Top Banner
1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England
18

1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

Dec 18, 2015

Download

Documents

Dortha Dawson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

1

Demand Response Measurement & Verification

Standards Development Project

April 21, 2008

Paul Wattles, ERCOT

Eric Winkler, Ph.D., ISO New England

Page 2: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

2

Goals

• Respond to recommendations from the FERC, the NAESB, and the industry

• Standardize vocabulary, concepts and some processes to enhance cross-regional market entry for Demand Response providers

• Lead NAESB initiative on wholesale market Demand Response measurement & verification standards

Page 3: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

3

Scope

Our work focuses on:

• Demand Response

• Wholesale Programs/Services

• ISO/RTO Administered

Page 4: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

4

IRC Members

Page 5: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

5

Demand Response Measurement and Verification (M&V)

• Equipment, technology, and procedures used to quantify net energy and demand.

• M&V includes elements such as telemetry and metering data collection and analyses, baseline calculations, statistical sample design.

Page 6: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

6

ISO/RTO DR Programs and Services

Product Categories:

Regulation (7)

Reserves (16)(Spinning Reserves & Non-Spinning Reserves)

Energy (19)

Capacity (8)

Page 7: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

7

ISO/RTO DR Matrix (example)R

egio

n

ISO

/RT

O P

rog

ram

or

Ser

vice

Nam

e

Pro

du

ct

Lo

ad D

eplo

ymen

t T

ime

Ag

gre

gat

ion

Allo

wed

Rea

l-T

ime

On

-Sit

e G

ener

atio

n M

easu

rem

ent

Acc

ura

cy

Rep

ort

ing

Inte

rval

Oth

er M

easu

rem

ents

Co

mm

Pro

toco

l

On

-Sit

e G

ener

atio

n M

eter

R

equ

ired

Met

er A

ccu

racy

Clo

ck /

Tim

e A

ccu

racy

Det

ails

of

Met

er/

Eq

uip

men

t S

tan

dar

ds

Met

er D

ata

Rep

ort

ing

D

ead

line

Gra

nu

lari

ty

Val

idat

ing

, Ed

itin

g &

E

stim

atin

g (

VE

E)

Met

ho

d

Ru

les

Fo

r S

tati

stic

al

Sam

plin

g

Bas

elin

e T

ype

AESO SUP Reserve

CAISO PLP Energy

ERCOT EILS Capacity

IESO DL Reserve

ISO-NE RTDRP Capacity

NBSO IL Capacity

NYISO DSASP Reserve

PJM  ELR Energy

Page 8: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

8

Standards Development

• Published by Product Type (4)

• Major Standards Categories– Qualification, Testing & Auditing– Telemetry– After-The-Fact Measurement– Customer Baselines

Page 9: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

9

Qualification Testing and Audit

• Aggregation Eligibility– Indication of if composite / aggregate assets are

allowed.

• Reduction Deadline: – Time at which the requested or contracted level of

response is completely "off the system" (in minutes)

Page 10: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

10

Timing Terminology

DEPLOYMENT PERIOD

RECOVERYPERIOD

RE

DU

CT

ION

DE

AD

LIN

E

DE

PL

OY

ME

NT

RAMPPERIOD

SUSTAINED RESPONSEPERIOD

RE

LE

AS

E/R

EC

AL

L

NO

RM

AL

OP

ER

AT

ION

S

DEMAND RESPONSE EVENT

AD

VA

NC

E N

OT

IFIC

AT

ION

(S)

Page 11: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

11

Telemetry

• Measurements– Measurement of the real-time demand – Separate telemetry of on-site generation, if present– Measurement of net energy injection to the grid (if allowed)– Secondary measurements (e.g. quality flags, breaker status)

• Accuracy– Composite of metering and communications

• Reporting Interval– The time between signals (typically seconds or minutes)

• Communication Protocol– The IT protocol used to collect the data, such as ICCP

Page 12: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

12

After-The-Fact Measurements

• Meter Accuracy– Accuracy of the energy measurement

– Accuracy of the time measurement, if applicable

• Data Reporting– How often the data is sent to the ISO/RTO

– Level of detail required

• Data Validation, Estimation & Editing (VEE)• Statistical Sampling Requirements

Page 13: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

13

Performance: Customer Baseline

• Characteristics of Baseline– Comprehensible– Accurate– Flexible– Reproducible

• Baseline Types– Firm Service Level Drop– Metering before and after instruction– Statistical Modeling– Comparable Day– On-site Generation Data (behind the meter)

Page 14: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

14

Baseline Concept

Measured Load

TIME

ELECTRICITYUSAGE

Baseline

Expected or Contracted Load

Reduction

Reduction deadline

ReleaseDeployment instruction

Normal operations

Page 15: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

15

• Two face to face meetings (Austin TX and Holyoke MA)

• Numerous conference calls• Ad-hoc organization of Demand

Response personnel

IRC Demand Response Coordination

Page 16: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

16

Accomplishments for IRC

• Jan 07: NAESB DSM-EE Project initiated

• Mar 07: Multiple ISO/RTOs engage with NAESB project

• Sept 07: Subgroup convenes; IRC commits personnel and funding; Scope statement for wholesale programs/services developed

• Nov 07: Draft Matrix of ISO/RTO programs completed

• Jan 08: Status report provided to NAESB

• Mar 08: Outline of draft standard provided to NAESB DSM/EE working group

Page 17: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

17

Upcoming Milestones

• Q2 08: ISO NE host to NAESB DSM/EE Meeting• Q3 08: ERCOT host to NAESB DSM/EE Meeting• Q3 08: Draft Standards to be delivered to NAESB

On-Going• Participation in NAESB standards development

process• IRC Program/Service comparison matrix

– Includes information beyond data related to M&V Standards

Page 18: 1 Demand Response Measurement & Verification Standards Development Project April 21, 2008 Paul Wattles, ERCOT Eric Winkler, Ph.D., ISO New England.

18

Contact Information

IRC Program ManagerScott Coe Consultant 203-947-5269 [email protected]

ISO/RTO DR Regional ContactsPaul Wattles ERCOT 512-248-6578 [email protected]

Eric Winkler ISO NE 413-540-4513 [email protected]

Gordon Nadeau AESO 403-539-2568 [email protected]

John Goodin CAISO 916-608-7154 [email protected]

Donna Pratt NYISO 518-356-8758 [email protected]

Mike Robinson MISO 317-249-5741 [email protected]

Gerrud Wallaert SPP 501-614-3358 [email protected]

Pete Langbein PJM 610-666-4583 [email protected]

John Antonakos IESO 905-403-6979 [email protected]

George Porter NBSO 506-458-4707 [email protected]