2018 CONTECH CALENDAR SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DECEMBER 2017 Here’s to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise!
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2018CONTECH CALENDAR
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
DECEMBER 2017
Here’s to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise!
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
The BNSF Railway Alliance Intermodal Facility (IMF) was in need of an expansion. The engineer of record worked directly with Contech to identify the best solution for the storm sewer systems that would be needed. Given the complexity of the site and the high fill in one particular area, two different storm sewer systems were specified.
JANUARY 2018
DECEMBER 2017SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
FEBRUARY 2018SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Paulding County, GeorgiaMULTI-PLATE® Single Radius Arch26’ span x 13’ rise x 185’ length
Installation Date: August 2016
An independent water supply was critically needed in Paulding County. Access to the new reservoir required the installation of an environmentally-friendly structure that could follow the alignment changes of the stream without impacting the waterway – saving both time and money. The County selected a 184’ long MULTI-PLATE structure as the best solution.
FEBRUARY 2018
JANUARY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
MARCH 2018SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Woodbridge, New JerseyJellyFish® Filter 12’ dia. units (6) & The Stormwater Management StormFilter® 8’x24’ vaults (3) to treat over 25 CF
Installation Date: September 2017
Arizona Beverage Company constructed a new filling facility in Woodbridge, New Jersey. Jellyfish and StormFilter treatment systems were chosen to meet 80% reduction of TSS due to their ability to treat high flows in a compact footprint. Moreover, their configuration flexibility allowed the engineer to eliminate unnecessary structures, thus reducing costs.
MARCH 2018
FEBRUARY 2018SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
APRIL 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Foley, AlabamaKeystone Retaining Wall Systems® with Stonegate® Country Manor - 3,642 SFBEBO® Precast Bridge System, Triple Cell20’ span x 9’-2” rise x 14’ length
Installation Date: Spring of 2017
Keystone’s segmental retaining wall system was employed to wrap concrete pillars rising from the arch footing to form 30-inch square columns and the headwalls for this triple cell BEBO® precast bridge. Keystone engineered the bridge wall design which provides both reinforcing structural support needed for the sandy soils, as well as a charming Old World appearance for the new park gateway.
APRIL 2018
MAY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
MARCH 2018SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Dallas, TexasDuroMaxx® SRPE Pipe with WC Joints Two runs of 134 LF of 96” dia.13,053 CF of volume storage
Installation Date: August 2017
The Dallas/Fort Worth (DFW) International Airport needed a cost-effective solution to properly store stormwater contaminated with deicing fluid prior to being treated as part of the aircraft hardstand ramp expansions. A DuroMaxx SRPE glycol storage tank was selected.
MAY 2018
APRIL 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
JUNE 2018SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Loudoun County, VirginiaCON/SPAN® O-Series®Triple Cell 65’ span x 13.5’ rise x 128’ length
Installation Date: Summer 2016
When access was needed for a new high-end development, a triple cell CON/SPANO-Series was selected in lieu of a conventional bridge. The prefabricated arch system choice resulted in faster installation time, substantial savings, and efficiently allowed critical fiber optic lines to remain untouched during the installation process.
JUNE 2018
MAY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
JULY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Gulfport, MississippiVortechs® Model 1522 (6) & Model 1421 (2)Contech Slotted Drain™ - 6,000 LF, variable height, 18” - 36” diameters
Installation Date: Summer 2016
The Port of Gulfport expansion brought challenges of additional rainfall to the site. The water had to be collected as well as treated before it was discharged into the Gulf of Mexico. The local engineer worked with Contech to design a solution which utilized Slotted Drain for collection and conveyance of the stormwater and Vortechs hydrodynamic separators to treat the stormwater before flowing into the Gulf of Mexico.
JULY 2018
JUNE 2018SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
AUGUST 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Lakehurst, New JerseySPR™ PE structural lining for 786 LF of48” dia. RCP & 703 LF of 54” dia. RCP
Installation Date: March 2014
During a routine inspection at the Lakehurst Naval Air Station, it was discovered that a number of reinforced concrete pipe (RCP) runs used to carry stormwater had deteriorated and were no longer hydraulically or structurally sufficient. The facilities engineer decided to reline the existing RCP with SPR™ PE through the manholes directly.
AUGUST 2018
JULY 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
SEPTEMBER 2018SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Charleston, IndianaSteadfast® Vehicular TrussKeystone® Style120’ span x 34’ width
Installation Date: March 2017
In order to improve the roadway conditions along Salem Noble Road and avoid the regular flooding that occurred at the Pleasant Run crossing, Clark County chose a 120’ clear span Steadfast truss structure as the replacement. The new bridge can accommodate the rapid growth in the area and increased traffic volume.
SEPTEMBER 2018
AUGUST 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
OCTOBER 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
A detention system was needed that would have minimal impact to the breathtaking mountains that provide the unequaled acoustics for which the 640 acre Red Rocks open air amphitheater is famous. The solution? A stormwater system consisting of a CMP detention system pretreated with a CDS hydrodynamic separator, to meet water quality and quantity requirements.
OCTOBER 2018
SEPTEMBER 2018SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
NOVEMBER 2018SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Boardman, MichiganArmorFlex® Articulating Concrete Blocks 11,068 sq. ft. of ArmorFlex Class 40T
Installation Date: July 2017
When fully implemented, the Boardman Dam Removal & River Restoration Project will reconnect over 160 miles of river and tributary streams while restoring wetlands and upland habitats. It is the most comprehensive dam removal and restoration projects in Michigan’s history and one of the largest such projects in the Great Lakes Basin. Contech provided ArmorFlex erosion control mats as an advanced protective measure during the drawdown stages of the Boardman Dam.
NOVEMBER 2018
OCTOBER 2018SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
DECEMBER 2018SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29
w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
Twenty Filterra Bioscape vaults were installed upstream of infiltration to meet stormwater requirements in a large subdivision in Carlsbad, CA. The original design utilized large ponds that took up the entire green spaces making them unusable for other purposes. The Filterra vaults have a much smaller footprint, blend well with the other landscaping, and increase the property values of the homes closest to the green spaces.