    COMMISSIONING PACKAGE

    Pkg. No. 154-01

    Description: Noise n! "i#rtion Mes$re%ents

    DIS&'I()&ION:

    Original: Commissioning Site Team

    Copy

    Prepared by: Gary Rougeau Approved by:

    A.S. Class Society

    Name / ate: Name / ate

    Sign: Sign:

    *+,1+,014+Commissioning Template/Rev !.

    ,

  • 7/21/2019 154-01 Noise Verification

    2/24

    consu l t i nge n g i n e e r s

    ModuSpec

    *+,1+,014+Commissioning Template/Rev !.

  • 7/21/2019 154-01 Noise Verification

    3/24

    1

    SA"#T$ PR#R#%&'S'T#S S'GNAT&R#

    T(e )ollo*ing instructions must be read and understood by t(e Person in C(arge o)t(e +or,site -As de)ined in t(e Permit To +or, system. uring t(e precommissioning meeting0 (e must veri)y t(at all persons involved in t(ecommissioning (ave read and understand t(e procedure and t(e associated sa)etyitems.

    1

    T(e Person in C(arge must (ave a t(oroug( ,no*ledge o) t(e systembeing commissioned.2e must understand t(e steps re3uired in t(e sa)e start up and operationo) t(e e3uipment.') (e does not (ave t(e necessary ,no*ledge )or t(e sa)e start up andoperation o) t(e e3uipment0 t(en (e is to ensure su))icient e4pertise isavailable during t(e commissioning p(ase.

    5T(e 6endor documentation0 including precommissioning activities andcommissioning procedures s(all be read and understood by t(e Person inC(arge prior to issuing t(e notice o) commissioning.

    7

    T(e commissioning procedure must be read and understood in advanceo) t(e actual commissioning activities. ') t(e Person in C(arge does notunderstand or agree *it( any part o) t(e *ritten procedure0 (e mustdiscuss t(is *it( t(e procedure aut(or and come to a mutual agreementas to any modi)ications to be incorporated.Note: An %o!i/ictions %$st #e presente! to te Co%%issioningMnger /or is cceptnce prior to co%%encing n ctiities onte sste%.

    8T(e General +or, Permit -issued as part o) t(e Permit to +or, system0must be read and understood by all persons participating in t(ecommissioning activities.

    !

    As prt o/ te &ot2 S/et &sk Instr$ction 3&S&I t2k te Person inCrge %$st e6p2in te opertion o/ te sste% n! especi22 tessocite! s/et !eices.7e so$2! e goo! 2ee2 o/ con/i!ence o/ te co%petence o/ te

    personne2 ssigne! to te co%%issioning ctiities.

    9Commissioning s(ould not progress unless ade3uate communication isestablis(ed at all areas a))ected during t(e test.

    T(e Person in C(arge or a 3uali)ied associate0 must veri)y t(at t(ere areno integral sa)ety devices or systems *(ic( (ave been bypassed or madeinoperable by ot(er means0 prior to t(e start o) energi;ing.To ac(ieve t(is0 (e may need to c(ec, t(e

  • 7/21/2019 154-01 Noise Verification

    4/24

    1#

    SA"#T$ PR#R#%&'S'T#S S'GNAT&R#

    =

    #nsure t(at t(e latest copy o) t(e punc( list is included *it( t(e >&N-livening up notice. T(e Person in C(arge s(ould c(ec, t(is list )or items

    *(ic( could cause con)usion or may be a potential (a;ard. ') suc( items0in (is opinion0 e4ist0 it must be broug(t to t(e attention o) t(eCommissioning

  • 7/21/2019 154-01 Noise Verification

    5/24

    1

    escription:Noise n! "i#rtion

    "eri/ictionS"' Code: 154-01

  • 7/21/2019 154-01 Noise Verification

    6/24

    1!81 Noise n! "i#rtion Mes$re%ents

    COMMISSIONING P'OCED)'ES CON&EN&S

    1. S$ST#< #SCR'PT'ON AN TAG >'ST 8

    5. SCOP# O" +ORD 9

    7. R#"#R#NC#S "OR T2# S$ST#

  • 7/21/2019 154-01 Noise Verification

    7/24

    1!81 Noise n! "i#rtion Mes$re%ents 4

    1.0 S;S&EM DESC'IP&ION:

    &e /o22o9ing is #rie/ !escription o/ te e$ip%ent to #e co%%issione!. &esste% 2i%its /or tis proce!$re e #een pre-!e/ine! n! re so9n on te%rke! $p !r9ings in te ppen!i6 o/ tis !oc$%ent.

    NOISE AND "I('A&ION CON&'Oo* reverberation times s(all be ad(ered to.

    "or *or,s(ops0 laboratories0 control rooms0 radio room0 meeting rooms0 co))ee bars rest/T6rooms dining room and o))ices0 t(e average octave band sound absorption coe))icient s(allnot be less t(an .8 in t(e )re3uency range 5!2; to 5,2;.

    T(e partitions bet*een rooms s(all be designed in order to ac(ieve an ade3uate sound

    insulation.

  • 7/21/2019 154-01 Noise Verification

    11/24

    1!81 Noise n! "i#rtion Mes$re%ents >

    MIPS &AG

  • 7/21/2019 154-01 Noise Verification

    12/24

    1!81 Noise n! "i#rtion Mes$re%ents @

    't is t(e intention t(at t(e entire system0 as detailed in section 1. *ill beCommissioned.

