Proposal for Roosevelt Way NE
Presented to Maple Leaf Community Council,Executive Committee
June 20, 2012
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
2/21
Location
Roosevelt Way NE
2012 Proposal
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
3/21
Background
Open house summer, 2010
Community concerns between 75-85
Bike lanes installed south of 75th andnorth of 85th
75th to 85th delayed for additionalstudy
Roosevelt Way NE
2012 Proposal
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
4/21
Bicycle Routes
Roosevelt Way NE
2012 Proposal
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
5/21
Additional Analysis
Signal level of service
In-lane stops
Seasonal parking variation
Bicycle volume
Speed
Historic traffic volume
Roosevelt Way NE
2012 Proposal
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
6/21
Signal Analysis Roosevelt & 80th
Roosevelt Way NE
2012 Proposal
41 / 54 524 / 448 53 / 57
AM Peak / PM PeakSouthbound
20 / 25 151 / 433 13 / 14
AM Peak / PM PeakNorthbound
Traffic Signal Level of Service Unchanged
MLCC Comment: Data collected May 24, 2011
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
7/21
Signal Analysis Roosevelt & 75th
Roosevelt Way NE
2012 Proposal
114 / 93 432 / 355 95 / 111
AM Peak / PM PeakSouthbound
Traffic Signal Level of Service Unchanged
MLCC Comment: Data collected May 31, 2011
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
8/21
Speeds
Speed limit is 30 mph
85th percentile speed:
30.6 mph northbound
31.5 mph southbound
Speeds higher north of NE 100th Street
Roosevelt Way NE
2012 Proposal
MLCC Comment: Data collected September 13-20, 2011
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
9/21
Collisions
46 collisions in 3 1/2 years 10 injury collisions (22%)
0 Fatalities
2 Cyclists
2 Pedestrians
7 parked cars
Roosevelt Way NE
2012 Proposal
Location of ped and bike collisions
MLCC Comment: Data period 12/1/2008 - 6/15/2012
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
10/21
Traffic Volumes 10,547 Weekday Volume
Northbound PM Peak 804
Southbound AM Peak 1,006
Roosevelt Way NE
2012 Proposal
MLCC Comment: Data co ecte Septem er - ,
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
11/21
Bicycle Volume
Four-hour count = 71
Peak hour 7:30-8:30 = 22
Roosevelt Way NE
2012 Proposal
MLCC Comment: Data collected September 13-20, 2011. Study period not pre-announced.
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
12/21
Parking Capacity
Roosevelt Way NE
2012 Proposal
NE 78th to 75thTotal spaces 25
NE 82nd to 80th
Total spaces 22
NE 80th to 78th
Total spaces 17
NE 85th to 82nd
Total spaces 20
NE 77th to 75thTotal spaces 20
NE 78th to 77th
Total spaces 3
NE 79th to 78th
Total spaces 8
NE 80th to 79thTotal spaces 3
NE 81st to 80th
Total spaces 4
NE 82nd to 81st
Total spaces 8
NE 83rd
to 82nd
Total spaces 6
NE 84th to 83rd
Total spaces 6
NE 85th to 84th
Total spaces 3
West Side
61 spaces
East Side
84 spaces
MLCC Comment: Data collected May 2010, June 2010, September 2011, February 2012.
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
13/21
Peak Parking Utilization
Roosevelt Way NE
2012 Proposal
78th to 75th - 10/ 25
82nd to 80th - 6 / 22
80th to 78th - 8 / 17
85th to 82nd - 5 / 20
77th to 75th - 4 / 20
78th to 77th - 2 / 3
79th to 78th - 0 / 8
80th to 79th - 2 / 3
81st to 80th - 3 / 4
82nd to 81st - 2 / 8
83rd to 82nd - 2 / 6
84th to 83rd - 3 / 6
85th to 84th - 2 / 3West side East side
MLCC Comment: Data collected May 2010, June 2010, September 2011, February 2012.
ll d 2010 2010 b 2011 b 2012
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
14/21
Peak Seasonal Parking Utilization
Roosevelt Way NE
2012 Proposal
40%
27%
47%
10%
10%
67%
0%
67%
75%
25%
33%
50%
67%Summer Winter 33%
25%
18%
33%
0%
25%
50%
67%
0%
33%
20%
12%
40%
MLCC Comment: Data collected May 2010, June 2010, September 2011, February 2012.
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
15/21
Parking Availability - After
Roosevelt Way NE
2012 Proposal
78th to 75th
4 available
82nd to 80th
8 available
80th to 78th
2 available
85th to 82nd8 available
77th to 75th - 4
78th to 77th - 2
79th to 78th - 0
80th to 79th - 2
81st to 80th - 3
82nd to 81st - 2
83rd to 82nd - 2
84th to 83rd - 3
85th to 84th - 2West side peak demand East side spaces availableafter consolidation
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
16/21
Vehicle Access
Roosevelt Way NE
2012 Proposal
Alleys
Driveways
On-street parking
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
17/21
Revised Proposal Summary
Roosevelt Way NE
2012 Proposal
MLCC Comment: Complete the bike lane on east side of Roosevelt (see next page)
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
18/21
Benefits
Reduces conflict
Wider lane
Fewer collisions
Completes bicycle network
Improves bicycle access
Roosevelt Way NE
2012 Proposal
MLCC Comment: Complete the bike lane on east side of Roosevelt (see next page)
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
19/21
MLCC underst anding of t he proposal
5 parking spaces removed east side of Roosevelt Way NE just
north of the signal at NE 75th.
5 parking spaces removed on east side of Roosevelt to the south
of intersection at 80th
3 arkin s aces removed on the east side of Roosevelt to the
north of intersection at 80th.
All parking removed west side of Roosevelt from 75th
to 85th
. - .
Retains turning lanes so no worsening of 75th/80th intersections
8-foot wide parking area at curbs (versus 7-foot standard)
6-foot bike lane width (versus 5-foot standard) on east (uphill,northbound) side, sharrows on the west side
Retained arkin enou h to handle maximum arkin seen
during surveys, though on-street availability shifts across
street.
MLCC Comment: Will also be at the 2012 Summer Social, July 25.
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
20/21
Outreach Schedule
June 2012
Present draft plans to Maple Leaf Community Council
August 2012
Project Open House
September 2012
Final Design
Changes implemented in September, 2012
Roosevelt Way NE
2012 Proposal
y
7/31/2019 2012-06-19 SDOT Roosevelt Bike Lane 2
21/21
COMMENTS ON PROPOSAL
For Maple Leaf Community Council
For the Seattle Department of Transportation:
Brian.Dou hert @Seattle. ov
Please send any comments to BOTH email addresses.