Top Banner
RBS 6000 Main Remote and Power Systems Installation Practical Exercises
4

16 Practical Exercises

Sep 26, 2015

Download

Documents

alentood5

16 Practical Exercises-6000
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Practical ExercisesSlide title minimum 48 pt Slide subtitle minimum 30 pt
RBS 6000 Main Remote and Power Systems Installation
Practical Exercises
RBS 6000 Main Remote and Power Systems Installation
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-X
Slide title minimum 32 pt (32 pt makes 2 rows Text and bullet level 1 minimum 24 pt Bullets level 2-5 minimum 20 pt !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿŒœŠšŸƒˆ˜–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥ ΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨαβγδεζηθικλνξορςΣΤΥΦΧΨΩ Do not add objects or text in the footer area
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-*
Course Agenda
RBS 6301/6302/6601 Technical Data
BBS 6301, PBC 6200 and PBC-05/BBS-05 Technical Data
Installation Safety Precautions and Tools
Site Installation Preparation
RBS 6301/6302/6601 Installation
RRU 01/11/61 Installation
RRU 02/12 Installation
Optical Interface Link Installation
Concluding Routines
Practical Exercises
RBS 6000 Main Remote and Power Systems Installation
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-X
Slide title minimum 32 pt (32 pt makes 2 rows Text and bullet level 1 minimum 24 pt Bullets level 2-5 minimum 20 pt !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿŒœŠšŸƒˆ˜–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥ ΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨαβγδεζηθικλνξορςΣΤΥΦΧΨΩ Do not add objects or text in the footer area
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-*
Practical Exercises
Divide the group and assign them specific work to be done. Work will depend on the availability of materials.
RBS 6301/6302 installers (installed on a pole, mast or wall or GBF)
Cabling installers (grounding, power, fiber optics, and transmission)
RRU installers
RRU cabling installers
Power cabinet installers
Show the finished installation to the instructor who will act as the quality assurance auditor. If time permits, installers need to correct the necessary quality issues.
Uninstall the RBS in preparation for the next class.
RBS 6000 Main Remote and Power Systems Installation
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-X
Slide title minimum 32 pt (32 pt makes 2 rows Text and bullet level 1 minimum 24 pt Bullets level 2-5 minimum 20 pt !"#$%&'()*+,-./0123456789:;<=>?@ABCDEFGHIJKLMNOPQRSTUVWXYZ[\]^_`abcdefghijklmnopqrstuvwxyz{|}~¡¢£¤¥¦§¨©ª«¬®¯°±²³´¶·¸¹º»¼½ÀÁÂÃÄÅÆÇÈËÌÍÎÏÐÑÒÓÔÕÖ×ØÙÚÛÜÝÞßàáâãäåæçèéêëìíîïðñòóôõö÷øùúûüýþÿŒœŠšŸƒˆ˜–—‘’‚“”„†‡•…‰‹›⁄€™−≤≥ ΑΒΓΕΖΗΘΙΚΛΜΝΞΟΠΡΣΤΥΦΧΨαβγδεζηθικλνξορςΣΤΥΦΧΨΩ Do not add objects or text in the footer area
© Ericsson AB 2013 | Practical Exercises | LZU 108 8684 R3A | Figure 16-*
RBS 6000 Main Remote and Power Systems Installation