1. Rencana Anggaran Biaya (RAB)

Jan 10, 2016

Download

Documents

reza

RAB buat pemula
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript

HargaDAFTAR HARGA UPAH DAN BAHANPEKERJAAN: PEMBANGUNAN RUMAH DINASLOKASI: KECAMATANNo.JENIS BAHANHARGASATUANKETERANGANU P A H1Tukang$55,000Hari2Kepala Tukang$66,000Hari3Pekerja$38,500Hari4Mandor$60,500HariB A H A N1Kayu Kale - Kalem2Paku Biasa Uk. 1 " - 4 "kg3Besi BetonRp8,742kg4Kawat BetonRp17,253kg5Baut @ 3/4" Panjang 8 "bh6Kunci Tanam @ 1 - 8 "bh7Kunci Tanam kecilbh8Engsel Besar 4 "bh9Engsel kecilbh10Grendel Besarbh8.69140739311Grendel kecilbh12Kaca Buram tebal. 5 mm, (152 x 122 cm)lembar13Cat Tembok Vinitexkg14Cat Minyak (Cat kayu/besi) Platonekg15Tanah Timbunan Setempatm16Pasir Urugm17Pasir PasangRp135,000m18Pasir Betonm19Kerikil Sungai DisaringRp115,000m20Kerikil sungai tidak disaringm21Batu kali pecah ukuran 5-7 cm jenis kerasm22Batu Kali /Gunung Belah Uk. 10 - 15 cmm23Batu Bata, Uk 5 x 10 x 20 cm )bh24Keramik 20 x 20 cmBh25Keramik 25 x 20 cmBh26Keramik 30 x 30 cmBh27Siku keramik (bon-bon)m'28Portland Cement @ 50 Kg Tipe 1Rp42,000zak29Semen Putih @ 50 Kgzak30Sekring Otomatisunit31Lampu TL 1 x 20 Wattunit32Lampu TL 1 x 40 Wattunit33Lampu Pijar 40 Watt + Fitingunit34Stop Kontakbh35Saklar Gandabh36Saklar Triplebh37Saklar TunggalbhNo.JENIS BAHANHARGASATUANKETERANGAN38Instalasi Listrikttk39Triplek 4 mmLbr40Lat Asbesbtg41Rangka Atap Material Baja ringanm242Krean leding @1/2bh43Krean leding @3/4bh44Bak Cuci tangan Wastapel No1bh45Bak cuci piring dan dari besi/aluminiumbh46Pipa leding paralon @ 4" png 5,8 mm'47Pipa leding paralon @ 0,5 " png 5,8 mm'48Pipa leding paralon @ 3" png 5,8 mm'49Klosed Jongkokbh50Klosed duduk tanpa tangkibh51Pipa Hawa Baja Dia. 2"bh52Daun Pintu PVC + engselsetMedan,Disetujui Oleh :Dibuat Oleh :Team LeaderEstimate Engineer

