Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011
45

Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Dec 25, 2015

Download

Documents

Ezra Poole
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Joel Koepke, P.E.ERCOTOperations Support Engineer

ERCOT Experiences During Summer 2011

Page 2: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

2

Objectives

• Identify weather and nature challenges • Identify variables leading to EEAs• Identify mitigating actions of August 4th EEA• Identify outlook and changes for Summer

2012

Page 3: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

3

Weather Extremes

Page 4: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

4

High-Pressure System

Page 5: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

5

Record Drought

Page 6: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

6

West Texas fires in March through May

ERCOT Outages

Stations Impacted

Approximate cost of Transmission equipment damage and maintenance

Fire Contamination

$3,994,264 $1,340,940

Approximate cost of Distribution equipment damage and maintenance

Fire Contamination

$1,500,000 $313,780

Approximate Cost of Congestion

Day-Ahead Market Real-Time Market

$2,170,840.56 $1,127,056.03

Wildfires

Page 7: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

7

Tested Situational Awareness Tools

Page 8: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

8

Record Heat

Page 9: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

9

Average Min/Max Load Values

June – August of 2009 - 2011

Page 10: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

10

Instantaneous Summer Peak

Page 11: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Summer Energy Emergency Alerts

Page 12: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

12

1

2A

2B

3

2011 EEA Procedure

Page 13: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

August 2011Sunday Monday Tuesday Wednesday Thursday Friday Saturday

31 1 2

EEA 13

EEA 14

EEA 2B5

EEA 16

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23

EEA 124

EEA 2A25 26 27

28 29 30 31 1 2 3

June 2011Sunday Monday Tuesday Wednesday Thursday Friday Saturday

26 27

EEA 128 3 4 5 6

2011 Summer Energy Emergency Alerts

Page 14: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

14

PRC

• Physical Responsive Capability (PRC)– A representation of the total amount of system wide On-Line

capability that has a high probability of being able to quickly respond to system disturbances

Page 15: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

15

June 27th EEA Highlights

• 3 unit trips in less than 2 hours– Total of 1,800 MW

• Large wind decline– Drop of 4,200 MW in 4 hours

• Large load increase– Increase of 4,000 MW in 2 hours

• Below 2,300 MW of Reserves for 1 minute• EEA lasted for 1 hour and 25 minutes

Page 16: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

16

June 27th EEA - Frequency

Page 17: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

17

June 27th EEA- Wind and Load

Unit Trips

Page 18: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

18

June 27th EEA – Physical Responsive Capability

Page 19: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

August 2011Sunday Monday Tuesday Wednesday Thursday Friday Saturday

31 1 2

EEA 13

EEA 14

EEA 2B5

EEA 16

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23

EEA 124

EEA 2A25 26 27

28 29 30 31 1 2 3

Page 20: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

20

August Peak Loads

8/3: Record Peak

Page 21: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

21

Variables Affecting Physical Responsive Capability

– Online generation– System load magnitude– Resource outages and derates– Wind output– DC tie imports

Page 22: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

22

Outaged Resource Capacity – 2011

Page 23: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

23

Outaged Resource Capacity – August

Page 24: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

24

Outaged Resource Capacity – Week View

Page 25: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Geographic Wind Regions

Page 26: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

26

Average Summer Wind Contribution

Page 27: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

27

Average EEA Wind Contribution

Page 28: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

28

Summer vs. EEA Comparison – Total Wind

Page 29: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

29

Summer vs. EEA Comparison – West Wind

Page 30: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

30

Summer vs. EEA Comparison – South Wind

Page 31: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

31

Summer vs. EEA Comparison – ERCOT Load

Page 32: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

32

DC-Tie Imports: August 2nd – August 5th

-1,200

-1,000

-800

-600

-400

-200

0

200

400

MW

Total DC Tie Flow East DC Tie Net North DC Tie Net South DC Tie Net

August 2, 2011EEA Level 1

August 3, 2011EEA Level 1

August 4, 2011EEA Level 2B

August 5, 2011EEA Level 1

840 MW

763 MW

1,039 MW998 MW

Page 33: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Load Resources and EILS deployed

August 4th EEA Level 2B

Page 34: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

34

1,392 MW Non-Spin deployed

August 04, 2011 - EEA Level 2B

Issued Watch

Reserves below 2,500 MW

1:25 PM

Cancelled Advisory

10:17 PM

Note: Watch also include:

•Qualified Scheduling Entity Hotline Call

•Transmission Operator Hotline Call

•Postings on the Market Information System and ERCOT website

Cancelled Watch

Issued OCNProjected reserve capacity shortage for hours 14:00 through 21:00

0:06 AM

12:38 PM

Issued Advisory

Reserves below

3,000 MW

2:32 PM 6:09 PM

Cancelled OCN

ERCOT ran out of regulation and issued manual Responsive Reserve deployment

2:15 PM

8:38 PM

3:44 PM

Load Resources Recalled

Move to EEA 2A

From EEA 2B

Move to EEA 1

From EEA 2A

5:53 PM 6:52 PM 8:49 PM

1:45 PM

EILS

Recalled

4:05 PM

EILS deployment Business Hours 3

AUGUST 4 WATCH FOR EXTREME HEAT STILL IN EFFECT

AUGUST 4 WATCH FOR EXTREME HEAT STILL IN EFFECT

Page 35: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

35

ERCOT Load, Wind, and PRC8/4/2011 00:00–12:00

Page 36: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

36

Outaged Capacity8/4/2011 00:00–12:00

Page 37: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

37

ERCOT Load, Wind, and PRC8/4/2011 12:00–24:00

Page 38: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

38

Outaged Capacity8/4/2011 12:00–24:00

Page 39: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

39

1,039 MW

594 MW

229 MW

216 MW ERCOT had a max import of 1,039 MW across the DC Ties

East DC Tie= 594 MW

North DC Tie= 216 MW South DC Tie=229 MW

DC Tie Imports: 8/4/2011

Page 40: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

40

ERCOT Load, Online Capacity, Offline Non-Spin and Net DC flow

59.8

59.9

60

60.1

30,000

35,000

40,000

45,000

50,000

55,000

60,000

65,000

70,000

75,000

HzMW

ERCOT Load

Online capacity

Online Capacity + Offline Non-Spin

Online Capacity + Offline Non-Spin + Net DC flow

Frequency

Page 41: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

41

Summer 2012 Outlook

Page 42: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

42

ERCOT CDR - Report on the Capacity, Demand, and Reserves in the ERCOT Region

• Long-term planning tool• Uses normalized assumptions

– Normal weather basis– Does not include Resource outages

• Summer Summary released in December of 2011.– Peak Demand – 66,195 MW

• 64,618 MW firm load

• 738 MW of firm load added since June CDR

– Available Capacity – 72,444 MW– Reserve Margin – 12.11%

Page 43: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

43

Seasonal Assessment of Resource Adequacy (SARA)

• New report• Evaluates near-term Reserve adequacy

– Uses more recent seasonal climate forecast– Accounts for specific events (e.g. Drought)

• Evaluate the range of reserves usage in a deterministic manner– Uses of reserves:

• Higher peak demands due to above normal weather

• Forced generation outages

• Planned generation outages

• Atypical issues like drought

• Lower wind availability

• Determines the likelihood of Reserves dropping below the 2,300 MW threshold.

Page 44: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

44

Emergency Interruptible Load Service (EILS)

• Proposed Changes– Allow Distributed Generation and unregistered generation to

participate• New capacity

– Remove the 1 MW minimum offer• Improve QSE flexibility

• Increase participation

– Explore the possibility of a 30-min product• Increase participation

Page 45: Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.

Questions?