenish volcanic tuff as above with 30?; white carbonate alteration 100' west of 12872 12874 Ryholite porphyry 400' east 50' south #4 post L522773 Hearst Township 12875 Quartz stringer, barren same location as 12874
34
Embed
32084sweeie z. RECEIVED · loi t ba ppm cr ppm nb ppm sr ppm y ppm zr ppm cta. 69.50 15.28 2.45 1.62 1.33 6.04 0.98 0.27 0.04 0.43 ... 69.00 608.00 108.00 21.40 6.00 j 1031.15
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
R. A. MAcOnEOOR, P.ENO.
32084sweeie z. i3867 GAUTHIER 010
Report on Analysis of Samples
Collected in Larder Lake and
Other Areas of Ontario
PAGE NO.
RECEIVED
06 1990
MINING LANDS SECTION
INTRODUCTION
A number of previously collected samples were submitted
for analysis for gold, whole rock and a few for silver, copper
and zinc.
Description of Samples
Sample number
12821 Drill core from 95' in hole M-l, 1970 drilledon claim L102304, 1,000 feet south and 700' west #1 post Quartz veining and graphitic material
12867 Pyritized qtz veining 200' west 100' south #1post L522776, Hearst Township
12868 Quartz vein, volcanic inclusion same locationas 12867
12869 Quartz vein some pyrite 500' west 100' north #2L919924 Hearst Township
12870 Quartz vein, barren same location as 12869
12871 Pyritized greywacke some location as 12869
12872 Greenish volcanic tuff, weak shearing 600' north200' east # 3 post L1015372, Hearst Township
12873 Greenish volcanic tuff as above with 30?; whitecarbonate alteration 100' west of 12872
12874 Ryholite porphyry 400' east 50' south #4 postL522773 Hearst Township
12875 Quartz stringer, barren same location as 12874
R. A. MACGREGOR, P.ENO PAGE NO.
Sample number
12876
12877
12878
12879
12880
12881
12882
12883
12884
12886
12887
12888
12889
12890
Carbonated volcanic with qtz-carb stringers 100' south #1 post L1046094, Gauthier Township
Massive sulphide 50' west, 25' south #1 post L1046094 Gauthier Township
Massive sulphide with white oxide stain (zinc?) same location as 12877
Massive sulphide with some qtz sugary texture same location as 12877
Disseminated sulphide in andesite same location as 12877
Disseminated sulphide in andesite same location as 12877 check on 12880
Quartz stringers in greywacke 800' south 200' west #1 post L736735, McGarry Twp.
Greywacke 50' west 25' north #2 post L821918, Hearst Township
Tuff? or greywacke 400' west 300' north #2 post L821918, Hearst Township
Greywacke? with crenulated bedding trace pyrite 50' north 12884
Coarse greywacke, micro conglomerate 21 pyrite with feldspar alteration on slips 500' west #1 post L821917, Hearst Township
Matrix of volcanoclastic-conglomerate? 200' west 100' south #1 post L821916, Hearst Township
Clast of volcanoclastic (peridotitic?) same location as 12887
Sheared quartz-feldspar porphyry with traces, of graphite? on shear planes. 400' south 300'west #1 post L971303, Hearst Township
Basalt 600' west 300' north #2 post L821915, Hearst Township
R. A. MAcOREOOR, P.ENO. PAOE NO.
Sample Number
12891
12892
12893
12894
12895
12896
12897
12898
12999
12900
Special
Limestone? float from Little White River h mile south bridge across river on Highway 546, Albanel Township
Carbonate tuff 800' south 600' west #1 post L523458, Hearst Township
Greywacke with mud clasts 300' south #1 post L736735, McGarry Township
Greenish-grey greywacke with yellowish-brown alter ation stringers 800' south #1 post L736735, McGarry Township
Fine grained greywacke at #3 post L532833, Hearst Township
Pink, fine grained felsic intrusive with faint mafic spots-trace sulphide 600' north 500' east #3 post L548652, McFadden Township
Blackish green well bedded tuff with black micaa little qtz-carb veining and sulphide same locationas 12896
Carbonate tuff, bedded white carbonate and hairline bands of greenish black mafic material 800' south 600' west of #1 post L523458, Hearst Township
Black mafic intrusive? l-2% l mm cubic pyrite with copper sheen. 900' south 100' west #1 post L523459, Hearst Township
Sheared and altered fine grained felsic tuff? whitish-black with yellow brown alteration and quartz stringers 800' west 150' south of #1 post L522775, Hearst Township
Sheared and altered intermediate volcanic or tuff Light greenish colour with shearing or bedding planes 300' west 100' north #2 post L1048436, Catharine Township