ANALISADAFTAR ANALISAPEKERJAAN: PEMBANGUNAN RUMAH DINASLOKASI: KECAMATANAnalisa AoPekerjaan Bowplank/m'Bahan0.004m3Papan sembarangx Rp.= Rp.0.002m3Kaso sembarangx Rp.= Rp.0.010kgPakux Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Upah0.002Kep. Tukang$66,000x Rp.= Rp.0.010Tukang kayux Rp.= Rp.0.040Pekerja$55,000x Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.0.500Upahx Rp.= Rp.Total Pek. BouplankUpah + Bahan= Rp.Analisa A.1.1 M3 Galian Tanah Biasa0.750Pekerja$38,500x Rp.28,875.00= Rp.1,111,687,500.000.025Mandor$60,500x Rp.1,512.50= Rp.91,506,250.00Jumlah ...........................................= Rp.1,203,193,750.00Dibulatkan .......................................= Rp.Analisa A.2.1 m3 Galian Tanah keras2.000Pekerja$38,500x Rp.77,000.00= Rp.2,964,500,000.000.033Mandor$60,500x Rp.1,996.50= Rp.120,788,250.00Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa A.181 m3 Urugan Tanah Di Bawah Lantai1.200m3Tanah Urugx Rp.= Rp.0.300Pekerja$38,500x Rp.= Rp.0.010Mandor$60,500x Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa A.18.a1 m3 Urugan Pasir Di Bawah Lantai1.200m3Pasir Urugx Rp.= Rp.0.300Pekerja$38,500x Rp.= Rp.0.010Mandor$60,500x Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.21 m3 Batu Kosong di bawah lantai dan pondasi1.100m3Batu Kali Pecah 5-7 cm kerasx Rp.= Rp.1.500Pekerjax Rp.38,500.00= Rp.0.075Mandorx Rp.60,500.00= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.32.h1 m3 Pasangan Batu Kali/Gunung 1Pc : 4Psr1.200m3Batu Kali/ Gunung Belahx Rp.= Rp.0.522m3Pasir Pasangx Rp.135,000.00= Rp.70,470.003.260zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.136,920.001.200Tukangx Rp.55,000.00= Rp.66,000.000.120Kepala Tukangx Rp.66,000.00= Rp.7,920.003.600Pekerjax Rp.38,500.00= Rp.138,600.000.180Mandorx Rp.60,500.00= Rp.10,890.00Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.33. m1 m3 Pasangan Batu Bata Trasraam 1Pc : 2Psr450.000bhBatu Bataco Padatx Rp.= Rp.0.333m3Pasir Pasangx Rp.135,000.00= Rp.44,955.004.117zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.172,914.001.500Tukangx Rp.55,000.00= Rp.82,500.000.150Kepala Tukangx Rp.66,000.00= Rp.9,900.004.500Pekerjax Rp.38,500.00= Rp.173,250.000.225Mandorx Rp.60,500.00= Rp.13,612.50Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.44.1 m 3 Beton Cor 1Pc : 3Ps : 6Kr1.000mKrikil sungai yang disaringx Rp.= Rp.4.236zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.177,912.000.500mPasir Pasangx Rp.135,000.00= Rp.67,500.006.000Pekerjax Rp.38,500.00= Rp.231,000.000.300Mandorx Rp.60,500.00= Rp.18,150.0000.500Tukangx Rp.55,000.00= Rp.27,500.000.050Kepala Tukangx Rp.66,000.00= Rp.3,300.00Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.33.h.1 m3 Pasangan Batu Bata 1Pc : 4Ps450.0bhBatu Bataco Padatx Rp.