1 SFPUC Tidal / Wave Power SFPUC Tidal / Wave Power Feasibility Studies Feasibility Studies PANC Presentation PANC Presentation July 08, 2007 July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden Gate SFPUC Wave Power Feasibility Study Ian Austin, PhD, PE Vice President, Marine Services Outline:
26

1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

Dec 18, 2015

Download

Documents

Hubert Norton
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

1

SFPUC Tidal / Wave Power SFPUC Tidal / Wave Power Feasibility StudiesFeasibility StudiesPANC PresentationPANC PresentationJuly 08, 2007July 08, 2007

A bit of history... SFPUC In-Stream Tidal Power

Feasibility Study at Golden Gate SFPUC Wave Power Feasibility Study

Ian Austin, PhD, PEVice President, Marine ServicesOutline:

Page 2: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

2

Wave power has arrived?Wave power has arrived?

“The possibilities of utilizing the forces of the sea’s waves will soon be manifest”

Adolph Sutro, 1887

Page 3: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

3

Wave power has arrived?Wave power has arrived?

A number of wave-power schemes near Cliff House:

1887 Sutro’s catch-basin, a wave overtopping scheme; said that extra head could drive water wheels

1887 Sterns’ wave motor on rocks near Cliff House – possibly a pump storage scheme – ended dramatically with the explosion of a grounded schooner

1891 Henry Holland’s wave motor; pump driven by an iron buoy - another pump storage scheme

Page 4: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

4

Wave power has arrived?Wave power has arrived?

Sutro Aquarium Wave Motor

Page 5: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

5

2007-2008: San Francisco PUC Studies2007-2008: San Francisco PUC Studies San Francisco has goal of generating at

least 10% of annual average power demand from renewables - about 60 MW

In-stream tidal power through the Golden Gate appeared to be a major resource

Wave power outside the Golden Gate is likely to be a much larger resource

Page 6: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

6

What is In-Stream Tidal Power?What is In-Stream Tidal Power?

A new technology intended to reduce costs and impacts associated with old barrage projects

Emerging technology, only 1 unit installed world-wide rated at more than 1 MW (MCT Strangford Narrows, Ireland)

UK has been technology leader; government subsidies and tidal/wave power test sites in Scotland, Cornwall and Ireland

In-stream tidal energy proportional to velocity cubed:E = 1/2 V3

Page 7: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

7

Page 8: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

8

Clean Current Power Ducted Turbine

Page 9: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

9

Page 10: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

10

Page 11: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

11

SFPUC In-Stream Tidal Power Study:SFPUC In-Stream Tidal Power Study:URS Scope of WorkURS Scope of Work

Technology assessment stage of development, impacts, costs

Computer modeling of tidal power resource how much power in the Golden Gate? how much can be extracted without impacts?

Stakeholder assessment agencies, owners, interest groups, permits

Develop recommendations for a Pilot Study

Page 12: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

12

Total Tidal Energy Resource: Modeling Total Tidal Energy Resource: Modeling

2-dimensional and 3-dimensional computer modeling using measured velocities to calibrate and verify models

Models validated by independent expert panel (NOAA, USGS, academics)

Model bathymetry updated to include latest USGS measurements

Page 13: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

13

Computer Model DomainComputer Model Domain

N

Elevation (m,NGVD)

Above 43 - 42 - 31 - 20 - 1

-1 - 0-2 - -1-3 - -2-4 - -3-5 - -4-6 - -5-7 - -6-8 - -7-9 - -8

-10 - -9-12 - -10-15 - -12-20 - -15-25 - -20-30 - -25-40 - -30-60 - -40-80 - -60

Below -80

0 20 40 60 80(kilometer)

0

10

20

30

40

50

60

70

80

90

100

(kilo

met

er)

Elevation (m,NGVD)

Above 43 - 42 - 31 - 20 - 1

-1 - 0-2 - -1-3 - -2-4 - -3-5 - -4-6 - -5-7 - -6-8 - -7-9 - -8

-10 - -9-12 - -10-15 - -12-20 - -15-25 - -20-30 - -25-40 - -30-60 - -40-80 - -60

Below -80

0 20 40 60 80(kilometer)

0

10

20

30

40

50

60

70

80

90

100

(kilo

met

er)

Page 14: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

14

Velocity Structure, Golden GateVelocity Structure, Golden Gate(4-24-2007: Mark Stacey data set)

Early Flood Peak Flood Early Ebb Peak Ebb

Page 15: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

15

Station LocationsStation Locations

Page 16: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

16

Golden Gate TideGolden Gate Tide

Page 17: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

17

Speed at C1, 21m below MLLWSpeed at C1, 21m below MLLW

Page 18: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

18

N

Current speed(m/s)