R. A. MAcOREGOR. P.ENO. PAGE NO.
Soil Samples
Sample No
1
2
3
Blackish till-organic material depth 3" 700 ' west 700' south #1 post L548656, Rattray Township
Brownish sandy till depth 3" 50' west of sample #1
Sandy till brownish colour at rock soil interface 50' west 15' south #1 post L1046094, Gauthier Township
Brownish sand depth 2" 300' west #1 post L1046094 Gauthier Township
CONCLUSIONS
The sample descriptions are field descriptions
of samples. Analysis, particularly whole rock, will assist in
better classification of these rocks. No gold anomalies were
found. Sulphide samples from Gauthier Township are possibly
anomalous in copper and zinc. Almost all rocks from Hearst Township
appear to be anomalous in chromium. The limestone float sample
from Albanel Township has elevated iron and manganese values.
Respectfully Submitted
January 29, 1990 R.A. MacGregor, P. Eng.
Established 1928
Swastika LaboratoriesA Division of Assayers Corporation Ltd.
Assaying - Consulting - Representation
(Errliftrate nfCertificate No.____77221 nata Dec. 29. 1989
rnlng ActReport of Work(Expenditures, Subsection 77(19))
32oe4sweeie 2.i see? GAUTHIER900
Type of Work Performed
AssayingRecorded Holder
R.A. MacGregorAddress
c/o P.O. Box 1110, SAULT
9
Mining Division
Larder Lake
.t^0(.'^^w
STB. MARIB, On t.
1-P6A
Township or Area .... ...
Hearst. McFaddea t
5H7
Prospector'* Licence No.
K15070
Rattri
Telephone No.
949-5928Work Performed By
Swastika LaboratoriesName and Address of Author (of Submission)
R.A. MacGregor, 28 Ford St. , Sault Ste. Marie, On t.
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. 'See Note No. 1 on reverse side
Mining Claim No. of Dayi l Mining Claim
I.52345fl' 4 157^522776
No. of Dayi
1.57Mfn*l}ria*i*** w N6"drWyf Mining Claim No. of Dayt
L821916I 5.251 L821917I 2.92InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column
Mining CWm ^^
L548656Mining CWm
L522775
No. of Dayi
0.9JNo. of Dayi
2^92Mining CWm No. of Dayi
L&2191&I 7.5fCal
Mining Claim
L54865]Mining Claim
L522773Mining Claim
No. of Dayi
L-SiSJNo. of Dayt
1*SJLNo. ofDayt
culation of Expenditure Days Credits Total Expenditures
S 655.95 f 15 -
Date When Work wi
Mining Claim
L532833Mining CWm
r,9]9924Mining CWm
Total Days Credits
4vjJ
No, of Dayi
2.33No. of Dayi
2.35No. oTDayt
w Performed
Mining CWm
L523459Mining CWm
L971303Muifng CWm
No. of Dayi
2.92No. of Dayi
2,92T&oOJayi
Total Number of Mining Claims Covered by this Report of Work
y
Mining Claims (List in numerical sequence). If space Is insufficient, attach schedules with required InformationMining Claim
Prefix NumberExpend. Days Cr.
Mining ClaimPrefix
Total Number of Days Performed
43.74
Number
Ri
FE
MINING
Expend. Days Cr.
CE1U U 1
B21
-urn
Mining ClaimPrefix
wu:1990
-SECT
Number
i
m —
Total Number of Days Claimed
nrm 43.74
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Total Number of Days to be Claimed at a Future Date
4/WfflA r,',/Certification of Beneficial Interest 'See Note No. 2 on reverse side
l hereby certify that, at the time the work was performed, the claims covered In this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder.
Date
Feb. 1/90Recoi Agenj
Certification Verifying Report of Workl hereby certify that l have a personal and Intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report Is true.Name and Address of Pereon Certifying
R.A. MacGrecror. 28 Ford •.tt. Maria. Ontario P6
ASSLSL'.fv.EiN
For Office Use Only
Ministry ofr,j northern Development
_ and Mines Ontato Oil
Report of Work Mining Act (Expenditures, Subsection 77(19))
Instructions- Please type or print. (- Refer lo Subsection 77(18). (he Mining Acl tor assessment work
requirements and maximum credits allowed under this Subsection.- Technical Reports, maps and proof of expenditures In duplicate
should be submitted lo Mining Lands Section, Mineral Development and Lands Branch.
xcatorieaName and Address of Author (of Submission)
R.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ont.Date When Work was PerformedfT:ll 89 ft 01 90
D*y l Mo. j Yr. Dty l Mo.1 Yr.
