Colorado Coordinated Planning GroupTEPPC UpdateAugust 9, 2012

CCCCCCPPPGGG

Page 2: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 2

CCPG Primary Transmission Participants

Page 3: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 3

CCPG – General Information

Forum for joint transmission planning Recognized WECC Sub-Regional Planning Group4-5 Open Meetings/YearFebruary, April, August (Joint with SWAT/Sierra), December

Denver TSGT OfficesOpen to All Interested StakeholdersMeeting Notices/Materials Posted at: WestConnect Website and WestConnect Transmission Planning - CCPG

Page 4: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 4

CCPG Sub-Region Footprint

Page 5: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 5

2012 CCPG Organization Chart

S te erin g C o m m itteeC h a ir: B lan e T a ylo r

F o o th illsC h a ir:Je re m y B ro w n rigg

D E E PC h a ir: C lif f B erth e lo t

W Y /S D C om m o n U seC h a ir: E ric E g ge

W e ste rn S lo peC h a ir: T B D

(T o t 2 A 20 1 0)

E a st S lo peR e fe r to La m ar

S LV

T o t 3

D e n ver-M e tro

S u b co m m itte esS p e cif ic G e o gra p h ic P o rtion

m u lt i-ye ar

L o ng R an geC h a ir: M a rk S to u t

1 0 -yr L & R

C o nce p tu a l P la nn ingC o -cha ir: In e z D o m ing u ez

C o -ch a ir: G e rry S te lle rn

S B 1 00C h a ir: T o m G re en

2 0 10 - L a m a r S tud ies

B a se C a se C oo rd ina tionC h a ir: T h ie n N g u yen

N E R C C om p lia n ceC h a ir: S h a w n C a rlson

V o ltag e C o ord ina tionC h a ir: R o y G ea rh a rt

S h o rt C ircu it D a ta B a seC h a ir: V aca nt

W o rk G ro u pse n tire fo o tp rin t

m u lt i-ye ar

A rch er In te rco nn e ctW E C C R a ting

S p o n sor: T S G T

W Y C O In te rt ieW E C C R a ting

S p o nso r: L S P o w er

H P XW E C C R e g ion a l P la n n ing

S p o n so rs : M u lt ip le

C o m m u n ica tionC h a ir: T o m G re en

T a sk F o rcesp o rtio n o r e n tire fo o tp rin t

1 -2 ye a r d u ra tion

W E C C T E P P CJe ff H e in

W E C C O T C P CJ im H irn ing

W e stC o nn e ctB o b E as ton

C P U CIn e z D om ing u ez

G E OC h ris W o rle y

L ia iso ns

O ve rsig h t C o m m itteeC h a ir: B lan e T a ylo r

V ice C h a ir: Je ff H e in

CCPG 2012 ORG CHART

Page 6: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 6

CCPG ActivitiesChair

Blane Taylor (Tri-State) 2011-2012

Studies:Work Groups:

Long Range (10-Year) Planning StudyConceptual (>10-year) Planning/Scenario AssessmentSenate Bill 100 StudiesNERC Compliance (TPL Adequacy Study)WECC Data CoordinationVoltage Coordination

Subcommittee Studies (Geographic)Foothills, Western Slope, Denver-metro, etc.

Sub-Regional Project Study ParticipationWCI, HPX, Tot 3, 5, 7 Expansion, Black Hills increased ERZ injection,

Western reliability improvements

Regulatory & Reliability ComplianceFederal, Regional, & State

Page 7: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 7

CCPG 2012 Activites

WestConnect RegionWestConnect 2013 Plan work ongoing

SB100 (State of Colorado) Lamar – Front Range (in planning),Pawnee – Daniels Park 345 KV Line – In Service Date 2019Missile Site 230 kV Switching Station (2010), Midway – Waterton 345 kV Line

(May-2011), Missile Site 345 kV Substation (Jan-2013), Pawnee – Smoky Hill 345 kV Line (Jan-2013)

Colorado Long-Range Transmission Planning Group

DEEP Subcommittee (2010)Douglas, Elbert, El Paso, Pueblo Counties (south-central CO)DEEP Report

Foothills Subcommittee (1980)North-Northwest of Denver Metro AreaFoothills Planning Group Reports

NERC ComplianceSubregional coordination on standards

Page 8: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 8

CCPG 2012 Activities (cont’d)

Conceptual Planning Group20-30 Year Plan3 Resource Scenarios (20-30 year horizon)

1000MW Import/ExportCarbon ReductionHigh load and 30% Renewableshttp://www.westconnect.com/documents_results.php?categoryid=130

Colorado Transmission Planning: Rule 3627 (Dkt# 10R-526E)Utilities 10-year plan & documentation filed by February 1, 2012Due every two years after thatMust include specific information included in Order C11-0492 http://www.westconnect.com/planning_ccpg_10_year_trans_plan.php

COPUC Scenario Analysis: System Reliability (Dkt# 12M-041E)Test resiliency of CO bulk power system5 Scenarios Proposed – 2 or 3 are desiredCOPUC receiving comments Final scenarios due September 2012http://www.westconnect.com/planning_ccpg_10_year_trans_plan.php

Page 9: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 9

On Deck

Joint SWAT-SSPG-CCPG MeetingAugust 22, 2012; Tri-State Offices

CCPG Meeting August 23, 2012; Tri-State Offices

Notices/Materials Posted at: www.westconnect.com

Contacts

Contact Phone Email

Blane Taylor(CCPG Chair)

303-254-6111 [email protected]

Jeff Hein(CCPG Vice-Chair)

303-571-7229 [email protected]

Page 10: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG

Questions / Comments?Questions / Comments?