= Rp.0.406m3Pasir Pasangx Rp.135,000.00= Rp.54,810.002.530zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.106,260.001.500Tukangx Rp.55,000.00= Rp.82,500.000.150Kepala Tukangx Rp.66,000.00= Rp.9,900.004.500Pekerjax Rp.38,500.00= Rp.173,250.000.225Mandorx Rp.60,500.00= Rp.13,612.50Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.50 q.1 m2 Plesteran 1Pc : 4Psr Tebal 15 mm0.021MPasir Pasangx Rp.135,000.00= Rp.2,821.500.130zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.5,460.000.200Tukangx Rp.55,000.00= Rp.11,000.000.020Kepala Tukangx Rp.66,000.00= Rp.1,320.000.400Pekerjax Rp.38,500.00= Rp.15,400.000.020Mandorx Rp.60,500.00= Rp.1,210.00Jumlah ...........................................= Rp.37,211.50Dibulatkan .......................................= Rp.Analisa G.50 h.1 m2 Plesteran 1Pc : 2Psr Tebal 15 mm0.011m3Pasir Pasang135000x Rp.1,539.00= Rp.207,765,000.000.140zakSemen Portland @ 50 kg42000x Rp.5,880.00= Rp.246,960,000.000.200Tukang$55,000x Rp.11,000.00= Rp.605,000,000.000.020Kepala Tukang$66,000x Rp.1,320.00= Rp.87,120,000.000.400Pekerja$38,500x Rp.15,400.00= Rp.592,900,000.000.020Mandor$60,500x Rp.1,210.00= Rp.73,205,000.00Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.41.1 m3 Beton Cor 1Pc : 2Ps : 3Kr0.820m3Batu Kerikil Sungai disaringx Rp.115,000.00= Rp.94,300.006.800zakSemen Portland @ 50 kgx Rp.42,000.00= Rp.285,600.000.540m3Pasir Pasangx Rp.135,000.00= Rp.72,900.006.000Pekerjax Rp.38,500.00= Rp.231,000.000.300Mandorx Rp.60,500.00= Rp.18,150.001.000Tukangx Rp.55,000.00= Rp.55,000.000.100Kepala Tukangx Rp.66,000.00= Rp.6,600.00Jumlah ...........................................= Rp.763,550.00Dibulatkan .......................................= Rp.Analisa I.2Mengerjakan 100 Kg Besi Beton Memotong/Memasang untuk Beton Bertulang9.000Tukangx Rp.55,000.00= Rp.495,000.003.000Kepala Tukangx Rp.66,000.00= Rp.198,000.009.000Pekerjax Rp.38,500.00= Rp.346,500.00Jumlah ...........................................= Rp.1,039,500.00Upah0.5x Rp.1,039,500.00= Rp.519,750.00110.000kgBesi Betonx Rp.8,742.00= Rp.961,620.002.000kgKawat Betonx Rp.17,253.00= Rp.34,506.00Jumlah ...........................................= Rp.1,515,876.00Analisa F.8.1 m3 Beton Bertulang diperlukan 10 m2 Papan Bekisting1 m2 Upah Cetakan Bekisting0.200Pekerja$38,500x Rp.7,700.00= Rp.296,450,000.000.500Tukang$55,000x Rp.27,500.00= Rp.1,512,500,000.000.050Kepala Tukang$66,000x Rp.3,300.00= Rp.217,800,000.000.010Mandor$60,500x Rp.605.00= Rp.36,602,500.00Jumlah ...........................................= Rp.2,063,352,500.00Untuk 10 m210x Rp.= Rp.Bahan-bahan yang diperlukan + membongkar Cetakan :0.400mKayu Sembarang ( Bekisting )x Rp.= Rp.0.400kgPakux Rp.= Rp.4.000Pekerjax Rp.= Rp.Jumlah ...........................................= Rp.300Dibulatkan .......................................