Top Banner

of 24

1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

Jun 01, 2018

Download

Documents

avonsus
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    1/24

    Product Name Confidentiality Level

    G3BSC Confidential

    Product VersionTotal 24 pages

    Baseline Specifications for GSM BSS

    Network Performance KPIs

    (Call Drop Ratio on TCH)

    or internal use only

    Prepare !"#!u "#en$ !C%&' ( GS&Performance )esearc# %ept* Date# 2++,-+.-2/

    Re$iewe !"# Date# yyyy-mm-dd

    Re$iewe !"# Date# yyyy-mm-dd

    %ppro$e !"# Date# yyyy-mm-dd

    H&awei Tec'noloies Co* +t%ll ri'ts reser$e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    2/24

    Ta!le of Contents

    , %!o&t KPI Definition

    0*0 1P Name*****************************************************************************************************************************0*2 1P &eaning*************************************************************************************************************************0*3 )ecommended ormula*******************************************************************************************************

    0*3*0 ormula of t#e BSC32***********************************************************************************************0*3*2 ormula of t#e BSC/+++*******************************************************************************************0*3*3 &easurement Time Points*************************************************************************************** 03

    0*4 t#er %efinition &odes of t#e 1P**************************************************************************************0/0*4*0 1P %efinition of ricsson*********************************************************************************** *****0/0*4*2 1P %efinition of No5ia********************************************************************************************* 0,0*4*3 1P %efinition of Siemens**************************************************************************************** 060*4*4 1P %efinition of &otorola**************************************************************************************** 07

    0*. Suggestions on 1P ptimi8ation***************************************************************************************20

    - KPI Test Met'o--

    . KPI Baseline --3*0 Baseline of Call %rop )atio on TC9 of t#e BSC32*************************************************************223*2 Baseline of Call %rop )atio on TC9 of t#e BSC/+++*********************************************************23

    / Constraint %nal"sis-.4*0 Test &et#od Constraints*****************************************************************************************************234*2 Test nvironment Constraints**************************************************************************************** ****234*3 1P %efinition Constraints********************************************************************************************* *****244*4 Parameter Constraints******************************************************************************************************* 244*. unction Constraints********************************************************************************************************** 2/4*/ nter-1P Constraints**********************************************************************************************************2,4*, Version Constraints************************************************************************************************************ 2,

    0 Baseline Commitments-1

    .*0 Baseline Commitments****************************************************************************************************** 26.*0*0 Baseline Commitments in t#e vent of Net:or5 )elocation************************************26.*0*2 Baseline Commitments in t#e vent of Ne: Net:or5 Construction*************************27.*0*3 )is5 'nalysis************************************************************************************************************27

    2 KPI 3ptimi4ation Means-5

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    3/24

    +ist of 6i&res

    6i&re ,C#annel sei8ure in t#e immediate assignment procedure****************************************03

    6i&re -C#annel sei8ure in t#e assignment procedure*********************************************************03

    6i&re .C#annel sei8ure in t#e internal #andover procedure of t#e BSC*****************************04

    6i&re /C#annel sei8ure in t#e incoming BSC #andover procedure*************************************04

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    4/24

    Re$ision Histor"

    DateRe$ision7ersion

    C'ane Description %&t'or

    2++,-.-2/ V0*+ Completed t#e initial draft* !u "#en

    2++,-/-0/ V0*0 &odified t#e document according to t#e revie:comments*

    !u "#en

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    5/24

    Baseline Specifications for GSM BSS NetworkPerformance KPIs (Call Drop Ratio on TCH)

    Ke"worsCall drop ratio on TC9$ 1P

    %!stract

    T#is document descri;es t#e definition$ test met#od and constraints of t#e call dropratio on TC9*

    %cron"ms an %!!re$iations

    %!!re$iation 6&ll Spellin

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    6/24

    , %!o&t KPI Definition

    T#e 1P is determined ;y t#e name$ meaning and definition* Because t#e BSC32 and t#e

    BSC/+++ #ave difference only in t#e inde< names used in t#e specific calculation formula and donot #ave any difference in t#e measurement time points$ section 0*3=)ecommended ormula>gives t#e calculation formulas of t#e BSC32 and t#e BSC/+++* T#e ot#er contents are t#e samefor ;ot#*

    T#e =current version> descri;ed #ereinafter refers to t#e follo:ing?

    BSC32? G3BSC32V3++)++,C+0

    BSC/+++? BSC/+++V7++)++0

    ,, KPI Name

    Call drop ratio on TC9

    ,- KPI Meanin

    T#e call drop ratio on TC9 reflects t#e ratio of call drops to successful TC9 sei8ures after t#eBSC successfully assigns a TC9 to t#e &S* t can ;e assessed from t:o aspects* ne is toassess t#e pro;a;ility of call drops on all esta;lis#ed TC9s in t#e cell and t#e ot#er is to assesst#e pro;a;ility of call drops on TC9s during call esta;lis#ment of t#e cell*

    T#e call drop ratio on TC9 is an important inde< of t#e call #old type* t indicates t#e pro;a;ility offailure to normally end t#e conversation due to various reasons after t#e &S normally accessest#e TC9* ' too #ig# call drop ratio on TC9 :ill directly influence su;scri;ers@ feeling*

    ,. Recommene 6orm&la

    T#e call drop ratio on TC9 is mostly o;tained t#roug# t#e traffic measurement results or t#roug#t#e drive test* T#e follo:ing formula is recommended for it?