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. See Note No, 1 on reverse side
Mining Claim No. of OaytL104609S 0.74
Mining Claim No. of Dayt Mining Claim
L1046094No, Of Dayt
8.6(Mining Claim No of Days
Mining Claim No. of Oayt Mining Claim ,No. of Days Mining Claim No. of Dayt Mining Claim No. of Dayi Mining Claim No. of Dayt Mining Claim No. of Dayt
Mining Claim No. of Dayt Mining Claim No. of Oayt Mining Claim No. of Days Mining Claim No. of Oayt Mining Claim No. of Dayt Mining Claim No. of Days
Instruction*Total days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column (betow).^^^^-^^^ -^^^ ^ ^-
Calculation of Expenditure Days Credits Total Expenditures_____
141.70
Total Days Credits
Total Number of Mining Claims Covered by this Report of Work
Mining Claims (List in numerical sequence). If space is insufficient, attach schedules with required InformationMining Claim
Prefix
L
Number
1046094
Expend. Days Cr.
9.44
Mining ClaimPrefix
Total Number of Days Performed
9.44
NumberExpend. Days Cr.
Mining ClaimPrefix Number
REG
crn1 w W
MINING L
Expend.Days Cr.
m^L 5 *
r. 3 19
tflOS!
Mining ClaimPrefix
R^
30
ECtJO
Number
i
Expend. Days Cr.
Total Number of Days Claimed Total Number of Days to be Claimed at a Future Date
9.44 nilCertification of Beneficial Interest 'See Note No. 2 on reverse side
l hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder. _____________________________
DateFeb. 1/90
signature)
Certification Verifying Report of Workl hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion end the annexed report is true.
R.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ont.Date When Work was Performed From: ,To:U til W.
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. 'See Note No. 1 on reverse side
Mining Claim .No. of Days
L1048436 2.33Mining Claim No. M Days Mining Claim No. of Day* Mining Claim No. of Days
Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days
Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days
Instruction*Total days credits may be distributed at claim holder's choice. Enter number of days credits per claim In the expenditure days credit column (below).___________________
Calculation of Expenditure Days Credits Total Expenditures
S 35.00
Total Days Credits
Total Number of Mining Claims Covered by this Report of Work
Mining Claims (List in numerical sequence). If space is insufficient, attach schedules with required informationMining Claim
Prefix
L
Number
1111217
Expend. Days Cr.
2.3:
Mining ClaimPrefix j Number
Expend. Days Cr.
IECE1VJ&&"" "" jFEB aiisfl
MINING LANDS i FfiTIOl(.vi IV
Mining ClaimPrefix Number
Total Number of Days Performed
2.33
Total Number of Days Claimed
2.33
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Total Number of Days to be Claimed at a Future Date
nilCertification of Beneficial Interest "See Note No. 2 on reverse side
l hereby certify that, at the time the work was performed, the claims covered In this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder. ^^^ ____________
DateFeb. 1/90
ature)
Certification Verifying Report of Work
l hereby certify that 1 have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name and Address of Person CertifyingR.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ontario P6A 4M4
Telephone No.
705-949-5928
For Office Use Onlyal Days
Cr. Recorded
. 33
Date Recorded .1
Date Approved as Recorded
Mining Recorderv
ev (i^Wr^vj
Date
Feb. 1/90Received Stamp
878(88/06)
r *
*
..of Northern Develop*and Minest
DOCUMENT2.3
Mining Act"fleport of Work
(Expenditures, Subsection 77(19))2, 130
Instruction*- Please type or print.-^efe***wSubsectlon 77(19), in* Mining Act tor assessment won
ft-*equlrements and maximum credits allowed under this Subsection V/echnVal Reports, maps and proof of expenditures In duplicate
should be submitted to Mining Lands Section, Mineral Developmentand Lands Branch.
Type of Work Performed
ASSAYINGRecorded Holder
Skead Holdings Ltd.
Township or Area
Catherine Tovnahip
•JAM QK 1990Prospector's Licence No.
T-1956Address
C/Q P.O. Box 1110. SAULT STB. MARIE, Ont. P6A 5.?7*.'*j— : . - ———————————"—————————————————. -.... J. A—i a linn—nfrtlMINING LANDS
Telephone No.