= Rp.300157.189Analisa G. 41+ I.21 m3 Untuk Pekerjaan Pondasi setempat dengan besi beton 39,148 Kg246.055AnlG.41 = Rp.0.042.91AnlI.2 x 0,39148.= Rp.593,435.1442.818224.458Jumlah ...........................................= Rp.593,435.1442.864245.5404204.617Analisa Supl V .1.a1 m3 Untuk Pekerjaan Beton Cor Bertulang Cam : 1 : 2 : 3 dengan besi beton 245,54 KgAnlG.41 = Rp.AnlI.2 x 2,4554 = Rp.AnlF8 = Rp.Jumlah ...........................................= Rp.Analisa Supl V .1.b1 m3 Untuk Pekerjaan Beton Cor Bertulang Cam : 1 : 2 : 3 dengan besi beton 100 KgAnlG.41 = Rp.AnlI.2 = Rp.AnlF8 = Rp.Jumlah ...........................................= Rp.Analisa G.671 m2 Lantai Beton Cor 1Pc : 3Ps : 6Kr0.070m3Kerikil Sungai Disaringx Rp.= Rp.0.364zakSemen Portland @ 50 kg42000x Rp.15,288.00= Rp.642,096,000.000.044m3Pasir betonx Rp.= Rp.0.720Pekerja$38,500x Rp.27,720.00= Rp.1,067,220,000.000.036Mandor$60,500x Rp.2,178.00= Rp.131,769,000.000.135Tukang$55,000x Rp.7,425.00= Rp.408,375,000.000.014Kepala Tukang$66,000x Rp.891.00= Rp.58,806,000.00Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.72. a1 M2 Lantai Keramik Uk. 30 x 30 cm11.000BhKeramik 30 x 30 cmx Rp.= Rp.0.114ZakSemen Portland @ 50 kg42000x Rp.= Rp.0.002ZakSemen Porland Putihx Rp.= Rp.0.023MPasir Pasang135000x Rp.3,105.00= Rp.419,175,000.000.500Pekerja$38,500x Rp.19,250.00= Rp.741,125,000.000.025Mandor$60,500x Rp.1,512.50= Rp.91,506,250.000.250Tukang$55,000x Rp.13,750.00= Rp.756,250,000.000.025Kepala Tukang$66,000x Rp.1,650.00= Rp.108,900,000.00Jumlah ...........................................= Rp.2,116,956,250.00Dibulatkan .......................................= Rp.Analisa G.72. b1 M2 Lantai Keramik Uk. 25 x 20 cm20.000BhKeramik 25 x 20 cmx Rp.= Rp.0.114ZakSemen Portland @ 50 kgx Rp.= Rp.0.002ZakSemen Porland Putihx Rp.= Rp.0.033MPasir Pasangx Rp.= Rp.0.500Pekerjax Rp.= Rp.0.025Mandorx Rp.= Rp.0.250Tukangx Rp.= Rp.0.025Kepala Tukangx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa G.72. c1 M2 Lantai Keramik Uk. 20 x 20 cm25.000BhKeramik 20 x 20 cmx Rp.= Rp.0.114ZakSemen Portland @ 50 kgx Rp.= Rp.0.002ZakSemen Porland Putihx Rp.= Rp.0.033MPasir Pasangx Rp.= Rp.0.500Pekerjax Rp.= Rp.0.025Mandorx Rp.= Rp.0.250Tukangx Rp.= Rp.0.025Kepala Tukangx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.271 m3 Rangka bawah/kozen diketam rapi36.000Tukangx Rp.= Rp.3.600Kepala Tukangx Rp.= Rp.12.000Pekerjax Rp.= Rp.0.600Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.75x Rp.= Rp.1.100m3Kayu Kale kalex Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.271 m3 Rangka Ventilasi diatas pintu/ jendela36.000Tukangx Rp.= Rp.3.600Kepala Tukangx Rp.= Rp.12.000Pekerjax Rp.= Rp.0.600Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.75x Rp.= Rp.1.100m3Kayu Kale kalex Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.291 M2 Memasang Pintu / Jendela Kaca 5 mm72.000Tukang Kayux Rp.