2019 Manatee County Project Priorities Dec 18, 2018 Page 1 of 3 Rank Facility (Project) Improvement Description Next Phase Roadway Network Code FDOT Funding Code LRTP Funding Code 1 DeSoto Bridge (US41/US301) 21st Ave W (Bradenton) US 19 (Palmetto) replace DeSoto Bridge and improve US 41/US 301 approaches consistent with the PD&E and Bradenton-Palmetto Connector Study findings Design SHS BRP RRI 2a 15th St E (a) Magellan Dr 49th Ave E reconstruct two-lane roadway consistent with complete streets principles Construction RRN/SHS HC RRI 2b 15th St E (b) Tallevast Rd Magellan Dr reconstruct two-lane roadway consistent with complete streets principles Construction RRN HC RRI 2c 15th St E /301 Blvd (c) 49th Ave E US 41 (1st St) reconstruct two-lane roadway consistent with complete streets principles Construction RRN HC RRI 3 ATMS Communication and Devices Expansion State and County signalized road corridors Countywide. Deploy fiber optic cable (FOC), closed circuit television (CCTV) cameras, microwave vehicle detection system (MVDS) sensors, Bluetooth travel time measuring devices, Arterial Dynamic Message Signs (ADMS), and advance vehicle detection. Construction RRN/SHS TSM&O ATMS 4 RTMC Networking Infrastructure Regional Traffic Management Center and four hubs -- Replace aging network and monitoring infrastructure. Design RRN/SHS TSM&O ATMS On behalf of Manatee County, we hereby recommend the following list of transportation projects, ranked by priority, for funding consideration by FDOT. Project Limits
7

2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

Feb 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

2019 Manatee County Project Priorities Dec 18, 2018

Page 1 of 3

RankFacility

(Project)Improvement Description

Next Phase

Roadway Network

Code

FDOT Funding

Code

LRTP Funding

Code

1 DeSoto Bridge (US41/US301)

21st Ave W (Bradenton)

US 19 (Palmetto) replace DeSoto Bridge and improve US 41/US 301 approaches consistent with the PD&E and Bradenton-Palmetto Connector Study findings

Design SHS BRP RRI

2a 15th St E (a) Magellan Dr 49th Ave E reconstruct two-lane roadway consistent with complete streets principles

Construction RRN/SHS HC RRI

2b 15th St E (b) Tallevast Rd Magellan Dr reconstruct two-lane roadway consistent with complete streets principles

Construction RRN HC RRI

2c 15th St E /301 Blvd (c) 49th Ave E US 41 (1st St) reconstruct two-lane roadway consistent with complete streets principles

Construction RRN HC RRI

3 ATMS Communication and Devices Expansion

State and County signalized road corridors Countywide.

Deploy fiber optic cable (FOC), closed circuit television (CCTV) cameras, microwave vehicle detection system (MVDS) sensors, Bluetooth travel time measuring devices, Arterial Dynamic Message Signs (ADMS), and advance vehicle detection.

Construction RRN/SHS TSM&O ATMS

4 RTMC Networking Infrastructure

Regional Traffic Management Center and four hubs

-- Replace aging network and monitoring infrastructure.

Design RRN/SHS TSM&O ATMS

On behalf of Manatee County, we hereby recommend the following list of transportation projects, ranked by priority, for funding consideration by FDOT.

Project Limits

Page 2: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

2019 Manatee County Project Priorities Dec 18, 2018

Page 2 of 3

5 Traffic Signal Infrastructure Replacement

State, County, and municipal signalized intersections Countywide.

-- Replace outdated 100 megabit Managed Field Ethernet Switches (MFES) with gigabit MFES.

