  • 7/29/2019 23. Mikael Strom

    1/24

    Bild 1 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Gathering and communicating requirements forevaluation of PLM-systems

    Mikael Strm, IVF, Chairman [email protected]

    (On short notice instead of other presentation)

  • 7/29/2019 23. Mikael Strom

    2/24

    Bild 2 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    PLM-systems are expensive to purchase and

    implement

    Handled the wrong way they can cause more

    problems than advantages

    Handled the right way the gain can be huge

  • 7/29/2019 23. Mikael Strom

    3/24

    Bild 3 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    IVFs method for:

    Gathering and communicating requirements

    for evaluation of PLM-system is built on experiencefrom practical cases and studies of scientific results

    The method contains 20 steps in total and I will

    talk about some of the main steps of the method.

  • 7/29/2019 23. Mikael Strom

    4/24

    Bild 4 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation- Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    5/24

    Bild 5 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    -Analysis of the business objectives of the target organisation- Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    6/24

    Bild 6 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Req. 1

    Req. 2

    ---

    ---

    Req. NReq. N+1

    Req. N+2

    ---

    ---

    Req. K-1

    Req. K+2

    Business

    objective 1

    Business

    objective 2

    Sub objectivesRequirements

  • 7/29/2019 23. Mikael Strom

    7/24

    Bild 7 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    8/24

    Bild 8 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    P1.1 P1.2

    P1

    Process mapping, Value stream mapping

  • 7/29/2019 23. Mikael Strom

    9/24

    Bild 9 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Process mapping

    Info in

    Organisation Resource

    EventProcess

    Info out

    Inspired by:

    -Idef0

    -Aris-UML

  • 7/29/2019 23. Mikael Strom

    10/24

    Bild 10 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Capture:

    -Process value

    -Process time

    -Calendar time

    -Waiting time-Queue time

    -Diffuse processes

    -Performance problems

    For each process

  • 7/29/2019 23. Mikael Strom

    11/24

    Bild 11 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    12/24

    Bild 12 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Find parts

    /structureNote part

    numberSearch for

    3D models

    Change

    Models

    Generate

    Drawings

    Update

    3D-

    archive

    Change

    notification

    Store

    drawingsUpdate

    parts

    3D-

    archive

    CAD-

    system

    3D-

    archive

    On

    paper

    Part

    database

    CAD-

    system

    Drawing

    archive

    Part

    database

    E-mail

    system

    Original Process (simplified)

  • 7/29/2019 23. Mikael Strom

    13/24

    Bild 13 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Find parts

    /structure

    Change

    Models

    Generate

    Drawings

    Change

    notification

    Check in

    Drawing

    CAD-

    systemPLM-

    system

    CAD-

    system

    PLM-

    system

    Check out

    3D-model

    Improved process with less waste by support from a PLM system

    Previous process

  • 7/29/2019 23. Mikael Strom

    14/24

    Bild 14 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    15/24

    Bild 15 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    1925 KSEKTotal (KSEK)

    2 h x 250 kr x 44 v x 10 p = 220 kSEKManually copy existing

    solutions

    4 h x 250 kr x 44 v x 20 p = 880 KSEKUpdate archivesystems

    1 h x 250 kr x 44 v x 5 p = 55 KSEKSupply others with

    information

    1,5 h x 250 kr x 44 v x 20 p = 330 KSEKLook for information

    2 h x 250 kr x 44 v x 15 p = 330 KSEKManuel transfer of data

    1 h x 250 kr x 44 v x 10 p = 110 KSEKFind parts

    Time/ costTask

    Calculate profit in money from identifies gains

    (limited example)

  • 7/29/2019 23. Mikael Strom

    16/24

    Bild 16 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    17/24

    Bild 17 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Simplified example of a demonstration scenario:

    Make an ECO:

    Search for the part subject to change

    Make part of and contains of analysis

    Download 3D-models subject to changeMake the change

    Generate new drawings

    Create and launch ECO in a work flow

    A demonstration scenario makes it easier to

    compare different solutions to a particular use case

  • 7/29/2019 23. Mikael Strom

    18/24

  • 7/29/2019 23. Mikael Strom

    19/24

    Bild 19 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Communicate needs/ requirements to solution providers with:

    Graphs ofBusiness objectives Processdescriptions Demonstrationscenarios

    and also descriptions like use cases, information models,textual descriptions, need for data migration etc not

    mentioned in this presentation.

    Receive answers with implementation time.

  • 7/29/2019 23. Mikael Strom

    20/24

    Bild 20 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    21/24

    Bild 21 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Cash flow calculation

    Year 1 Year 2 Year 3

    Saving Saving Saving

    Cost Cost Cost

    Accumulated Accumulated Accumulated

    Profit/loss Profit/loss Profit/loss

    + + = + =

    Implementation time becomes critical

    +

    -

    =

    Start of

    implementation

    project

  • 7/29/2019 23. Mikael Strom

    22/24

    Bild 22 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    Some of the main steps of the method are:

    - Analysis of the business objectives of the target organisation

    - Process-mapping of critical business processes

    - Evaluation and prioritisation of gains in different business

    processes

    - Saving of time- Saving of material

    - Saving due to better process performance

    - Calculation of gains in money

    - Creation of demonstration scenarios for PLM-system evaluation- Communication of needs to solution providers

    - Making of a cash flow calculations

    - Comparison of alternatives and selection of a solution

  • 7/29/2019 23. Mikael Strom

    23/24

    Bild 23 2006-01-30

    IVF Industrial Research and Development Corporationwww.ivf.se

    6000-750 + 250 =

    5500

    6000 750 5000

    = 250

    2500 7500 =

    -5000

    3 Best !!

    5000 8502300= 1850

    4200 30003500 = -2300

    1000 4500 =-3500

    2

    6000 750

    2000 = 3250

    5000 2000

    5000 = -2000

    1000-6000 =

    -5000

    1

    Accumulated

    Profit/ loss year 3

    (kSEK)

    Accumulated

    Profit/ loss year 2

    (KSEK)

    Accumulated

    Profit/ loss year 1

    (KSEK)

    Alternative

    Compare alternatives that all fulfils the needs/ requirements

    = Implem. cost = Accumulated = Loss = Profit = Maint. Cost

    = Saving