= Rp.7.200Kepala Tukangx Rp.= Rp.15.000Pekerjax Rp.= Rp.0.750Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.500x Rp.= Rp.1.100M3Kayu Kale - kalex Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.301 M2Daun Pintu triplek 4 mm Double4.000Tukangx Rp.= Rp.0.400Kepala Tukangx Rp.= Rp.1.300Pekerjax Rp.= Rp.0.065Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.5x Rp.= Rp.0.004M3Kayu Simalambuox Rp.= Rp.1.000LbrTriplek tebal 4 mmx Rp.= Rp.0.100KgPaku Biasax Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.331 m2 Pintu / Jendela Panel dilidah/alur7.500Tukangx Rp.= Rp.0.750Kepala Tukangx Rp.= Rp.2.500Pekerjax Rp.= Rp.0.125Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.75x Rp.= Rp.0.044m3Kayu Kale - kalex Rp.0.0= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.361 M2 Memasang Pintu / Jendela Kaca 5 mm6.000Tukang Kayux Rp.= Rp.0.600Kepala Tukangx Rp.= Rp.2.000Pekerjax Rp.= Rp.0.100Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.500x Rp.= Rp.0.035M3Kayu Kale kalex Rp.= Rp.1.000LbrKaca buram t = 5 mmx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.36 a1 M2Memasang Ventilasi Kaca 5 mm6.0000Tukang Kayux Rp.= Rp.0.6000Kepala Tukangx Rp.= Rp.2.0000Pekerjax Rp.= Rp.0.1000Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah0.5x Rp.= Rp.0.0295M3Kayu Kale kalex Rp.= Rp.1.3780m2Kaca Buram t = 5 mmx Rp.= Rp.Jumlah ...........................................= Rp.Analisa F.1.1 m3 Gantungan Piyan / Rangka Plafon15.000Tukangx Rp.= Rp.1.500Kepala Tukangx Rp.= Rp.5.000Pekerjax Rp.= Rp.0.250Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Upah :0.5x Rp.= Rp.1.100m3Kayu Kale kalex Rp.= Rp.0.200kgPaku Biasax Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa Supl. VIII a1 M2 Plafond Triplek t = 4 mm0.3470LbrTriplek t = 4 mmx Rp.= Rp.1.0000BtgLat kayux Rp.= Rp.0.0200KgPakux Rp.= Rp.0.5000Pekerjax Rp.= Rp.0.0250Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa F.21a.1m2 Listplank Kayu0.025m2Kayu Kale kalex Rp.= Rp.0.100kgPakux Rp.= Rp.0.280Pekerjax Rp.= Rp.0.014Mandorx Rp.= Rp.0.800mTukang Kayux Rp.= Rp.0.080kgKepala Tukangx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa K.23100 m2 Mengecat7.500Tukangx Rp.= Rp.0.750Kepala Tukangx Rp.= Rp.5.000Pekerjax Rp.= Rp.0.250Mandorx Rp.= Rp.Jumlah ...........................................= Rp.Untuk 1 M20.01x Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa K.23-a1 m2 Mengecat Tembok0.425kkgCat Tembokx Rp.= Rp.3.000Upah Cat 3 Lapisx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Analisa K.23-b1 m2 Mengecat Kilat0.425kgCat Kilatx Rp.= Rp.3.000Upah Cat 3 Lapisx Rp.= Rp.Jumlah ...........................................= Rp.Dibulatkan .......................................= Rp.Medan,Disetujui Oleh :Dibuat Oleh :Team LeaderEstimate Engineer

