1.0/20/97 09:17 V•603 472 7052 NORMANDEAU. .[00-3.'016 OCT 17 '97 01:27PrM US ARrMr ENcri K VI±V DEPARTMEN-rOF THE ARMY NEW ENGLAND 0IVISION, COAPa OF ENGINEERS 424 TRAPELO FOAO Y.JALTHAM M MASSACHUSETTS 02 5 A 914V Re.gulatory Branch CENAE-CO-R-62 199702302 Mr. Thomas Oosterhout Vermont Yankee Nuclear Power Corporation ?.O."Box 157 Vernon, Vermont 05354 Dear Mr. Oosterhout: Enclosed are Two copies of a Department of the Army permit authorizing the work described therein. Your signature is necessary to e-.cule this perit. Ifthe conditions are acceptable, please sign both copies and retumr cne signed copy to us. A fee of S 100.00 is required. Please enclose a check made payable to "FAO New England Division", and return it with the signed permit copy. Please ensure your address and social security number, or tax identification number for businesses, are on the check. You must post the enclosed ENG forme 4336 (i.e., Notice of Authorization) in a conspicuous location at the job site whenever.work is ongoing. Also, this permit requires you to notify us before beginning work and dalow us to inspect the project. Hence, you must complete and return the atrached Work Start Noti.fication Form to this office no0 later than two weeks before the anticipated starning date. This permit is a limited authorization containing a specific set of conditions. Please read the permit thoroughly to familiarize yourself with those conditions, including any condilions cortained on the attached state water quality certification. Ira contractor does the work for you, borb you and the contractor are responsible for ensuring that the work is done in compliance vwith the permit's terms and conditions. The proposed work must be performed in compliance with all terms and conditions of the permit, as violations could result in civil or criminal penalties. $1JlgonIs AvqtQ'1.
14
Embed
1.0/20/97 09:17 V•603 472 7052 NORMANDEAU. .[00-3.'016 OCT … · 2012. 11. 21. · 1.0/20/97 09:17 v•603 472 7052 normandeau. .[00-3.'016 oct 17 '97 01:27prm us arrmr encri k
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1.0/20/97 09:17 V•603 472 7052 NORMANDEAU. .[00-3.'016OCT 17 '97 01:27PrM US ARrMr ENcri K VI±V
DEPARTMEN-rOF THE ARMYNEW ENGLAND 0IVISION, COAPa OF ENGINEERS
424 TRAPELO FOAOY.JALTHAM M MASSACHUSETTS 02 5 A 914V
Re.gulatory Branch
CENAE-CO-R-62
199702302
Mr. Thomas Oosterhout
Vermont Yankee Nuclear Power Corporation
?.O."Box 157Vernon, Vermont 05354
Dear Mr. Oosterhout:
Enclosed are Two copies of a Department of the Army permit authorizing the work
described therein.
Your signature is necessary to e-.cule this perit. Ifthe conditions are acceptable, please
sign both copies and retumr cne signed copy to us. A fee of S 100.00 is required. Please enclose a
check made payable to "FAO New England Division", and return it with the signed permit copy.
Please ensure your address and social security number, or tax identification number for
businesses, are on the check.
You must post the enclosed ENG forme 4336 (i.e., Notice of Authorization) in a
conspicuous location at the job site whenever.work is ongoing. Also, this permit requires you to
notify us before beginning work and dalow us to inspect the project. Hence, you must complete
and return the atrached Work Start Noti.fication Form to this office no0 later than two weeksbefore the anticipated starning date.
This permit is a limited authorization containing a specific set of conditions. Please read
the permit thoroughly to familiarize yourself with those conditions, including any condilions
cortained on the attached state water quality certification. Ira contractor does the work for you,borb you and the contractor are responsible for ensuring that the work is done in compliance vwiththe permit's terms and conditions.
The proposed work must be performed in compliance with all terms and conditions of the
permit, as violations could result in civil or criminal penalties.
If the plans or construction methods (i.e., for work in our jurisdiction) need to be changed,
please contact us immediately to discuss modification of your permit. Before changes may be
undertaken, they must be approved by this office.
Finally, please note that the Department of the Army permit process does not supersede
any other agency's jurisdiction. Hence, if other federal, state, and/or local agencies have
jutisdicton over your project, you must receive all applicable permits before you may begin
work.
If you have any questions regarding this correspondence, please contact Michael S.
Adams at 802 655-0334.
Sincerely,
Wifliam F. Lawless, P.E.Chief, Regulatory Branch
Construction-Operations Division
Enclosures
Copy furnished
"b&. James BajekNormandeau Associates, Inc.