Design RRN/SHS TSM&O ATMS

6 9th St W SR 684 (Cortez Rd) 301 Blvd construct sidewalk on west side Design RRN HC TA

7 US 41 Bicycle Improvements

Edwards Dr 26th Ave W bike racks and route wayfinding signs

Design SHS HC MMEC

8 US 41 at Bayshore Gardens Pkwy

-- add separate westbound and southbound right turn lanes; construct intersection-related pedestrian improvements

Design SHS HC CMP/TA

9 US 41 Bus (14th St W) 39th Ave W 26th Ave W pedestrian crossings Design SHS HC TA10 53rd Ave W at 26th St W add separate northbound,

eastbound, and westbound right turn lanes

Design RRN HC CMP

11 SR 684 (Cortez Road) at 26th St W -- add separate northbound and southbound right turn lanes

Design SHS HC CMP

12 US 41 Complete Streets South County line Bowlees Creek lane elimination, medians, roundabout control

Design SHS HC MMEC

13 33rd Ave W BUS 41 (14th St W) east end construct sidewalk Design local HC TA

14 34th Ave W BUS 41 (14th St W) 9th St Ct W construct sidewalk Design local HC TA

15 53rd Ave W at US 41(14th St W)

-- add separate eastbound right turn lane

Design RRN HC TRIP

16 18th St W SR 684 (Cortez Rd) 38th Ave W construct sidewalk on east side Design local HC TA

17 US 301 41st Ave E 51st Ave E sidewalk Design SHS HC TA18 SR 684 (Cortez Rd) at 34th St W -- extend eastbound right turn lane Design SHS HC TRIP

19 SR 684 (Cortez Rd) at 75th St W -- add separate eastbound and westbound right turn lanes

Design SHS HC CIGP

20 US 301 at 30th Ave E -- construct separate eastbound right turn lane

Design SHS HC CMP

21 Entranceway Signs Countywide -- install entranceway signs on State highways crossing the County line

Design SHS HC ---

Page 3: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

2019 Manatee County Project Priorities Dec 18,2018

22 us 301 at 63rd Ave W -- reconstruct signalized intersection Design SHS HC CMP

with mast-arms and add &

uograde turn lanes 23 us 301 at Tallevast Rd -- reconstruct signalized intersection Design SHS HC CMP

with mast-arms and add &

unerade turn lanes 24 57th Avenue W at 26th St W -- add separate right turn lanes on Design RRN HC CMP

all approaches 25 Morgan Johnson Rd 13th Ave E south of SR 64 construct sidewalk on east side Design RRN HC TA

26 University Pkwy Lakewood Ranch Lorraine Road construct multi-use path Design RRN HC TA

Blvd 27 Ellenton-Gillette Rd 17th Street E Mendoza Rd sidewalk Design RRN HC TA

28 Rails with Trails (Willow- West of 1-75 US 301 (Parrish) multi-use trail along FPL railroad Design trail SUNT TA

Ellenton Trail)

This list serves as formal documentation for the adoption of 201.9 Manatee County Project Priorities approved by the Board of County

Commissioners on December 1.8, 201.8.

Priscilla Trace, Chairperson

ATTEST: MANATEE COUNTY CLE OF CIRCUIT COURT AND

TY C PTROLLER

Page3of3

Page 4: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

2019 MPO Project Priorities Schedule

Nov 9, 2018 Official Call for Projects

Dec 18,2018 Jurisdictions submit completed a

Jan 2019 Technical/Citizens Advisory Committees review draft priorities MPO staff present draft priorities to MPO Board

Feb 2019 Jurisdiction's Elected Officials rank to nontles Jurisdictions submit adopted project priority lists to MPO

Mar 2019 Technical/Citizen Advisory Committees MPO Board adopts Final Project Priorities MPO staff submit final approved list of priority projects to FDOT

Fall2019 FDOT prepares Draft Tentative Work Program Public Review of Draft Tentative Work Program

Winter/Spring 2020 FDOT transmits Tentative Work Program to Legislature Legislature acts on program during session Governor approves work program as part of final budget bill

July 1, 2020 Work Program is in effect (based in part on Dec 2018 priorities)

Page 5: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

December 18, 2018 - Regular Meeting Agenda Item #60

Subject 2019 Transportation Project Priorities Briefings Briefing Provided Upon Request Contact and/or Presenter Information

Clarke Davis, Transportation Planning Division Manager 941.708.7450 x7272 [email protected]