949-5928Work Performed By
Swastika LaboratoriesName.and Address of Author (of Submission)
R.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ont.Date When Work was Performed
08 89| 09 BSDay | Mo. j Yr. | Day | Mo. l Yr.
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. See Note No. 1 on reverse side L046122 6.6
Mining Claim No. of Dayi Mining Claim
1048435]No. OfDayi
Mining Claim No. of Days
Mining Claim No. of Dayi Mining Clam
Mining Claim
No. of Days
Mining Calm No. of Days Mining Claim No. of Dayi Mining Claim .No. of Dayi Mining Claim No. ofDayi No. of Days
Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Dayi Mining Claim No. of Day* Mining Claim No. of Dayi
InstructonsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim In the expenditure days credit column
Calculation of Expenditure Days Credits Total Expenditures____^_
S 113.75
Total Days Credits
Total Number of Mining Claims Covered by this Report of Work
15 .
Mining Claims (List in numerical sequence). If space Is Insufficient, attach schedules with required InformationMining Claim
Prefix
L
Number
1049759
Expend. Days Cr.
7.6
Mining ClaimPrefix
Total Number of Days Performed
7.6
NumberExpend. Days Cr.
Mining ClaimPrefix Number
Total Number of Days Claimed
7.6
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Total Number of Days to be Claimed at a Future Date
^9
Certification of Beneficial Interest 'See Note No. 2 on reverse side1 hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded In the current recorded holder's name or held under a beneficial Interest by the current recorded holder.
1 hereby certify that 1 have a personal and intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report Is true.Name and Address of Person CertifyingR.A. MacGregor, 28 Ford St.,
For Office Use Only
f bt'ai Days Cr. Recorded
-7-6*
Date Recorded **5*2/-
Date Approved as Recorded
*78{8W06) /f/ ' ** W ~ -rf/
Sault Ste. Marie, Ontario P6A 4N4 .^st J&7. ^
Telephone No.705-949-5928
Mining Recorder -- f^X.
^c-. \Cu-TXXTjo-UPrfvinUal Man
/M.j^" **" r*'
af&l/Gnlng Lands '
s^————^es
DateNov. 28/89Received Stamp - lAMC
Iff! P UJ&'fu-U 0
*fflsj^y^^—
Affirmly^V/ibJIJ!
:C 4 m b-';
r- -
Ontario
Ministry of VJ.' Hortherr^DevSIopment and Mines
irMmiing ActReport of Work(Expenditures, Subsection 77{1S})"
(refraction*- Please type or print.- Refer to Subsection 77(19), the Mining Act for assessment work
requirements and maximum credits allowed under this Subsection.- Technical Reports, maps and proof of expenditures In duplicate
should be submitted to Mining Land* Section, Mineral Development and Lands Branch.
Type of Work PerformedAssaying
Mining DivisionLarder Lake
Township or ATMMcGarry Township
Recorded HolderR.A. MacGregor
Prospector s Licence No. K15070
Addrestc/o P.O. Box 1110, SAULT STE. MARIE, On t. P6A 5H7
Telephone No.
949-5928Work Performed By
Swastika LaboratoriesName and Address of Author (of Submission)R.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ont.
Date When Work was Performed From: i To
All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. 'See Note No. 1 on reverse side
Mining Claim No. of Days
L736735 5.45Mining Claim No. of Days Mmlng Claim No. of Day* Mining Claim No. of Days
Mining Claim No. ct Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Days Mining Claim No. of Dayt Mining Claim No. of Days
Mining Claim No, of Days Mining Claim , No. of Days Mining Claim No. of Days Mining Claim , No. of Days Mining Claim No. of Days Mining Claim No. of Days
Instructions Total days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column (below). ^^-^^- ^-^^ ^^
Calculation of Expenditure Days Credits Total Expenditures
S 81.75
Total Days Credits
Total Number of Mining Claims Covered by this Report of Work
dining Claims (List in numerical sequence). If space is Insufficient, attach schedules with required InformationMining Claim
Prefix NumberExpend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
760505737427 2.45
RECEINJ-MAP O Q
ANDS SECTION
Total Number of Days Performed
5.45Total Number of Days Claimed
5.45Total Number of Days to be Claimed at a Future Date
nilCertification of Beneficial Interest 'See Note No. 2 on reverse side
l hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder. ___________________
DateFeb. 1/90
re)
Certification Verifying Report of Work
l hereby certify that l have a personal and intimate knowledge of the facts set forth In the Report of Work annexed hereto, having performed the work or witnessed same during and/or after Us completion and the annexed report is true.
