- 1. 2010 FIFA Soccer World Cup: Durban, KZN: Business Plan Dr.
Michael Sutcliffe-City Manager : EThekwini Ms. Julie-May Ellingson-
Head :Strategic Projects and 2010 Programme, EThekwini
2. Background
- Province and city adopted a 2010 and beyond strategy which will
ensure we take full advantage of 2010 FIFA World Cup to firmly
establish ourselves as Africas premier sporting, conference and
tourism centre.
- KZN Provincial government is focused in particular on areas
such as sports development, economic development opportunities,
tourism, arts, culture.
- Host cities responsible primarily for delivery of the necessary
infrastructure including transport, ICT, bulk services as well as
marketing issues in the host cities
- Host stadia responsible for delivery of stadia and related
precinct infrastructure
- Legacy Infrastructure in EThekwini to include: New Stadium and
Kings Park Sports Precinct developments (High performance centre,
tennis, Indoor centre, Station, Sports retail centre); Training
field upgrades, Dube Trade Port and King Shaka Airport; Major
Highways and Roadways; Public Transport; Tourism Infrastructure;
ICT development; Urban regeneration
- Durban, KZN is brand we are using for Host City
3. KINGS PARK SPORTS AND RECREATION DEVELOPMENT PLAN CONCEPT
SPATIAL PLAN 1. Cricket 2. Hotel/sports fields 3. Baseball/Softball
4. Hotel/sports accommodation 5. Peoples Park & u/g Parking
5/A.Potential Training Fields 6. Football/athletics 7. Proposed
railway station 8. Aquatics 9. Rugby 10.Athletics 11. Archery 12.
Cycling 13. High performance centre 14. Indoor sports centre 15.
Tennis 16. Equestrian 17A/B. Golf/trails 18. Canoeing 19. A1 Racing
PMG note: map not included, please email info@pmg.org.za 4. 1.King
Senzangakhona Stadium
- World class 70 000 Seater World Class stadium to host
semi-final.
- Capable of being expanded to accommodate future Olympics
- Multifunctional without compromising activity of football.
- Financially viable: maximising potential income streams while
minimising financial drain on city
- Best concept at the best price
- Bulk earthworks and piling procurement: Aug 06 Sep 06
- Principle building contract procurement: Aug 06 Nov 06
- Bulk earthworks and piling: Oct 06 Jan 07
- Main seating bowl structure: Nov 06 Mar 08
- Roof construction: Nov 06 Oct 08
- Wet trades, services and finishes: Jan 08 Nov 08
- External works: Jan 08 Nov 08
- Completion and handover: Sep 08 Dec 08
PMG note: graphics not included, please email info@pmg.org.za 5.
Stadium update
- Land assembly for underground parking underway
- Piling contracts being finalised
- Main Construction Contract at advanced stage
PMG note: graphics not included, please email info@pmg.org.za 6.
2.Stadium Precinct
- Peoples Park and Heros walk
- Pedestrianisation of Walter Gilbert Road
- Pedestrianised link NMR to Beach
- Sports Precinct Service Road
- Kings Park Railway Station
PMG note: graphics not included, please email info@pmg.org.za 7.
3. Transport
- Nkosi Albert Luthuli Public Transport Lanes
- Inner City Distribution System (People Mover)
- Warwick Junction Infrastructure
- King Shaka Airport Service Infrastructure
- Public Transport Call centre
- Western Freeway Rehabilitation
- Intelligent Transport Systems Traffic Management
- Road network CCTV Monitoring and Surveillance
- Non-Motorised Transport (pedestrian/
PMG note: map not included, please email info@pmg.org.za 8.
People Mover
- Begins in late 2006 with a bus based system, 16 hours a day,
fixed route, every 10 mins or so.
- Buses built and process underway to train drivers, ambassadors,
etc.
- Feasibility into Tram-based system completed and could
implement for 2010
PMG note: map not included, please email info@pmg.org.za 9.
Warwick Junction Infrastructure
- Highest number of number of road deaths/ accidents
- Opportunity to significantly improve face of public
transport
- Multi-modal transport and retail hub
PMG note: graphics not included, please email info@pmg.org.za
10. 4.Training Venues
- Process underway to identify which stadia will be upgraded as
legacy to host PSL-level games
PMG note: graphics not included, please email info@pmg.org.za
11. 5. Fan fests
- Success of EThekwinis Beach Parties held for major conferences
will be built upon
- Ideal opportunity from Blue Lagoon along beachfront to Country
Club Beach (area robust and for the most part serviced)
PMG note: graphics not included, please email info@pmg.org.za
12. 6.Support Infrastructure
PMG note: graphics not included, please email info@pmg.org.za
13. 7.ICT
- Have extensive Fibre Optic, Power and Wireless capacity
- Some public buildings already wireless. Being expanded.
- Fibre optic into stadium and ICC
- Stadia upgrades and Hot spots being worked on
- Possible site for International Broadcastcentre.Have had
regular international broadcasts from city
- ICT Strategy links into citys connectivity and accessibility
strategy
- eThekwini well ahead in terms of addressing bandwidth
needs
- Overall ICT Strategy is to leave a legacy of connectivity and
accessibility
PMG note: graphics not included, please email info@pmg.org.za
14. Possible International Broadcast Centre (IBC)
- Criteria for bidding to host IBC not yet provided
- Durban well placed to be IBC due to existing
infrastructure
- Decision will however depend on overall cost (incl. loss of
revenue from ICC)
PMG note: graphics not included, please email info@pmg.org.za
15. 8.Accommodation
- Over 20 hotels within 5 kilometres of ground
- < 10 minutes from stadium over 8000 beds (3-5 star)