Top Banner
1
49

1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Jan 17, 2016

Download

Documents

Brittney Powell
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

1

Page 2: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

CONTENTSCONTENTS

2

Page 3: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

BACKGROUNDBACKGROUND

• The NPA finalised the Strategic Plan 2014/19 and

Annual Performance Plan (APP) 2014/15

• In the main the NPA has remained committed to the

strategic direction embarked on a few years ago

• The strategic objectives have been aligned to the

budget structure and the structure of the NPA which

improves accountability and management of

objectives

3

Page 4: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

BACKGROUND CONT.BACKGROUND CONT.

• The Strategic Plan is still based on the Refined Justice, Crime Prevention and Security (JCPS) Delivery Agreement and the draft Medium Term Strategic Framework (MTSF) and the contribution of the NPA to achieving its objectives and targets

• The Strategic Plan 2014-2019 and APP 2014/15 were aligned to link the strategic objectives to the budget structure. These changes were necessitated by the findings raised by the Auditor General through a review of the NPA strategic plan 2014/19 and APP 2014/15

• .

4

Page 5: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

BACKGROUND CONT.BACKGROUND CONT.

• Previously more than one sub-programme was responsible for achieving some of the objectives and targets. This made it difficult to determine responsibility for either success or failure as well the costing of delivering on these objectives and targets

• The plans contain four strategic objectives, each specifically linked to a sub-programme as reflected in the Estimates of National Expenditure

• Some of the DNDPPs were assigned new roles and responsibilities

5

Page 6: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA Strategic Plan 2014-2019 NPA Strategic Plan 2014-2019

6

Page 7: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

VISION AND MISSIONVISION AND MISSION

7

Page 8: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

CONSTITUTIONAL AND LEGISLATIVE MANDATECONSTITUTIONAL AND LEGISLATIVE MANDATE

8

Page 9: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

LEGISLATIVE MANDATE CONT.LEGISLATIVE MANDATE CONT.

9

Page 10: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

POLICY MANDATE POLICY MANDATE

10

Page 11: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Office of the NDPPNDPP

M Nxasana

DNDPP:AFU

W HofmeyrDNDPP:

NPSS Ramaite

DNDPP:Legal Affairs

N Jiba

DNDPP:NSSD

N Mokhatla

DPPs

CEO:K van Rensburg

DG: DOJ N Sindane

SOCA PCLU SCCU OWP

Regional HeadsRegional Heads

MinisterM Masutha

Regional Heads

Regional Heads

Deputy MinisterJ Jeff ery

DCEO:B Sisulu

NPA ORGANISATIONAL STRUCTURENPA ORGANISATIONAL STRUCTURE

11

Page 12: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OBJECTIVESNPA STRATEGIC OBJECTIVES

• The following are the strategic objectives of the NPA:

- Increased successful prosecution

- Improved prosecution of cases that require specialised

prosecution

- Ensure profit is removed from crime

- Ensure threatened witnesses are successfully

protected

12

Page 13: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OVERVIEWNPA STRATEGIC OVERVIEW

13

Page 14: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

STRATEGIC OBJECTIVE 1STRATEGIC OBJECTIVE 1

14

Page 15: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

STRATEGIC OBJECTIVE 2STRATEGIC OBJECTIVE 2

15

Page 16: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

STRATEGIC OBJECTIVE 3STRATEGIC OBJECTIVE 3

16

Page 17: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

STRATEGIC OBJECTIVE 4STRATEGIC OBJECTIVE 4

17

Page 18: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

RISK MANAGEMENT RISK MANAGEMENT

• The NPA identified the following top five risk:

– Emerging crime trends

– Resource capacity

– Stakeholder management

– Information and knowledge management

– Public perception and reputation of NPA

• Mitigation plans will be developed and implementation

monitored

18

Page 19: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA NPA ANNUAL PERFORMANCE PLAN ANNUAL PERFORMANCE PLAN

2014/152014/15

19

Page 20: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OBJECTIVE 1 ANNUAL TARGETS NPA STRATEGIC OBJECTIVE 1 ANNUAL TARGETS

20

Page 21: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND PROGRAMME PERFORMANCE INDICATORS AND TARGETSTARGETS

21

Page 22: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND TARGETSPROGRAMME PERFORMANCE INDICATORS AND TARGETS

22

Page 23: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OBJECTIVE 2 ANNUAL TARGETS NPA STRATEGIC OBJECTIVE 2 ANNUAL TARGETS

23

Page 24: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND TARGETSPROGRAMME PERFORMANCE INDICATORS AND TARGETS

24

Page 25: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OBJECTIVES 3 ANNUAL TARGETS NPA STRATEGIC OBJECTIVES 3 ANNUAL TARGETS

25

Page 26: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND PROGRAMME PERFORMANCE INDICATORS AND TARGETS TARGETS

26

Page 27: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND TARGETS PROGRAMME PERFORMANCE INDICATORS AND TARGETS

27

Page 28: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA STRATEGIC OBJECTIVES 4 ANNUAL TARGETS NPA STRATEGIC OBJECTIVES 4 ANNUAL TARGETS

