Xcellence Program 1 Project Charter ProjectNam e: Sponsor O pportunity Statem ent: Team Leader: P rojectType: A ccounting: Custom ers: B enefits: B arriers or S pecial Requirements: TargetEnd Date: Jana Sherrill 6/18/2012 J errys Azondekon W hite/W heatD eliSub Processing Im provem ent Green Belt R esources C ham pion: S ubjectM atter E xperts: M ike Least P rojectS tartD ate: Kathy Endres Analysis show s thatsub shop bread is currently being processed w ell below it's potential throughputrate and below the standard yield. This results in highercostto produce,longerruns to produce,and the "rest"tim e in the holding freezernotbeing to spec. B arriers orS pecial R equirem ents Dennis M cG overn C ustom ers & B enefits production variability, changeoverrequirem ents, processing requirem ents, staffing lim itations, skill set lim itations C ore Team M em bers: Consumers,Stores,Operations,Scheduling Maxim ized production tim e on a critical resource,m axim izing production using straightlaborhours,achieving 100% service level forstores,achieving desired freezertim e forsub shop bread (14 day dw ell tim e) 4/2/2012 P rojectD escription Paul Fiorica Bryan Allen Jam ie Rothfuss S ponsor(s): DEFINE
17
Embed
1 Project Charter DEFINE. 2 Project Charter DEFINE.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Xcellence Program1
Project Charter
Project Name:
Sponsor Opportunity Statement:
Team Leader:Project Type:Accounting:
Customers:
Benefits:
Barriers or Special Requirements:
Target End Date:
Jana Sherrill
6/18/2012
Jerrys Azondekon
White/Wheat Deli Sub Processing Improvement
Green Belt
Resources
Champion:
Subject Matter Experts:
Mike Least
Project Start Date:
Kathy Endres
Analysis shows that sub shop bread is currently being processed well below it's potential throughput rate and below the standard yield. This results in higher cost to produce, longer runs to produce, and the "rest" time in the holding freezer not being to spec.
Barriers or Special Requirements
Dennis McGovern
Customers & Benefits
production variability, changeover requirements, processing requirements, staffing limitations, skill set limitations
Core Team Members:
Consumers, Stores, Operations, Scheduling
Maximized production time on a critical resource, maximizing production using straight labor hours, achieving 100% service level for stores, achieving desired freezer time for sub shop bread (14 day dwell time)
There is an opportunity identified to supply customers with high quality products that meet their demand. The goal is to increase productivity on the Deli Sub lines through design and implementation of better process flows. This will reduce production cost and improve customer satisfaction.
Project Scope
Frz white deli sub and Frz wheat deli sub - setup, throughput, reliability, quality/yield, capability, c/o
All other product varieties on spiral 1
DEFINEDEFINE
Xcellence Program3
Project Timeline
31-Mar 14-Apr 28-Apr 12-May 26-May 9-Jun
DEFINE
MEASURE
ANALYZE
IMPROVE
CONTROL
Completed Work
Remaining Work
DEFINEDEFINE
Xcellence Program4
Tools Used
Tools Used in Project D M A I C Tools Used in Project D M A I CProcess Mapping Kaizen
SIPOC X Design of Experiements (DOE)
Voice of Customer (VOC) Line / Cell Design
Affinity Diagram Spaghetti Diagram
Brainstorming X X Pareto Analysis
Data Collection Plan X 5-Why & 3-Legged/5-Why
Rolled Throughput Yield Fishbone X
Value Stream Map (VSM) X Theory of Constraints
Swim Lanes Force Field Analysis
Statistical Thinking Set-up Reduction
Standard Work X Total Preventative Maintenance (TPM)
5s / Visual Control Poka-Yoke (Mistake Proofing)
Cause & Effect Pull Systems
FMEA Paired Comparisons
SPC / Control Charts Pilot
Measurement System Analysis Change Management
Capability Analysis X Control Plans
Multi-Vari Analysis Histograms
(other tools) (other tools)
(other tools) (other tools)
DEFINEDEFINE
Xcellence Program5
Process MapDEFINEDEFINE
Frozen Warehouse
Production Control
2
Packaging
1
Dividing & Rounding
Ingredients Warehouse
1
Mixing
CT= 14.5 / 19.5 mn
CO= 0.0 / 2.75 mn
Daily
Ingredients Suppliers
Purchasing
45 Days Order
Bi-Weekly
4 Weeks Forecast
Revised Daily Schedule
CT 11.5 / 17.0 mn
%Scrap = 0.02/0.00
% Remix =1.60/0.95
U/T =1200 mn
Shifts = 2
13.5/17.0 mn
60 mn
11.5/17.0 mn 3 50 mn 0.58 mn78.58 mn
60 mn
Stagging
Shipping
CT = 3 mn
%Scrap= 0.81 / 2.25
% Remix = 5.58/ 6.28
U/T =1200 mn
Shifts = 2
CT = 50 mn
%Scrap = 0.00/0.00
% Remix =0.00/0.00
U/T = 1200 mn
Shifts = 2
CT= 0.58/0.58 mn
%Scrap = 0.83/2.09
% Remix =1.17/0.00
U/T = 1200 mn
Shifts = 2
Save small stops by
standard work
Save loss in speed by standard work
Improve manual operations and
box maker availability
Detail schedule of share resources
plans
Deli Subs Project VSMWegmans -Bakeshop
Reduce Remix and Scrap Rate
Freezing
1
Proofing & Forming
Store Store
Daily
Xcellence Program6
Deli SubsProduction
UNCONTROLLABLE PARAMETERS
• Breakdowns• Stores Orders• Machine Type • Floor Layout
• Process Quality Parameters• Recommended Settings• Possible adjustments
Xcellence Program13
Slide TitleIMPROVEIMPROVE
Coming Up Next !
Thanks for your Attention
Xcellence Program14
Slide TitleCONTROLCONTROL
(Add Control Tools and Update Slide Title)
Takeaway: What are the takeaways?Takeaway: What are the takeaways?
Xcellence Program15
Slide TitleCONTROLCONTROL
(Add Control Tools and Update Slide Title)
Takeaway: What are the takeaways?Takeaway: What are the takeaways?
Xcellence Program16
Potential Future Project ListCONTROLCONTROL
Potential Project Project DescriptionComplexity of Project
Payback of Project
Xcellence Program17
Takeaway: What are the takeaways?Takeaway: What are the takeaways?
Tips and Hints
• Complete the page 1 of Project Charter for new projects• Finish page 2 by the end of the Define phase
• Tell a “Story” with the presentation – walking the audience through your process with major takeaways at each step.
• Copy and paste the Takeaway kicker box at the bottom of this page to highlight items for slides
• Insert new slides, as necessary, for each phase• Keep the Gantt Chart and Tools Used slides up to date• Compress pictures used in presentation to minimize file size• List Potential Future Projects as they are discussed in project work