Delivering innovative technology. 3 year performance report 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Decking A Technology Partnerships Project Jerome S. O’Connor, P. E.
9

2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Jul 05, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

3 year performance report 2015 Update to AASHTO SCOBS T-8 on

Composite Bridge Decking

A Technology Partnerships Project

Jerome S. O’Connor, P. E.

Page 2: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

3 winters

Page 3: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

Unique Features

1. Non-proprietary

2. Solid Surface

3. Reliable wearing surface

4. Light

5. No corrosion, fatigue

Page 4: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

d=4 ½”

Deck

Tube

Panel depth = 5 3/8”

Page 5: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

Cross Slope & Haunch

Page 6: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

Installation

Page 7: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

Railing

Field Joints

Page 8: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

2012 Installation

Page 9: 2015 Update to AASHTO SCOBS T-8 on Composite Bridge Deckingsp.bridges.transportation.org/Documents/2015 SCOBS... · 2015-05-27 · Delivering innovative technology. 3 year performance

Delivering innovative technology.

Pro’s & Cons

Pos Neg

Installation • 2 days + • widening

• Difficult overhead drilling

• 12 panels (fewer is better)

Performance • <25 psf → elim. posting

• Watertight • Reliable

wearing surface

• Internal debond • Cracks at joints

Notes:

1.A webinar is planned by FHWA on performance report.

2.FHWA has funds for applications.