The CommissioningProcess to Meet theLEED Requirements
Presented by Mel JamesCFMS Consulting Inc.
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
2/56
Purpose of LEED
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
3/56
LEED Requirements Identify:
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
4/56
Elective vs Mandatory Credits
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
5/56
Indoor Environmental Quality
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
6/56
Credit1 Carbon Monoxide Monitoring
2 Ventilation Effectiveness
3 Construction IAO Management Plan
4 Low-Emitting Materials
5 Indoor Chemical and Pollutant Control
6 Thermal Comfort7 Controllability of Systems
8 Daylight and Views
Indoor Environmental Quality
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
7/56
Energy and Atmosphere (EA)
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
8/56
Credit Points1 Optimum Energy Performance 1-10
2 Renewable Energy 1
2.1 Renewable Energy 1
2.2 Renewable Energy 1
3 Best Practice Commissioning 1
4 Ozone Protection 15 Measurement and Verification 1
6 Green Power 1
Energy and Atmosphere Credits
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
9/56
Benefits of Commissioning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
10/56
Benefits of Commissioning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
11/56
Well-trained building operators to maintain thedesign intent performance of the building systems
A smoother turnover from construction to occupancy
Better control of the construction schedule
Better control of construction costs
Benefits of Commissioning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
12/56
Better maintenance and operating procedures
Better protection of the equipment life expectancy
Confirmation of the energy efficiency of thebuilding systems
Benefits of Commissioning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
13/56
The Commissioning Authority
Engaged early in thedesign process
Must have
commissioningexperience
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
14/56
Commissioning Authority Experience
HVAC design
HVAC inspection
Building Control systems design and commissioning
Mechanical & Electrical systems commissioningBuilding systems operation and maintenance
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
15/56
Fundamental Commission
The owner
The design team that is not directlyinvolved with the project
Independent commissioningauthority
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
16/56
Independent commissioningauthority
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
17/56
The Commissioning Process
Design Stage
Construction Stage
Performance Testing Stage
Training and Documentation Stage
Acceptance Stage
Post-Construction Stage
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
18/56
The Design Stage
Building Owner Design Intent
Consultants Design DevelopmentDesign Brief
CommissioningAuthority
Documentation
ReviewCommissioning PlanCommissioning Spec
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
19/56
The Construction Stage:
Planning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
20/56
Planning
Testing form for each test specifiedAssemble testing forms manual
Who conducts? Required equipment Co-ordinate with trades Witnesses
Identify requirements
Scheduling of tests
Review shop drawings
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
21/56
The Construction Stage:
Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
22/56
Testing
Plan
Co-ordinate
Schedule
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
23/56
Mechanical
Drainage systemPiping Pressure tests
Ductwork Pressure tests
Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
24/56
ElectricalFactory testsCable testsSwitchboard testsPanel Board tests
Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
25/56
The Construction Stage:
Equipment Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
26/56
Equipment Testing
Mechanical Equipment Start-ups
FansPumps
Terminal EquipmentLarge Equipment
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
27/56
Equipment Testing
Electrical
Diesel GeneratorsATSUPS
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
28/56
The Construction Stage:
Systems Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
29/56
Systems
Building AutomationFire AlarmLightingSecurityEmergency Power
Systems Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
30/56
Testing Procedure
Hardware
Software
Systems Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
31/56
Manufacturers Certificate
Acceptance Procedures
Systems Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
32/56
The Construction Stage:
Air & WaterBalancing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
33/56
Balancing Contractor will:
Air & Water Testing
Provide a
balancingplan
Review theInstallation
Witness the
ContractorTests
ConductBalancing
Assist the
CommissioningConsultant duringPerformance testing
GenerateReports
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
34/56
The Construction Stage:
Performance Testing
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
35/56
Performance Testing
Conducted by the Commissioning Team
Led by Commissioning Authority
Design Team Contractors Manufacturers
Supported by:
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
36/56
Performance Testing
Prepares performance testprocedures
Documents results and compareswith design intent
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
37/56
The Construction Stage:
Design TeamReview
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
38/56
Design Team Review
Conduct final review after contractors final
check out and performance tests have beencompleted
Prepare final deficiency list
Achieve substantial completion
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
39/56
The Construction Stage:
Documentation
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
40/56
Documentation
O & M Manuals
As-Built Documentation
Systems Operating Manual
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
41/56
The Construction Stage:
Training
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
42/56
Training
Classroom and system sessions
O & M manuals available at each session
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
43/56
Each session covers:
System DesignOperationMaintenanceTrouble-shooting
Training
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
44/56
Record each session
Review the design intent
Review the building operation
Training
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
45/56
The Construction Stage:
Acceptance
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
46/56
Acceptance
As-builtdrawings andshop drawings
O & Mmanuals
Completetestingmanual
All certificates WarrantycertificatesTraining
completed
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
47/56
Post-Construction Commissioning
Performance Testing duringthe opposite season
SeasonalCommissioning
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
48/56
Post-Construction Commissioning
Occupant complaint process Warranty repair process Additional training
Building Operational Plan
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
49/56
Post-Construction Commissioning
Design intent performance Operating performance
Warranty Period Review
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
50/56
LEED
Assemble owners design intent
Review the basis of design
Prepare a commissioning plan
Incorporate plan into constructiondocumentation
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
51/56
LEED
Verify testing process conducted by thecontractor
Conduct functional performance tests
Review O & M manuals
Complete commissioning reports
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
52/56
LEED
Peer review of the schematic design
Peer review of the construction documents
Review of the contractor submittals
Systems operating manualPost-occupancy plan
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
53/56
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
54/56
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
55/56
8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements
56/56