Above 2.22.1 - 2.2

2 - 2.11.9 - 21.8 - 1.91.7 - 1.81.6 - 1.71.5 - 1.61.4 - 1.51.3 - 1.41.2 - 1.31.1 - 1.2

1 - 1.10.9 - 10.8 - 0.90.7 - 0.80.6 - 0.70.5 - 0.60.4 - 0.50.3 - 0.40.2 - 0.30.1 - 0.2

0 - 0.1Below 0

06/11/1980 01:30:00

0 5 10 15(kilometer)

0

2

4

6

8

10

12

14

(kilo

me

ter)

Current Speed and Direction Current Speed and Direction During a Spring TideDuring a Spring Tide

Current speed(m/s)

Above 2.22.1 - 2.2

2 - 2.11.9 - 21.8 - 1.91.7 - 1.81.6 - 1.71.5 - 1.61.4 - 1.51.3 - 1.41.2 - 1.31.1 - 1.2

1 - 1.10.9 - 10.8 - 0.90.7 - 0.80.6 - 0.70.5 - 0.60.4 - 0.50.3 - 0.40.2 - 0.30.1 - 0.2

0 - 0.1Below 0

06/11/1980 01:30:00

0 5 10 15(kilometer)

0

2

4

6

8

10

12

14

(kilo

met

er)

N

Current speed(m/s)

Above 2.22.1 - 2.2

2 - 2.11.9 - 21.8 - 1.91.7 - 1.81.6 - 1.71.5 - 1.61.4 - 1.51.3 - 1.41.2 - 1.31.1 - 1.2

1 - 1.10.9 - 10.8 - 0.90.7 - 0.80.6 - 0.70.5 - 0.60.4 - 0.50.3 - 0.40.2 - 0.30.1 - 0.2

0 - 0.1Below 0

06/10/1980 19:30:00

0 5 10 15(kilometer)

0

2

4

6

8

10

12

14

(kilo

me

ter)

Max Flood Max Ebb

Page 19: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

19

Mean Power DensityMean Power Density 2-D output over 11 days (6/2/90 to 6/13/80)

Power Flux (W/m^2)

Above 70005000 - 70003000 - 50001500 - 30001000 - 1500

800 - 1000700 - 800600 - 700500 - 600450 - 500400 - 450350 - 400300 - 350250 - 300200 - 250175 - 200150 - 175125 - 150100 - 125

75 - 10050 - 7525 - 50

0 - 25Below 0

0 5 10 15(kilometer)

0

2

4

6

8

10

12

14

(kilo

met

er)

Power Flux (W/m^2)

Above 70005000 - 70003000 - 50001500 - 30001000 - 1500800 - 1000700 - 800600 - 700500 - 600450 - 500400 - 450350 - 400300 - 350250 - 300200 - 250175 - 200150 - 175125 - 150100 - 125

75 - 10050 - 7525 - 50

0 - 25Below 0

0 5 10 15(kilometer)

0

2

4

6

8

10

12

14

(kilo

met

er)

321 uAρP

Page 20: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

20

3D Model/Flythrough3D Model/FlythroughAnimation Creation Animation Creation (separate file)(separate file)

Collected base data from various sources (including USGS, California Spatial Information Library, NOAA, Furgo, USACE, SFEI)

Draped aerial imagery over elevation data for a realistic representation

Obtained 3D model of the Golden Gate bridge and wind turbines, then scaled and converted to useable format for import to model

Exported animation to an .avi media file

Page 21: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

21

Total Tidal Energy Resource –Total Tidal Energy Resource –URS EstimateURS Estimate

Average energy density in range 0.4 to 0.6 kW/m2

Very localized sites with greater than 1.0 kW/m2

Total average resource in range of 12 to 15 MW

Extractable power in range of 1.0 to 1.5 MW Cost of Power: $0.80 to $1.40 / kwh

Page 22: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

22

Wave power has arrived?Wave power has arrived?

SFPUC feasibility study addressing wave energy resource, extraction technologies, permitting

Plan to deploy an ADCP to confirm wave resource later this year

Goal is to identify 1 or more technologies for pilot studies

Page 23: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

23

Exclusion Zone in Marine SanctuaryExclusion Zone in Marine Sanctuary

Page 24: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

24

bioWave DevicebioWave Device

Page 25: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

25

CETO DeviceCETO Device

Page 26: 1 SFPUC Tidal / Wave Power Feasibility Studies PANC Presentation July 08, 2007 A bit of history... SFPUC In-Stream Tidal Power Feasibility Study at Golden.

26

Wave power has arrived?Wave power has arrived?

To be feasible: Costs need to be similar to those for solar power

- order of 25 to 30 cents/kwh Potential environmental impacts

mooring lines can snag whales submerged to minimize aesthetic concerns recreational boating / fishing / ship traffic reduced shoreline waves – less shoreline erosion and

reduced surf

Permitting – FERC / MMS, State & Local