10

Page 11: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG

SUPPLEMETAL SLIDES

More detailed information on issues presented previously.

Page 12: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 12

CPUC Rule 3627Docket 10R-526E

Requires Regulated Utilities to File 10-Year Transmission Plan10-Year Plan, 2-year cycle, starting Feb 201220-Year Plan, 2 year cycle, starting Feb 2014

Use CCPG as ForumNon-jurisdictional plans provided for information on utility

maintained websiteStakeholder Participation

actively solicit input from stakeholders, including government agencies, to identify alternative solutions

Reporting includes:Methodologies, load forecasts, related studies & reports,

transmission case data, stakeholder comments All Facilities >100kVPUC will hold workshops and a consolidated hearing.

Commission will render a decision regarding the “adequacy” of plans and process

Transmission Planning DecisionTransmission planning Recommended Rules

Page 13: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 13

2012 Study Scopes – Work GroupsWork Group: Long Range Transmission Planning Group

Purpose:Develop Coordinated 10 Year Transmission PlansConsider RPS & up to 30% RenewableConsider New PUC Rules

Work Group: SB100Purpose:

Meet requirements of Colorado Senate Bill 100 Identify “Energy Resource Zones”Plan Transmission to Serve the ERZ’sFile CPCN’s with COPUC

Work Group: Conceptual Planning (on-goingPurpose:

Develop Conceptual Transmission Plans beyond 10 YearsCoordinated with Advisory Group3 Resource Scenarios Evaluated (1)Import/Export of 1000 MW, (2)Carbon Reduction, (3)High Load

Page 14: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 14

2012 Study Scopes – Work GroupsWork Group: NERC Compliance

Purpose:Help Meet NERC TPL-001,2,3,4 RequirementsSteady State, Transient and Voltage PerformanceNear (5 year) & Far (10year) WindowsConsider RPS & up to 30% Renewable

Work Group: Area CoordinationPurpose:

Address Issues associated with preparation of cases for WECC Annual Study Program

Rocky Mountain Area CoordinatorWork Group: Voltage Coordination

Purpose:Prepare Guidelines for System Modeling

Work Group: Short Circuit Data BasePurpose:

Prepare a Short Circuit Data Base

Page 15: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 15

2012 Study Scopes (cont.)Subcommittees

Purpose:Analyze transmission requirements for specific regions within the CCPG

FootprintFoothills, DEEP, Tot 3, Wyoming Joint, Denver-Metro, SECO, SWCO, Front

Range, etcCCPG - Colorado Long-Range Transmission Planning Group |

WestConnect

LiaisonsPurpose:

Provide Information on Other Areas of Interest:OTC, TEPPC, PUC, GEO, etc.

Page 16: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 16

Regional Project Task Forces

High Plains Express InitiativeStage 2 CompletedStage 3 InitiatedWECC Regional Planningwww.highplainsexpress.com

Page 17: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG

PSCo 10-Year Transmission Plan & 20-Year Scenario Assessment

10-Year Transmission Plan & 20-Year Scenario Assessmentwww.oatioasis.com/PSCO/PSCOdocs/PSCO_2011_10-

20_year_plan_Final.pdfCore reliability projects Clean Air Clean Jobs ActSB-100 Transmission Plan (9 proposed projects*)

o Missile Site 230 kV Switching Station (2010), Midway – Waterton 345 kV Line (May-2011), Missile Site 345 kV Substation (Jan-2013), Pawnee – Smoky Hill 345 kV Line (Jan-2013),

o San Luis Valley – Calumet – Comanche Project. CPCN granted Sept 2011. (Project may not be needed based on 2011 ERP)

o Lamar – Front Range (2018-2019) A CPCN may be filed in 2012o Pawnee – Daniels Park 345 KV Line – In Service Date 2019o Lamar – Vilas 230 kV Line – In Service Date TBDo Ault – Cherokee 230 kV Line – In Service Date TBD

Page 18: 1 Colorado Coordinated Planning Group TEPPC Update August 9, 2012.

CCCCCCPPPGGG 18

New Lamar-Comanche 345 kV & Lamar - Missile Site 345 kV ISD 2016

New San Luis Valley-Calumet-Comanche 230 & 345 kV lines ~ ISD 2013

New Midway-Waterton 345 kV ~ISD 2011

New Lamar –Vilas 345 kV ISD 2016

New Pawnee-Daniels Park 345 kV -2nd circuit ~ISD 2016

New Missile Site 230 kV ISD 2010) & 345 kV (ISD 2013)

New Ault-Cherokee 230 kV ~ISD 2015

New Pawnee-Smoky Hill 345 kV, ISD 2013

SB-100 Transmission Plan

CCPG - Senate Bill 100 Colorado