Rekap RABDAFTAR ANGGARAN BIAYA (RAB)PEKERJAAN: PEMBANGUNAN RUMAH DINASLOKASI: KECAMATANNoUraian PekerjaanAnalisaVolumeSatuanHarga SatuanJumlah Harga( Rp )( Rp )1234567IPEKERJAAN PENDAHULUAN1Pembersihan LapanganDitaksir--2Membuat Gudang BahanDitaksir--3Pengadaan Air KerjaDitaksir--4Pengukuran dan Pemasangan BowplankA,o48M'5Membuat Papan Nama ProyekDitaksirJumlah ..IIPEKERJAAN TANAH1Galian Tanah PondasiA.137.562m32Urugan Tanah Kembali0,25*A.1--103Urugan Tanah Dibawah LantaiA.18.a7.504m3204Urugan Pasir Dibawah PondasiA.18.b2.534m3305Urugan Pasir Dibawah LantaiA.18.b8.04m340Jumlah ..50IIIPEKERJAAN BATU / BETON601Pek. Pasangan batu kosong di bawah pondasiG.24.938m3702Pek. Pondasi Batu Kali Camp. 1 : 4G.32.h13.075m3803Pek. Pondasi Setempat Camp. 1: 2 : 3G. 41 + I. 21.56m3593,435.14904Pek. Tiang Kolom Camp. 1 : 2 : 3Supl V.1.a1.613m3105Pek. Sloof Camp. 1: 2 : 3Supl V .1.a2.086m3116Pek. Ring Balok Camp. 1 : 2 : 3Supl V .1.a1.712m3127Pek. Dinding Transram Camp. 1 : 2G.32.m2.189m3138Pek. Dinding Bata ( Camp. 1 : 4 )G.33.h27.044m3149Pek. Pemelesteran Dinding Bata Camp 1 : 4G.50.q576.865m21510Pek. Pemelesteran Dinding Transram 1:2G.50.h30.775m21611Pek. Lantai Kerja Camp. 1: 2 : 3 Tebal = 5 cmG. 410.099m3763,550.001712Pek. Lantai Beton Camp. 1: 3 : 6 Tebal = 5 cmG. 442.412m31813Pek. Lantai Keramik uk. 30 x 30 cmG. 72. a74.4m21914Pek. Lantai Keramik uk. 20 x 20 cm (KM)G. 72. c6m215Pek. Pasangan siku keramik (bon-bon)Dihitung12m'Jumlah ..IVPEKERJAAN KAYU DAN KUSEN1Pek. Kozen Pintu & JendelaF. 270.935m32Pek. Daun Pintu PanelF.33.13.44m23Daun Pintu PVCDihitungan2bh4Pek. Memasang pintu/jendela Kaca t = 5 mmF. 369.705m25Pek. Gantungan PlafondF.11.592m36Pek. Plafon Triplek 4 mmSupl. VIII a146.09m27Pek. Listplank KayuF.21.a16.66m2Jumlah ..NoUraian PekerjaanAnalisaVolumeSatuanHarga SatuanJumlah Harga( Rp )( Rp )1234567VPEKERJAAN ATAP1Pek. Rangka Atap Baja RinganDihitung165.73m2Jumlah ..VIPEK. KUNCI DAN ALAT- ALAT PENGGANTUNG1Kunci Tanam 2 SlaagDihitung8Set2Engsel Cabut, Ukuran 4"Dihitung24Set3Grendel. Ukuran 6"Dihitung16SetJumlah ..VIIPEKERJAAN INSTALASI LISTRIK1Lampu TL 20 WattDihitung10Unit2Lampu Pijar 40 WattDihitung7Unit7Instalasi Titik ApiDihitung17Jumlah ..VIIIPEKERJAAN CAT1Cat Tembok / PlafonK.23.a416.051m22Cat Kilat Daun Pintu dan ListplankK.23.b64.206m2Jumlah ..IXPEK. PEMBUATAN SEPTICKTANK+ RESAPAN1Pek. Galian TanahA.19.761M32Pek. Cor Beton Camp. 1 : 3 : 6G.440.78M33Pek. Cor Beton Bertulang Camp. 1: 3 : 5Supl. V.1.b0.536M34Pek. Pasangan Dinding Bata Camp. 1 : 2G.33.h2.055M35Pek. Plesteran Transram Camp. 1 : 2G.50.h19.5M36Pipa Hawa Baja Dia. 2"Dihitung1Bh7Pipa PVC Dia. 4"Dihitung23M'8Penyambung pipa 15 % dari bahanDihitung--9Pipa PVC Dia. 3"Dihitung12M'10Penyambung pipa 15 % dari bahanDihitung--11Closed JongkokDihitung2Bh12Pek. Ijuk, kerikil, koral, pasir dan saringanDitaksirJumlah ..XPEKERJAAN LAIN - LAIN1Perancah Kerja--2Foto Dokumentasi rekaman Proyek--3Pembersihan AkhirDitaksir--Jumlah ..Medan,Disetujui Oleh :Dibuat Oleh :Team LeaderEstimate EngineerR E K A P I T U L A S IPEKERJAAN: PEMBANGUNAN RUMAH DINASLOKASI: KECAMATANNoU R A I A NJUMLAH HARGAIPEKERJAAN PENDAHULUANIIPEKERJAAN TANAHIIIPEKERJAAN BATU / BETONIVPEKERJAAN KAYU DAN KUSENVPEKERJAAN ATAPVIPEKERJAAN KUNCI DAN ALAT - ALAT PENGGANTUNGVIIPEKERJAAN INSTALASI LISTRIKVIIIPEKERJAAN CATIXPEK. PEMBUATAN SEPTICKTANK+ RESAPANXPEKERJAAN LAIN - LAINJumlah PPN 10% Jumlah Dibulatkan 390.00.0Terbilang: ( Dua ratus dua puluh dua juta empat ratus tujuh puluh tiga ribu rupiah )0Medan,Disetujui Oleh :Dibuat Oleh :Team LeaderEstimate Engineer