Action Requested Adopt table titled "2019 Manatee County Project Priorities" and authorize chair to sign it and staff to transmit it to the Sarasota-Manatee Metropolitan Planning Organization. Enabling/Regulating Authority Section 125.01, F.S., Powers and Duties, County Commission Section 339.175(6), F.S., Powers, Duties, and Responsibilities, MPO Background Discussion The purpose of this item is to request Board action on 2019 transportation project priorities and their rankings.  The Sarasota-Manatee Metropolitan Planning Organization (MPO) requests that each agency review and rank its project priorities prior to MPO Board adoption. This report provides the staff-recommended projects and their rankings for 2019.   In general, projects selected for funding from this list will appear in FY24 or FY25 of the Florida Department of Transportation’s (FDOT) five-year program approved by the legislature in 2020. Projects and Rankings The attached "2019 Manatee County Project Priorities" table lists proposed 2019 transportation project priorities for several funding programs available through the Metropolitan Planning Organization and State.  They are ranked in staff's recommended priority order.   At the top of the list, staff placed the County's highest priority major projects for DeSoto Bridge and 15th Street East reconstruction in three phases. These are followed by the projects from the Advanced Traffic Management System (ATMS) "set-aside" funding.   The balance is presented in order according to 2018 rank based on MPO project prioritization methods.  In 2018, the MPO Board adopted the priority methodology after MPO staff developed them in coordination with local governments and their Technical Advisory Committee representatives.   The methods were developed to

Manatee County Government Administrative CenterPatricia M. Glass Commission Chambers, First Floor

9:00 a.m. - December 18, 2018

AStonebeck
Approved in Open Session
AStonebeck
Typewritten Text
12/18/18
Page 6: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

provide consistency with Federal funding legislation.  While ranking adjustments can be made, the projects are theoretically presented in the order they are most likely to successfully compete for funding. Changes Since 2018 The 2019 list was developed using the 2018 list as a base.  The following changes are noted: Modifications

● 15th St E is shown in three phases, as opposed to a single project.  The change reflects the most likely way the project will be programmed.

● Willow-Ellenton Trail west limit is modified to be near I-75.  The previously included section west of I-75 is funded.

Deletes Except as noted, each is now funded by Manatee County.

● Generic CMNAA projects: Desoto Bridge as the County's only CMNAA project is listed separately. ● SR70 at Lorraine Rd intersection ● 60th Ave from US 301 to Factory Shops Blvd roadway ● US 301 at 15th St E intersection ● Florida Blvd from 26th St W to 34th St W sidewalk

Network and Funding Codes The table is presented in the MPO requested format and with their requested additional information.  These are the code abbreviations: Roadway Network Code (type of road) SHS State Highway System RRN Regional Roadway Network FDOT Funding Code (State/Federal fund category) BRP Bridge Replacement HC Highway Capacity (includes mobility projects, like sidewalks) TSM&O Transportation Systems Management and Operations LRTP Funding Code (MPO funding category) ATMS Advanced Traffic Management System CIGP County Incentive Grant Program CMP Congestion Management Process MMEC US 41 Multi-Modal Emphasis Corridor RRI Regional Roadway Improvement TA Transportation Alternatives TRIP Transportation Regional Incentive Program Looking Ahead County action on priorities is an important step in an approximate 18-month process.  Staff will submit the

Manatee County Government Administrative CenterPatricia M. Glass Commission Chambers, First Floor

9:00 a.m. - December 18, 2018

Page 7: 2019 Manatee County Project Priorities · -- Replace aging network and monitoring infrastructure. Design: RRN/SHS TSM&O ATMS: On behalf of Manatee County, we hereby recommend the

adopted priorities and project information forms on December 18, 2018.   MPO staff will work with the advisory committees and MPO Board through spring to prepare a final list.  FDOT staff will use the adopted priorities during the Fall 2018 project selection and program development process for a work program that will go into effect July 1, 2020, and the Transportation Improvement Program the MPO Board will adopt in Summer 2020. Recommendation Staff recommends Board adoption of the 2019 project priorities and their rankings as shown in the table. County Attorney Review Not Reviewed (No apparent legal issues) Explanation of Other Reviewing Attorney N/A Instructions to Board Records Please email a copy of the approved agenda item to Clarke Davis at [email protected]. Cost and Funds Source Account Number and Name N/A Amount and Frequency of Recurring Costs N/A Attachment:  2019 Manatee County Project Priorities.pdf