    The CommissioningProcess to Meet theLEED Requirements

    Presented by Mel JamesCFMS Consulting Inc.

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    2/56

    Purpose of LEED

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    3/56

    LEED Requirements Identify:

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    4/56

    Elective vs Mandatory Credits

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    5/56

    Indoor Environmental Quality

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    6/56

    Credit1 Carbon Monoxide Monitoring

    2 Ventilation Effectiveness

    3 Construction IAO Management Plan

    4 Low-Emitting Materials

    5 Indoor Chemical and Pollutant Control

    6 Thermal Comfort7 Controllability of Systems

    8 Daylight and Views

    Indoor Environmental Quality

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    7/56

    Energy and Atmosphere (EA)

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    8/56

    Credit Points1 Optimum Energy Performance 1-10

    2 Renewable Energy 1

    2.1 Renewable Energy 1

    2.2 Renewable Energy 1

    3 Best Practice Commissioning 1

    4 Ozone Protection 15 Measurement and Verification 1

    6 Green Power 1

    Energy and Atmosphere Credits

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    9/56

    Benefits of Commissioning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    10/56

    Benefits of Commissioning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    11/56

    Well-trained building operators to maintain thedesign intent performance of the building systems

    A smoother turnover from construction to occupancy

    Better control of the construction schedule

    Better control of construction costs

    Benefits of Commissioning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    12/56

    Better maintenance and operating procedures

    Better protection of the equipment life expectancy

    Confirmation of the energy efficiency of thebuilding systems

    Benefits of Commissioning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    13/56

    The Commissioning Authority

    Engaged early in thedesign process

    Must have

    commissioningexperience

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    14/56

    Commissioning Authority Experience

    HVAC design

    HVAC inspection

    Building Control systems design and commissioning

    Mechanical & Electrical systems commissioningBuilding systems operation and maintenance

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    15/56

    Fundamental Commission

    The owner

    The design team that is not directlyinvolved with the project

    Independent commissioningauthority

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    16/56

    Independent commissioningauthority

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    17/56

    The Commissioning Process

    Design Stage

    Construction Stage

    Performance Testing Stage

    Training and Documentation Stage

    Acceptance Stage

    Post-Construction Stage

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    18/56

    The Design Stage

    Building Owner Design Intent

    Consultants Design DevelopmentDesign Brief

    CommissioningAuthority

    Documentation

    ReviewCommissioning PlanCommissioning Spec

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    19/56

    The Construction Stage:

    Planning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    20/56

    Planning

    Testing form for each test specifiedAssemble testing forms manual

    Who conducts? Required equipment Co-ordinate with trades Witnesses

    Identify requirements

    Scheduling of tests

    Review shop drawings

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    21/56

    The Construction Stage:

    Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    22/56

    Testing

    Plan

    Co-ordinate

    Schedule

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    23/56

    Mechanical

    Drainage systemPiping Pressure tests

    Ductwork Pressure tests

    Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    24/56

    ElectricalFactory testsCable testsSwitchboard testsPanel Board tests

    Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    25/56

    The Construction Stage:

    Equipment Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    26/56

    Equipment Testing

    Mechanical Equipment Start-ups

    FansPumps

    Terminal EquipmentLarge Equipment

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    27/56

    Equipment Testing

    Electrical

    Diesel GeneratorsATSUPS

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    28/56

    The Construction Stage:

    Systems Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    29/56

    Systems

    Building AutomationFire AlarmLightingSecurityEmergency Power

    Systems Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    30/56

    Testing Procedure

    Hardware

    Software

    Systems Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    31/56

    Manufacturers Certificate

    Acceptance Procedures

    Systems Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    32/56

    The Construction Stage:

    Air & WaterBalancing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    33/56

    Balancing Contractor will:

    Air & Water Testing

    Provide a

    balancingplan

    Review theInstallation

    Witness the

    ContractorTests

    ConductBalancing

    Assist the

    CommissioningConsultant duringPerformance testing

    GenerateReports

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    34/56

    The Construction Stage:

    Performance Testing

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    35/56

    Performance Testing

    Conducted by the Commissioning Team

    Led by Commissioning Authority

    Design Team Contractors Manufacturers

    Supported by:

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    36/56

    Performance Testing

    Prepares performance testprocedures

    Documents results and compareswith design intent

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    37/56

    The Construction Stage:

    Design TeamReview

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    38/56

    Design Team Review

    Conduct final review after contractors final

    check out and performance tests have beencompleted

    Prepare final deficiency list

    Achieve substantial completion

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    39/56

    The Construction Stage:

    Documentation

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    40/56

    Documentation

    O & M Manuals

    As-Built Documentation

    Systems Operating Manual

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    41/56

    The Construction Stage:

    Training

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    42/56

    Training

    Classroom and system sessions

    O & M manuals available at each session

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    43/56

    Each session covers:

    System DesignOperationMaintenanceTrouble-shooting

    Training

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    44/56

    Record each session

    Review the design intent

    Review the building operation

    Training

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    45/56

    The Construction Stage:

    Acceptance

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    46/56

    Acceptance

    As-builtdrawings andshop drawings

    O & Mmanuals

    Completetestingmanual

    All certificates WarrantycertificatesTraining

    completed

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    47/56

    Post-Construction Commissioning

    Performance Testing duringthe opposite season

    SeasonalCommissioning

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    48/56

    Post-Construction Commissioning

    Occupant complaint process Warranty repair process Additional training

    Building Operational Plan

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    49/56

    Post-Construction Commissioning

    Design intent performance Operating performance

    Warranty Period Review

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    50/56

    LEED

    Assemble owners design intent

    Review the basis of design

    Prepare a commissioning plan

    Incorporate plan into constructiondocumentation

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    51/56

    LEED

    Verify testing process conducted by thecontractor

    Conduct functional performance tests

    Review O & M manuals

    Complete commissioning reports

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    52/56

    LEED

    Peer review of the schematic design

    Peer review of the construction documents

    Review of the contractor submittals

    Systems operating manualPost-occupancy plan

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    53/56

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    54/56

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    55/56

  • 8/3/2019 200810 Ashrae Cfms the Commissioning Process to Meet the Leed Requirements

    56/56