    T(e scope o) t(e )inal commissioning o) t(is e3uipment *ill encompass testing and

    satis)actory veri)ication o) all applicable operational parameters in entirety to ensuret(at t(e e3uipment is )it )or purpose. T(ere)ore it is a precondition t(at all applicableau4iliary systems and ancillary e3uipment essential to t(e operation o)57?11771.doc be mec(anically complete and clear o) all A punc( items prior tocommencement o) )inal commissioning o) t(is item.

    Additionally0 t(e 6endors "AT E SAT results are to be available )or enclosure in t(eAppendi4 o) t(is document )or re)erence during )inal commissioning.

    *+,1+,014+Commissioning Template/Rev !.

  • 7/21/2019 154-01 Noise Verification

    13/24

    1!81 Noise n! "i#rtion Mes$re%ents 10

    .0 'E8E'ENCES 8O' &7E S;S&EM:C7ECK I8

    7.1 T(e mec(anical completion pac,age.

    7.1.1

  • 7/21/2019 154-01 Noise Verification

    14/24

    1!81 Noise n! "i#rtion Mes$re%ents 11

    =. PE'8O'MANCE AND ACCEP&ANCE &ES&ING DA&A "E'I8ICA&ION:C7ECK I8'E)I'ED

    9.1 General notes

    9.1.1 Read t(is entire test procedure prior to initiating t(e tests described (erea)ter.

    9.1.5 T(e test personnel *ill strictly ad(ere to all t(e sa)ety instructions andprecautions including0 but not limited to all Caution and +arning notes int(is test.

    9.1.7 All t(e e3uipment *ill be operated in accordance *it( t(e appropriateTec(nical ASS SOC'#T$.

    9.1. T(e parties mentioned in 9.1.9 must be in)ormed by email 58 (ours priorto t(e demonstration -i) )easible. C>ASS SOC'#T$ may re3uire *itnessto t(e sa)ety device testing.

    9.5 "ailures are to be processed as )ollo*s:

    9.5.1 Any )ailure0 unsatis)actory condition or situation re3uiring remedial action*ill be reported and recorded on a punc( list.

    9.5.5 A)ter corrective actions (ave been ta,en0 repeat t(e necessary -i) anysteps o) t(e test procedure and record t(e results.

    9.7 Commissioning met(od:

    9.7.1 General:

    9.7.1.1 Operate all manual valves t(roug( one complete cycle0 to ensureproper operation.

    9.7.5 Operational test and 2eat run

    C

  • 7/21/2019 154-01 Noise Verification

    15/24

    1!81 Noise n! "i#rtion Mes$re%ents 1,

    9.7.8 CO

  • 7/21/2019 154-01 Noise Verification

    16/24

    1!81 Noise n! "i#rtion Mes$re%ents 1

    9.7.! S$ST#< ACC#PTANC#

    S;S&EM ACCEP&ANCE

    S$ST#< N&$.T2# &N#RS'GN# AGR## T2AT NO "&RT2#R T#ST'NG 'S R#%&'R# ANT2# S$ST#< CAN F# TAD#N O6#R F$ OP#RAT'ONS

    +'TN#SS NA

  • 7/21/2019 154-01 Noise Verification

    17/24

    1!81 Noise n! "i#rtion Mes$re%ents 14

    . ATA S2##TS "OR T#ST #%&'P

  • 7/21/2019 154-01 Noise Verification

    18/24

    1!81 Noise n! "i#rtion Mes$re%ents 15

    = CO

  • 7/21/2019 154-01 Noise Verification

    19/24

    1!81 Noise n! "i#rtion Mes$re%ents 1=

    ?. CO

  • 7/21/2019 154-01 Noise Verification

    20/24

    1!81 Noise n! "i#rtion Mes$re%ents 1*

    1. 'NSTR&'FRAT'ON R#%&'R#

  • 7/21/2019 154-01 Noise Verification

    21/24

    1!81 Noise n! "i#rtion Mes$re%ents 1>

    11. APP#N'

    D'A?ING "ENDO' IN8O'MA&ION

    ocument Number ocument escription Pages Revision

    ANN# A +ORD'NG #N6'RON'

  • 7/21/2019 154-01 Noise Verification

    22/24

    1!81 Noise n! "i#rtion Mes$re%ents 1@

    'oo% Description %

    < 99 !

    Fattery Room & =!

    ocal ControlRoom

    ' 9 !

    'nst/#l. +or,s(op < 9!5 9 !

    aboratory '/< 9 !

    Paint S(op ' 9!9 !!

    Sac, Room ' 9!5 9 !!

    +or,s(op O))ice < !! !

    Crane Cabin < 9! 9

    rillerJs Cabin < 9! 9

    *+,1+,014+Commissioning Template/Rev !.

  • 7/21/2019 154-01 Noise Verification

    23/24

    1!81 Noise n! "i#rtion Mes$re%ents ,0

    'oo% Description

  • 7/21/2019 154-01 Noise Verification

    24/24

    1!81 Noise n! "i#rtion Mes$re%ents ,1

    'oo% Description %.

    !. "or mobile o))s(ore installations0 t(e noise re3uirement during operations is !dF-A (ig(ert(an t(e one given in table.

    9. "or crane cabins0 t(e re3uirement re)ers to t(e e3uivalent sound level to *(ic( t(e cranedriver is e4posed during a time period de)ined by a typical crane cycle -in Nor*ay c).e)inition given in NS 8=1!.