25 Nashua RoadBedford, NH O3110-5500
Proj Mgr:
MAU: I
Sec Chf: 22t/ /r/n 7-
10/20/97 09:18 'Y603 472 7052 NORMANDEAU.. Q005'016OCT 17 '97 01:2SPM US ARMY ENGR REG DIV t.
DEPARTMENT OF THE ARMY PERMIT
PenVite V nt Yankee Nuclear Pc-e-_ Corporation
199702302Permit ,-No._-
Wuig Offe New England District
NOTE: Tme tarm "you" and It& donvatWiv. -usd in -this permit. mILu the permitte or any future tra..uterc). The tar-n
"this office" refers to the approprate district or division office or the Corps of Enginecr havin. ruxadictiot. over tha permittad
activity or the appropriata ofriciz of thlt office Acting under the authorit' of the cornmer.nding officer.
You are authorizad to perform, work in hccordance with L* taerms rand conditions specified bclow'.
Project Description:
Perform maintenance dredging in front of the intake structure at the Vermont Yankee Nuclear
Power Station.- The work will involve the hydraulic dredging of approximately 10,700 cy of
predominantly sandy material over a tlree year perod to a depth of elevation 190' (mean sea
level). The material wvill be pumped into upland containment sites on the property. The primary
site will be constructed on an upland field by construction of an earth berm and have a 9,800 cy
capacity. The water will be allowed xo pond to facilitate settling of particulates prior to
DESCRIPTION OF W1ORK CONTIN'UED ON PAGE 4.
Project Location:
Connecticut River, Vernon, Vermont
Permit CondItions:
0eneral CoditiorLs: 200
1. The time limit for completing the work %'U.'orized ends on 2 •ZIf you (ind that yo'4 nee4
more time to complete the authorized activity, submit your request for a ti.-ne extenilon to his office for consideration a, lea--one month before the above date is reached.'
2. You must inair.uin the '•tivity aUtho rized by this permit In good condItlon and in conformance with týl mtrms and ec.cdi-
Liors of this permit. You are not relieved of this getuirernent If you abandon the perited activity'.' atho•gh you may make
& good faith •'.r&Afcr to a third parzy In complianee with Generil Condition 4 below. Should you Wish to cease to me.!ir-tan
the auLhorized actilv'ity or ho'uld you dcre to abandort it without a good faith transfer, you must obwain a modiflca:ion cf
this permit from this office, which may require rescradton of tNe area.
3, It you di6coaer any previously unknown hmotrlc or archeolcgical rermrnhs while accomplisning the activity authorized -y
this pirmni, you mnat ImmoodltIoly notify this offles of 1rhat you have found. We wvlB Initiate the rederel and ,ta.e eo.--din.-
tion required to determine If the rema•ns warrant a recovery effort or if the siLt ts ei•gibe for listing in the Nationft7 Re"-eitar
or HWitodc Places.
ENO FORtM 1721, No- 88 EITION OF SE.P 2 IS ORSOt.ETE. (33 CF.R 325 (AppendfL- A)
b. The perraittee shall assure that a copy of th'is permit is at the work site'whenever work is
being performed and that all personnel performring work at the site of the work authorized by thispermi are fully aware of the terms and conditions of the permit. This permit, including its
drawings and any appendices and other attachments, shall be made a-par- of any and all contracts
and sub-contracts for work which affects areas of Corps of Entineers' jurisdiction at -he site of
the work authorized by this permit, This shall be done by includins the entire permit in the
specifications for the work. If the permit is issued after the construction specifications but
before receipt of bids or quotes, the entire permit shall be included as an addendum to the
specifications. If the permit is issued after receiptof bids or quo:es, the entire permit shall be
included in the contract or sub-contract as a change order. The term "entire permit" includes
permit amendments. Although the perrnnitee may assign various aspects of the work to differe't
contractors or sub-contractors, all contrac ors and sub;contractors shall be oblgated by contract
to comply with all en*virorr nental proiectiorn provisions ofthe entire permit, and no Conitract or
sub-contract shall require or allow'unauthorized work in areas of Corps of Engineers'jurisdiction.
c*. All-.dredged material shall be disposed of at an upland, non-wetland location.
d. Periodic maintenance dredging tothe area and depth limits described herein is authorized for
ten years from the date of issuance of this perrnit, provided disposal of the dredged material is at
an upland site. However, the permnitee must hotify this office, in writing, 60 days before the
intended date of any such dredging and shall not begin such dredging unti written authorization
has been obtained. A separate individual permit shall be required for such dredging if the material
to be dredged is to be deposited in open or ocean waters and/or wetlands.