Name and Address of Person CertifyingR.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ontario P6A 4H4
Telephone No.
705-949-5928DateFeb. 1/90
Ce
Received Stamp
For Office Use Only
78(89/06)
I FEB 5
flf
satJMo (H.S. 901 r
f^ ^''^-^ras f ^y^—-—TC290*r'L. ^ L .. W .-M*
l v**^
tSZI^C^ i ^8(^30——I—-i — -J———-v----
l --- ' L *. LI.OBST* IOBr* ; WBS74i setter 'tarrant *et?3t' i ! *3S4fl
•isS^8SSV*-.5
e.
rov^poesC^
O l (p) W.H.S
1^754*1252^
,, L - \L 25245.- vj4kUt44\ eJ leJ\ e \/
-1---4- * V ^25242
124649
713500
4*63
M.S. K 905K).®
^-'t/
925
Li.^^4-——v ^df^^P^A/^'"""" r "1 ^^SH^W-^tv-"""-ftr-: t . . i. i jS^t*^ 25339, i V* u V iJ0- \*r "^ j , Kj*?771 i LSZZTTZ ' L*784* **Vv j ^- V r?? M. f\ L S L^fejH^^apr i-4-M?^S6^^^^i^^ffi^SF^^?;**''1,***1' v^ f^@Tl^-i—i-'-i-d
- Refer to Wirfbclifti 77{^? thfc-fvTiniiV^ctlei'asselsmenl work requirements end maximum credits allowed under this Subsection.
inV^ct wrassessm
wMining Act
Report of Work FIB Q 6 199&{Expenditures, Subsection 77(19)) C.
Type of Work PerformedAssaying
J UiniAO-AMINING UNDS gg
- lecnnicai neports, maps ano prooi or expenditures m oupncaie A f\s should be submitted to Mining Lands Section, Mineral Development \*~i and Lands Branch.) if
'B8P LakeTownship or Area
McGarry TownshipRecorded Holder
R. A. MacGregorAddress
c/o P.O. Box 1110, SAULT STE. MARIE, Ont. P6A 5N7
Prospector's LicenceK15070
No.
Telephone No.949-5928
Work Performed BySwastika Laboratories A
Name and Address of Author (of Submission) jR. A. MacGregor, 28 Ford St., Sault Sh^j. Marie/, Ont.
f \ XAll the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. 'See Note No. 1 on reverse side
Mining Claim
Mining Claim
No. ol Days
No. ol Days
Mining Claim
Milling Claim
No ol Days
No of Days
InstructionsTotal days credits may be distributed at claim holder's choice. Enter number of days credits per claim in the expenditure days credit column
Mining Clairrf No, of^Oays MinirfysC
L736735J 5.45Mining Claim .No. ol Days Mining C
Minjng Claim N^pTDays Mining C
] i(aim ,No Q\ Days
^dl .lalm i No. ol Days
llaim i No. of Days
ii i
CataulalionVil Expenditure Days Credits 1 Total Expenditures i
[s ^ 81.15 J M -
Mining Claim
fining Claim
Mining Claim
Total Days Creditsl l
Date When Work we From:1 O 11 OQrVi-U i 8*.
9 Performed
No", of bay's
No ol Days
No. ol Days
Mining Claim No. ol Days
Mining Claim
Mining Claim
No. ol Days
No. ol Days
Total Number of Mining Claims Covered by this Report of Work
2Mining Claims (List in numerical sey)yJence|N(v space is inefficient, attach schedules with required information
Mining ClaimPrefix
-i
L
Number
J605Q5
Expend/ Days C/.
.j f-2 5
\7
/*
\Prefix
^--^
Total Number of Days Performed
5.45
rtinlnh Claim \\ \Number \
\
1
1
y
Expend. Days Cr.
/Mining ClaimPrefix^ Number
Total Number of Days Claimed
5.45
Expend. Days Cr.
Mining ClaimPrefix Number
Expend. Days Cr.
Total Number of Days to be Claimed at a Future Dale
nilCertification of Beneficial Interest 'See Note No. 2 on reverse side 7 .
l hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial Interest by the current recorded holder.
DateFeb. 1/90
Reco r Agerj nature)
Certification Verifying Report of Work1 hereby certify thai 1 have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.Name and Address of Person CertifyingR.A. MacGregor, 28 Ford St., Sault Ste. Marie, Ontario P6A
?t)i475H |;'H7SI1 U L^^-n-^LrL"T?H/!'^! l (?fi^2(U
*iv.
