7/29/2019 23. Mikael Strom
1/24
Bild 1 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Gathering and communicating requirements forevaluation of PLM-systems
Mikael Strm, IVF, Chairman [email protected]
(On short notice instead of other presentation)
7/29/2019 23. Mikael Strom
2/24
Bild 2 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
PLM-systems are expensive to purchase and
implement
Handled the wrong way they can cause more
problems than advantages
Handled the right way the gain can be huge
7/29/2019 23. Mikael Strom
3/24
Bild 3 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
IVFs method for:
Gathering and communicating requirements
for evaluation of PLM-system is built on experiencefrom practical cases and studies of scientific results
The method contains 20 steps in total and I will
talk about some of the main steps of the method.
7/29/2019 23. Mikael Strom
4/24
Bild 4 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
5/24
Bild 5 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
-Analysis of the business objectives of the target organisation- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
6/24
Bild 6 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Req. 1
Req. 2
---
---
Req. NReq. N+1
Req. N+2
---
---
Req. K-1
Req. K+2
Business
objective 1
Business
objective 2
Sub objectivesRequirements
7/29/2019 23. Mikael Strom
7/24
Bild 7 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
8/24
Bild 8 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
P1.1 P1.2
P1
Process mapping, Value stream mapping
7/29/2019 23. Mikael Strom
9/24
Bild 9 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Process mapping
Info in
Organisation Resource
EventProcess
Info out
Inspired by:
-Idef0
-Aris-UML
7/29/2019 23. Mikael Strom
10/24
Bild 10 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Capture:
-Process value
-Process time
-Calendar time
-Waiting time-Queue time
-Diffuse processes
-Performance problems
For each process
7/29/2019 23. Mikael Strom
11/24
Bild 11 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
12/24
Bild 12 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Find parts
/structureNote part
numberSearch for
3D models
Change
Models
Generate
Drawings
Update
3D-
archive
Change
notification
Store
drawingsUpdate
parts
3D-
archive
CAD-
system
3D-
archive
On
paper
Part
database
CAD-
system
Drawing
archive
Part
database
system
Original Process (simplified)
7/29/2019 23. Mikael Strom
13/24
Bild 13 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Find parts
/structure
Change
Models
Generate
Drawings
Change
notification
Check in
Drawing
CAD-
systemPLM-
system
CAD-
system
PLM-
system
Check out
3D-model
Improved process with less waste by support from a PLM system
Previous process
7/29/2019 23. Mikael Strom
14/24
Bild 14 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
15/24
Bild 15 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
1925 KSEKTotal (KSEK)
2 h x 250 kr x 44 v x 10 p = 220 kSEKManually copy existing
solutions
4 h x 250 kr x 44 v x 20 p = 880 KSEKUpdate archivesystems
1 h x 250 kr x 44 v x 5 p = 55 KSEKSupply others with
information
1,5 h x 250 kr x 44 v x 20 p = 330 KSEKLook for information
2 h x 250 kr x 44 v x 15 p = 330 KSEKManuel transfer of data
1 h x 250 kr x 44 v x 10 p = 110 KSEKFind parts
Time/ costTask
Calculate profit in money from identifies gains
(limited example)
7/29/2019 23. Mikael Strom
16/24
Bild 16 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
17/24
Bild 17 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Simplified example of a demonstration scenario:
Make an ECO:
Search for the part subject to change
Make part of and contains of analysis
Download 3D-models subject to changeMake the change
Generate new drawings
Create and launch ECO in a work flow
A demonstration scenario makes it easier to
compare different solutions to a particular use case
7/29/2019 23. Mikael Strom
18/24
7/29/2019 23. Mikael Strom
19/24
Bild 19 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Communicate needs/ requirements to solution providers with:
Graphs ofBusiness objectives Processdescriptions Demonstrationscenarios
and also descriptions like use cases, information models,textual descriptions, need for data migration etc not
mentioned in this presentation.
Receive answers with implementation time.
7/29/2019 23. Mikael Strom
20/24
Bild 20 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
21/24
Bild 21 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Cash flow calculation
Year 1 Year 2 Year 3
Saving Saving Saving
Cost Cost Cost
Accumulated Accumulated Accumulated
Profit/loss Profit/loss Profit/loss
+ + = + =
Implementation time becomes critical
+
-
=
Start of
implementation
project
7/29/2019 23. Mikael Strom
22/24
Bild 22 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
Some of the main steps of the method are:
- Analysis of the business objectives of the target organisation
- Process-mapping of critical business processes
- Evaluation and prioritisation of gains in different business
processes
- Saving of time- Saving of material
- Saving due to better process performance
- Calculation of gains in money
- Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers
- Making of a cash flow calculations
- Comparison of alternatives and selection of a solution
7/29/2019 23. Mikael Strom
23/24
Bild 23 2006-01-30
IVF Industrial Research and Development Corporationwww.ivf.se
6000-750 + 250 =
5500
6000 750 5000
= 250
2500 7500 =
-5000
3 Best !!
5000 8502300= 1850
4200 30003500 = -2300
1000 4500 =-3500
2
6000 750
2000 = 3250
5000 2000
5000 = -2000
1000-6000 =
-5000
1
Accumulated
Profit/ loss year 3
(kSEK)
Accumulated
Profit/ loss year 2
(KSEK)
Accumulated
Profit/ loss year 1
(KSEK)
Alternative
Compare alternatives that all fulfils the needs/ requirements
= Implem. cost = Accumulated = Loss = Profit = Maint. Cost
= Saving
7/29/2019 23. Mikael Strom
24/24