TS & Kurva SR E K A P I T U L A S IPEKERJAANLOKASINoU R A I A NBobot (%)IPEKERJAAN PENDAHULUANIIPEKERJAAN TANAHIIIPEKERJAAN BATU / BETONIVPEKERJAAN KAYU DAN KUSENVPEKERJAAN ATAPVIPEKERJAAN KUNCI DAN ALAT - ALAT PENGGANTUNGVIIPEKERJAAN INSTALASI LISTRIKVIIIPEKERJAAN CATIXPEK. PEMBUATAN SEPTICKTANK+ RESAPANXPEKERJAAN LAIN - LAINJumlah

Contoh TS % K STIME SCHEDULEKONTRAKTOR PELAKSANAPT. .........PENGAWASAN PEMBANGUNAN GEDUNG KANTOR ....................MINGGU KE : XX (DUA PULUH), PERIODE : 17 DESEMBER s/d 28 DESEMBER 2007NO.URAIAN PEKERJAANBOBOTBULAN IBULAN IIBULAN IIIBULAN IVBULAN VKETERANGANRENCANAMINGGUMINGGUMINGGUMINGGUMINGGUREALISASIIIIIIIIVVVIVIIVIIIIXXXIXIIXIIIXIVXVXVIXVIIXVIIIXIXXX01 Agst. s/d06 Agst. s/d13 Agst. s/d20 Agst. s/d27 Agst. s/d01 Sept. s/d10 Sept. s/d17 Sept. s/d24 Sept. s/d01 Oktb. s/d08 Oktb. s/d15 Oktb. s/d22 Oktb. s/d01 Nov. s/d12 Nov. s/d19 Nov. s/d26 Nov. s/d01 Des. s/d10 Des. s/d17 Des. s/d( % )05 Agst.12 Agst.19 Agst.26 Agst.31 Agst.09 Sept.16 Sept.23 Sept.30 Sept.07 Oktb.14 Oktb.21 Oktb.31 Oktb.11 Nov.18 Nov.25 Nov.30 Nov.09 Des.16 Des.28 Des.IPEKERJAAN PERSIAPAN0.8640.2880.2880.288IIPEKERJAAN GALIAN2.4090.4020.4020.4020.4020.4020.402IIIPEKERJAAN PONDASI20.4032.9152.9152.9152.9152.9152.9152.915IVPEKERJAAN STRUKTUR11.2471.6071.6071.6071.6071.6071.6071.607VPEKERJAAN FINISING LANTAI4.6370.9270.9270.9270.9270.927VIPEKERJAAN FINISING DINDING1.6290.2720.2720.2720.2720.2720.272VIIPEKERJAAN PLAFOND7.1561.4311.4311.4311.4311.431VIIIPEKERJAAN PASANGAN BATA DAN PLESTERAN9.2091.1511.1511.1511.1511.1511.1511.1511.151IXPEKERJAAN ATAP29.3155.8635.8635.8635.8635.863XPEKERJAAN PINTU DAN JENDELA3.6500.9130.9130.9130.913XIPEKERJAAN PENGECATAN5.6621.1321.1321.1321.1321.132XIIPEKERJAAN SANITASI DAN SALURAN2.5850.6460.6460.6460.646XIIIPEKERJAAN LISTRIK1.1900.5950.595XIVPEKERJAAN HALAMAN SARANA DAN PRASARANA0.0440.0110.0110.0110.011J u m l a h ..100.000RENCANAKEMAJUAN PEKERJAAN MINGGUAN0.2880.2880.6900.4020.4023.3163.3164.9234.5215.6735.6737.78410.73212.16311.68911.42310.5063.8162.3850.011RENCANAKEMAJUAN PEKERJAAN KOMULATIF0.00.2880.5761.2661.6672.0695.3858.70113.62418.14523.81829.49037.27448.00760.17071.85983.28293.78997.60499.989100.000REALISASIKEMAJUAN PEKERJAAN MINGGUAN0.00.6480.2911.0050.7812.0891.5762.0732.0615.1110.00.00.00.00.00.00.00.00.00.0REALISASIKEMAJUAN PEKERJAAN KOMULATIF0.00.00.6480.9391.9442.7254.8146.3908.46310.52415.63515.63515.63515.63515.63515.63515.63515.63515.63515.63515.635DEVIASI ( + / - )-0.2880.072-0.3270.2770.657-0.571-2.311-5.161-7.621-8.183-13.855-21.639-32.372-44.535-56.224-67.647-78.154-81.969-84.354-84.365DEVIASIDiketahui oleh :Diperiksa oleh :Dibuat oleh :PEJABAT PEMBUAT KOMITMENKONSULTAN PENGAWASKONTRAKTOR PELAKSANANIP. /...................Site EngineerDirektur

Contoh TS % K S000.28800.5760.6481.26550.9391.6671.9442.06852.7255.38471428574.8148.70092857146.3913.62385714298.46318.145285714310.52423.817839285715.63529.490392857115.63537.274346428615.63548.006585714315.63560.17002515.63571.8591515.63583.28202515.63593.788515.63597.6043515.63599.98915.63510015.635

soal 2

soal 3xy0,07583,010,496,12210061009,510020100

soal 3

83,01 96,12persen lolos(%

soal 4normal streshshear stresh00,1570,160,3140,2430,6280,4172c= intercept(c= intercept(

soal 4

0,628