30709
4^1991 ,| *lW)h'. C
l (V*?*l
i: Q .a:--yi;- f
n7- Lur'^'; - W 441! S3
xf "L
^
30706 .' '; \ JOBHI
*| Mill.
\\ *J. l- l lV--""' v B97P l !W*
1001 J \ **40AI', ^.^^ \ .1 O- MM..M--V
'.:/' 9Gii
MTl
i ' (l ' 8 BUUOOO J 399002 l Btf9O03'-l ^ J
tL so? soo '——^r^o \V-~-n 1 L \.^'f t b i ci- y fi\L w^' ft * s . u v , * '' \"}ts\- T' l ... l\\ttll? t , *i—--"1--^* ;V;.M6r* "J i . \ (T r) \.- Vft'Jfl 8WOIJ W40M MilOl n\ W;• L-'-'r' 1^'M l 'v.r\ *,V-- 1 "~ li^V^F U * -...'..... l hr
...--•ti , i..*ii- ^••l" 8\ - \,\l,M4o ,\*4lM p\ trVlMl -- t. |t ,L."- V',.1. -' r i.. - V \ ; - V ~ ;- \ l ^^- ."^v- i'-A
. r-';r~:,U—f'v \ l ,,,, \ **'.; \-^"\\ ,) ' .,:x \ L 9 ,M \ " 4r * V16M ^ njll l uwtB V"''' ' 'u.' hiii . i . i u \ .•'L-''.' l - *i ...... i -.\8 ..--- i *" l i'
t^ J '?li*fxK u , (!. l" '- l ' * 14 \ M \* - l \ i-^U'Jlil^ \HJ4Hjr.\ i , | i:j i L^ * h ' f1 " 11 * \U"irwi r \ Hi. V \, w 'T V-.-4 -l "v V.,;; r-.l, '-'—K .'^L.K """i ,,,;V- K\"-.\ i' -,,T-; .l -- J
•fr ' 'i.";/'
S M O
0 14004.KJ
flB-W-l
•f-l
7 ?*" : f.
y "' ^ .^V ,M
4M.
s* p ~\ i.r.., pJlia ' . V-—.. *
yiiS.' t* "
. L|L v -i!".o.. /\\ ?.i-r.M |^^"'A:' l ;\BB5KJfil.
® Surfoct and Mining Rights withdrawn Staking, section 36/60 order NO.SA^J
O/TBrtT OPtN5 W/72/B7
from
from
NOTICE OF FORESTRY ACTIVITYTHIS TOWNSHIP y AREA FALLS WITHIN THE ——
32004S*eei8 2.13867 GAUTHIER
705-642-3222250
LEGEND
HIGHWAY AND ROUTE No.
OTHER ROADS
TRAILS
SURVEYED LINES;TOWNSHIPS, BASE LINES, ETC
MCFADDEN TWP.
LOTS, MINING CLAIMS, PARCELS, ETC
UNSURVEYE:D LINES:LOT LINLSPARCH BOUNDARYMINING CLAIMS ETC.
RAILWAY AND MIGHT OF WAY
UTILITY l INtS
NON-PERENNIAL STREAM
FLOODING OH H OODING RIGHTS
HR ^ RESERVATIONS
ORIGINAL. SHORELINE
MARSH OH MUSKEG
MINES
TRAVERSE MONUMENT
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENT
PATENT. SURFACE 8- MINING RIGHTS
. SURFACE RIGHTS ONLY ^
.MINING RIGHTSONLY, ..
LEASE, SURFACE ft MINING RIGHTS
" .SURFACE HIGHTSONLY.. ...... .............. M , B
" . MINING RIGHTS ONLY.......... ........... ....... U
LICENCE OF OCCUPATION ....... ... ——— ..— .......... T
ORDER IN COUNCIL . ... — ...,--.-.- . ................ OC
RESERVATION
CANCELLED
SAND ft GRAVEL .^....................-. . ... ........... (J)
10902H 1030212 .10902,3 I09OZI4 lK—(r——K—-
MOTE: MINING MIGHTS IN PARCELS PATtNlLUPHIOH TO MAY 6, 1913, VtSrtD IN ORIGINAL PATfcNll.t BY THE PUBLIC LANDS ACT, H SO 1970, CHAP 300, St C 63, SUBStC 1