28

Page 29: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

PROGRAMME PERFORMANCE INDICATORS AND TARGETS PROGRAMME PERFORMANCE INDICATORS AND TARGETS

29

Page 30: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

AMENDMENTS TO PERFORMANCE AMENDMENTS TO PERFORMANCE INDICATORSINDICATORS

•The performance indicator the “number of backlogs cases” was removed from the NPA APP as this indicator is the responsibility of the court services of the DoJ&CD in line with the ENE

•The performance indicator for the conviction rate in the prosecution of sexual offences reported at TCCS was removed from the NPA APP to the SOCA annual plan as the various conviction rates for sexual offences in the previous plan was a duplication

30

Page 31: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

STRATEGIC OBJETIVE 1: REASONS FOR REVIEW STRATEGIC OBJETIVE 1: REASONS FOR REVIEW OF INDICATORSOF INDICATORS

- The indicator for value of compensation orders obtained

was not a SMART indicator as it did not measure the service

for victims of crime rendered

- “Percentage of cases reported at a TCC that is referred to

court for prosecution” was brought back into the NPA APP

because it reflects the value of SOCA unit in assisting the

NPS in dealing with the investigations for prosecution of

sexual offences in relation to their mandate.

31

Page 32: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

BUDGET AND EXPENDITUREBUDGET AND EXPENDITURE

3232

Page 33: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Issues affecting budgetIssues affecting budget

• NPA is a programme in the Justice vote

• NPA is not a separate entity / constitutional institution /

department

• NPA has no direct access to National Treasury (NT)

• NPA has prepared separate financial statements since

2001/2002 through special permission. NT has indicated

that this will be the last year and the issue of the status of

the NPA needs to be resolved33

Page 34: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Capacity to spend budgetCapacity to spend budget

• 2010/11 financial year: 99.5% spent

– Surrendered R13, 262 million

• 2011/12 financial year: 99.8% spent

– Surrendered R6, 249 million

• 2012/13 financial year: 100%

– Surrendered 12c

• 2013/14 financial year: 100%

– Surrendered R4.05

34

Page 35: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA Overall Budget & Expenditure as at NPA Overall Budget & Expenditure as at the 31st of March 2014 (UNAUDITED)the 31st of March 2014 (UNAUDITED)

35

Page 36: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Audit OutcomesAudit Outcomes

• 2007/08 – Disclaimer of opinion

• 2008/09 – Qualified opinion

• 2009/10 – Qualified opinion

• 2010/11 – No audit qualification – emphasis of matter

• 2011/12 – No audit qualification – emphasis of matter

• 2012/13 – Clean audit

Compliance in Government is becoming labour intensive

and costly

Without sufficient funding there is a high probability that it

will have an negative impact on audit findings36

Page 37: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

MTEF BUDGET ALLOCATIONMTEF BUDGET ALLOCATION

2014/15 – 2016/17 2014/15 – 2016/17

37

Page 38: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Overall DoJ&CD Budget growth over the Overall DoJ&CD Budget growth over the Medium Term Medium Term

38

Page 39: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Overall DoJ&CD Percentage Budget growth Overall DoJ&CD Percentage Budget growth over the Medium Term over the Medium Term

39

Page 40: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Budget allocation for the NPA per sub Budget allocation for the NPA per sub programme over the MTEF period (R’000)programme over the MTEF period (R’000)

40

Page 41: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Budget allocation for the NPA per economic Budget allocation for the NPA per economic classification over the MTEF period (R’000)classification over the MTEF period (R’000)

41

Page 42: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPA Percentage Budget growth over the NPA Percentage Budget growth over the Medium Term Budget Allocations (R’000) Medium Term Budget Allocations (R’000)

42

Page 43: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Compensation of Employees, Goods & Service and Compensation of Employees, Goods & Service and Other Ratio over MTEF periodOther Ratio over MTEF period

43

Page 44: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

NPS Service Delivery Performance OverviewNPS Service Delivery Performance Overview

44

Page 45: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Alternative funding - CARAAlternative funding - CARA

• New CARA bid amounting to R45m for curators submitted during March 2013 –

not yet approved.

• CARA funds received only for specific projects:

45

Page 46: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Alternative funding: IJS FundingAlternative funding: IJS Funding

• Funding received through IJS during 2013/14 for:• Integrated Case Management: ECMS• Departmental BI and MIS: ECMS reporting (OMS)• Departmental Integration Solutions• Departmental Infrastructure: DRP, Storage and

Hardware• Capacity: Program Management and support

46

Page 47: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Alternative funding: IJS FundingAlternative funding: IJS Funding

• New IJS budget allocation for the outer years

47

Page 48: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Unfunded budget prioritiesUnfunded budget priorities

• NPA head office building lease expires in 2017

• Leased DPP office buildings (Cape Town, Port

Elizabeth, Durban, Pretoria, Bloemfontein,

Grahamstown, Mmabatho, Kimberley, Mthatha)

• Want to move from leased to State owned office

accommodation

48

Page 49: 1. CONTENTS 2 BACKGROUND The NPA finalised the Strategic Plan 2014/19 and Annual Performance Plan (APP) 2014/15 In the main the NPA has remained committed.

Thank youThank you

49