Top Banner
2010 FIFA Soccer World Cup: Durban, KZN: Business Plan Dr. Michael Sutcliffe - City Manager : EThekwini Ms. Julie-May Ellingson - Head : Strategic Projects and 2010 Programme, EThekwini
26

2010 fifa soccer world cup business plan

Jan 15, 2015

Download

Business

Wu Nengyong

2010 fifa soccer world cup business plan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 1. 2010 FIFA Soccer World Cup: Durban, KZN: Business Plan Dr. Michael Sutcliffe-City Manager : EThekwini Ms. Julie-May Ellingson- Head :Strategic Projects and 2010 Programme, EThekwini

2. Background

  • Province and city adopted a 2010 and beyond strategy which will ensure we take full advantage of 2010 FIFA World Cup to firmly establish ourselves as Africas premier sporting, conference and tourism centre.
  • KZN Provincial government is focused in particular on areas such as sports development, economic development opportunities, tourism, arts, culture.
  • Host cities responsible primarily for delivery of the necessary infrastructure including transport, ICT, bulk services as well as marketing issues in the host cities
  • Host stadia responsible for delivery of stadia and related precinct infrastructure
  • Legacy Infrastructure in EThekwini to include: New Stadium and Kings Park Sports Precinct developments (High performance centre, tennis, Indoor centre, Station, Sports retail centre); Training field upgrades, Dube Trade Port and King Shaka Airport; Major Highways and Roadways; Public Transport; Tourism Infrastructure; ICT development; Urban regeneration
  • Durban, KZN is brand we are using for Host City

3. KINGS PARK SPORTS AND RECREATION DEVELOPMENT PLAN CONCEPT SPATIAL PLAN 1. Cricket 2. Hotel/sports fields 3. Baseball/Softball 4. Hotel/sports accommodation 5. Peoples Park & u/g Parking 5/A.Potential Training Fields 6. Football/athletics 7. Proposed railway station 8. Aquatics 9. Rugby 10.Athletics 11. Archery 12. Cycling 13. High performance centre 14. Indoor sports centre 15. Tennis 16. Equestrian 17A/B. Golf/trails 18. Canoeing 19. A1 Racing PMG note: map not included, please email info@pmg.org.za 4. 1.King Senzangakhona Stadium

  • World class 70 000 Seater World Class stadium to host semi-final.
  • Capable of being expanded to accommodate future Olympics
  • Multifunctional without compromising activity of football.
  • Financially viable: maximising potential income streams while minimising financial drain on city
  • Best concept at the best price
  • Bulk earthworks and piling procurement: Aug 06 Sep 06
  • Principle building contract procurement: Aug 06 Nov 06
  • Bulk earthworks and piling: Oct 06 Jan 07
  • Main seating bowl structure: Nov 06 Mar 08
  • Roof construction: Nov 06 Oct 08
  • Pitch: Jul 08 Oct 08
  • Wet trades, services and finishes: Jan 08 Nov 08
  • External works: Jan 08 Nov 08
  • Completion and handover: Sep 08 Dec 08

PMG note: graphics not included, please email info@pmg.org.za 5. Stadium update

  • Ahead of schedule
  • Old Stadium demolished
  • Land assembly for underground parking underway
  • Piling contracts being finalised
  • Main Construction Contract at advanced stage

PMG note: graphics not included, please email info@pmg.org.za 6. 2.Stadium Precinct

  • Peoples Park and Heros walk
  • Underground Parking
  • Pedestrianisation of Walter Gilbert Road
  • Imbizo Place
  • Pedestrianised link NMR to Beach
  • Resurfacing NMR Road
  • FIFA Precinct Costs
  • Road Improvements
  • Sports Precinct Service Road
  • Kings Park Railway Station

PMG note: graphics not included, please email info@pmg.org.za 7. 3. Transport

  • Nkosi Albert Luthuli Public Transport Lanes
  • Inner City Distribution System (People Mover)
  • Warwick Junction Infrastructure
  • Park and Ride
  • King Shaka Airport Service Infrastructure
  • Public Transport Call centre
  • Western Freeway Rehabilitation
  • Intelligent Transport Systems Traffic Management
  • Road network CCTV Monitoring and Surveillance
  • Area Traffic Control
  • Non-Motorised Transport (pedestrian/
  • cycle paths)

PMG note: map not included, please email info@pmg.org.za 8. People Mover

  • Begins in late 2006 with a bus based system, 16 hours a day, fixed route, every 10 mins or so.
  • Buses built and process underway to train drivers, ambassadors, etc.
  • Feasibility into Tram-based system completed and could implement for 2010

PMG note: map not included, please email info@pmg.org.za 9. Warwick Junction Infrastructure

  • Gateway into city
  • Highest number of number of road deaths/ accidents
  • Opportunity to significantly improve face of public transport
  • Multi-modal transport and retail hub

PMG note: graphics not included, please email info@pmg.org.za 10. 4.Training Venues

  • Process underway to identify which stadia will be upgraded as legacy to host PSL-level games
  • Suggested stadia:
    • SJ Smith Stadium
    • Chatsworth Stadium
    • Sugar Ray Xulu Stadium
    • King Zwelithini Stadium
    • Princess Magogo Stadium

PMG note: graphics not included, please email info@pmg.org.za 11. 5. Fan fests

  • Success of EThekwinis Beach Parties held for major conferences will be built upon
  • Ideal opportunity from Blue Lagoon along beachfront to Country Club Beach (area robust and for the most part serviced)

PMG note: graphics not included, please email info@pmg.org.za 12. 6.Support Infrastructure

  • Increasing bulks
    • Water
    • Electricity
    • Sewers
    • Etc.

PMG note: graphics not included, please email info@pmg.org.za 13. 7.ICT

  • Have extensive Fibre Optic, Power and Wireless capacity
  • Some public buildings already wireless. Being expanded.
  • Fibre optic into stadium and ICC
  • Stadia upgrades and Hot spots being worked on
  • MOUs with TELKOM, SITA
  • Possible site for International Broadcastcentre.Have had regular international broadcasts from city
  • ICT Strategy links into citys connectivity and accessibility strategy
  • eThekwini well ahead in terms of addressing bandwidth needs
  • Overall ICT Strategy is to leave a legacy of connectivity and accessibility

PMG note: graphics not included, please email info@pmg.org.za 14. Possible International Broadcast Centre (IBC)

  • Criteria for bidding to host IBC not yet provided
  • Durban well placed to be IBC due to existing infrastructure
  • Decision will however depend on overall cost (incl. loss of revenue from ICC)

PMG note: graphics not included, please email info@pmg.org.za 15. 8.Accommodation

  • Over 20 hotels within 5 kilometres of ground
  • < 10 minutes from stadium over 8000 beds (3-5 star)