Top Banner
ITE SoCal/San Diego Joint Meeting March 23, 2012 Active Transportation in the San Diego Region: SANDAG Policies, Programs, and Tools
17

2012.03.23.Sandag Bike Ped

Mar 08, 2016

Download

Documents

San Diego ITE

ITE SoCal/San Diego Joint Meeting March 23, 2012 SANDAG Policies, Programs, and Tools Poway Coronado Orange County Oceanside Escondido San Diego County of San Diego Santee Riverside County Imperial Beach Imperial County Chula Vista National City Vista San Diego 2 • Regional Comprehensive Plan • Regional Transportation Plan and Sustainable Communities Strategy • TransNet Routine Accommodation • Regional Bike Plan 3 4 Network 5 Network 6 Network 7 •Class III –Bike Route •33 miles new 8
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 2012.03.23.Sandag Bike Ped

ITE SoCal/San Diego Joint MeetingMarch 23, 2012

Active Transportation in the San Diego Region:SANDAG Policies, Programs, and Tools

Page 2: 2012.03.23.Sandag Bike Ped

2

San Diego Jurisdictions

Oceanside

Carlsbad

EncinitasSolana Beach

Del Mar

San Diego

Coronado

Imperial BeachChula Vista

National CityLemon Grove

La Mesa El Cajon

Santee

Poway

EscondidoSanMarcos

Vista

County of San Diego

San Diego

Riverside County

Imperial County

MEXICO

PACIFIC OCEAN

Orange County

Page 3: 2012.03.23.Sandag Bike Ped

3

Policies• Regional Comprehensive Plan• Regional Transportation Plan and Sustainable

Communities Strategy• TransNet Routine Accommodation• Regional Bike Plan

Page 4: 2012.03.23.Sandag Bike Ped

4

Page 5: 2012.03.23.Sandag Bike Ped

5

Network

• 515 miles total

• 281 miles new facility

• $419 million

Page 6: 2012.03.23.Sandag Bike Ped

6

Network

• Class I – Bike/Shared Use Path• 228 miles total• 151 miles new

Page 7: 2012.03.23.Sandag Bike Ped

7

Network

• Class II – Bike Lane• 212 miles total• 55 miles new

Page 8: 2012.03.23.Sandag Bike Ped

8

Network

• Class III – Bike Route• 33 miles new

Page 9: 2012.03.23.Sandag Bike Ped

9

Network

• Bicycle Boulevard• 34 miles new

Page 10: 2012.03.23.Sandag Bike Ped

10

Network

• Cycle Track• 8 miles new

Page 11: 2012.03.23.Sandag Bike Ped

11

Regional Bike Plan Programs

• Data collection• Safe Routes to Transit• Bicycle Parking• Education and awareness

Page 12: 2012.03.23.Sandag Bike Ped

12

Funding Programs• Active Transportation Grant Program

• TransNet Smart Growth Incentive Program

Page 13: 2012.03.23.Sandag Bike Ped

Funding Summary

13

TDA/TransNet $12.9M Transportation Enhancement $ 4.2MTotal Revenues $17.1M

Proposed Projects ($6.5M)Proposed Programs ($1.7M)

FY 2011 - 2012 Local Call for Projects $8.8M

Page 14: 2012.03.23.Sandag Bike Ped

14

Data and Evaluation• Modeling

• Counts

• Infrastructure Inventories

• Surveys

• Program evaluation

Page 15: 2012.03.23.Sandag Bike Ped

15

Safe Routes to Transit Regional Plan• RTP/SCS Action

• Assessment

• Prioritization

• Recommendations

• Implementation

Page 16: 2012.03.23.Sandag Bike Ped

16

Links• San Diego Regional Bicycle Plan

– www.sandag.org/bicycle

• San Diego Regional Bicycle Plan Implementation– www.sandag.org – Board of Directors – April 22, 2011

• 2050 Regional Transportation Plan and Sustainable Communities Strategy– www.sandag.org/rtp

• Active Transportation Grant Program– www.sandag.org/active

Page 17: 2012.03.23.Sandag Bike Ped

Christine Eary, Associate [email protected](619) 699-6928

Active Transportation in the San Diego Region:SANDAG Policies, Programs, and Tools