    Call drops on TC9 A Successful TC9 sei8ures*

    ,., 6orm&la of t'e BSC.-

    Call %rop )atio on TC9 including #andover D Call %rops on TC9 E Call %rops on TC9 in Veryarly 'ssignment A Successful TC9 Sei8ures 'll F 0++

    Call %rop )atio on TC9 e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    7/24

    Sta;le State SeIuence rror ECall %rops due to )) N% )eceived on TC9 TC9 in Sta;leState )adio Lin5 ailure E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State9 'ccess ailure E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State &ntervention E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State )adio)esource Hnavaila;le E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le Statet#er Causes E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State )adioLin5 ailure E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State 9 'ccessailure E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State &ntervention E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State )adio)esource Hnavaila;le E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le Statet#er Causes E Call %rops due to )L N% )eceived on TC9 TC9 E Call %rops due to )LN% )eceived on TC99 TC9 E Call %rops due to ';is Terrestrial Lin5 ailure TC9 TC9 ECall %rops due to ';is Terrestrial Lin5 ailure TC99 TC9 E ailed nternal ntra-Cell9andovers Timer

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    8/24

    State )adio Lin5 ailure E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State9 'ccess ailure E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State &ntervention E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le State )adio)esource Hnavaila;le E Call %rops due to )) N% )eceived on TC9 TC9 in Sta;le Statet#er Causes E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State )adioLin5 ailure E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State 9 'ccessailure E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State &ntervention E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le State )adio)esource Hnavaila;le E Call %rops due to )) N% )eceived on TC99 TC9 in Sta;le Statet#er Causes E Call %rops due to )L N% )eceived on TC9 TC9 E Call %rops due to )LN% )eceived on TC99 TC9 E Call %rops due to ';is Terrestrial Lin5 ailure TC9 TC9 ECall %rops due to ';is Terrestrial Lin5 ailure TC99 TC9 E ailed nternal ntra-Cell9andovers Timer

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    9/24

    Cell 9andover )eIuests TC9 06++A07++-7++A6.+ - ailed ncoming

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    10/24

    Eutgoing

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    11/24

    assignment$ t#ere is slig#t difference ;et:een t#e call drop ratio including #andover of t#eBSC32 and t#at of t#e BSC/+++*

    Because t#ere are fe: call drops on TC9 in very early assignment$ t#e call drop ratio on TC9including #andover #as slig#t difference from t#e call drop ratio on TC9 e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    12/24

    6i&re . C#annel sei8ure in t#e internal #andover procedure of t#e BSC

    6i&re / C#annel sei8ure in t#e incoming BSC #andover procedure

    !#ere?

    TC9-SHCCETC9-SHCC-'ETC9-SHCC-BETC9-SHCC-C? Successful TC9 sei8ures all TC9-SHCC-'? Successful TC9 sei8ures TC9-SHCC? Successful TC9 sei8ures in very early assignment

    &easurement time points of t#e call drop ratio on TC9?

    !#en t#e TC9 serving as t#e traffic c#annel is sei8ed$ t#e BTS sends an )))N%C'TN message to t#e BSC ;ecause of TC9 radio lin5 layer connection e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    13/24

    Hpon receipt of t#e message$ t#e BSC starts t#e T)ST'BLS9 timer* T#e BSC starts tomeasure t#e call drop ratio on TC9 after t#e timer e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    14/24

    !#ere?

    TM%)MS? Call drop ratio on TC9 TNM%)P? T#e num;er of call drops on TC9* T#e measurement starts :#en t#e BSC sends

    a CL') )HST message or receives a CL') C&&'N% message t#at carries acause value ot#er t#an =Call Control> or =9andover Success> from t#e &SC* f t#e BSC #asalready sent t#e CL') )HST message ;efore receiving t#e CL') C&&'N%message$ t#e CL') C&&'N% message :ill not ;e counted in t#e num;er of call dropson TC9*

    NMC'LLS? T#e num;er of calls successfully initiated in t#e current cell* t includes t#enum;er of directed retries initiated ;y t#e current cell to ot#er cells and does not include t#enum;er of directed retries initiated ;y ot#er cells to t#e current cell*

    ,/,- %nal"sis

    n t#e formula of ricsson$ t#e numerator also includes t#e CL') C&&'N% message t#atcarries a cause value ot#er t#an =Call Control> or =9andover Success> from t#e &SC* T#erefore$t#e numerator covers more su;-inde

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    15/24

    ,/-- %nal"sis

    n t#e formula of No5ia$ t#e system starts measuring t#e su;-inde

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    16/24

    of successful incoming cell #andovers$ t#e denominator of Siemens formula 2 is eIuivalent tot#e denominator of our formula for t#e call drop ratio on TC9 e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    17/24

    Net:or5 level?

    !#ere?

    %)PMC'LLM)'T? Call drop ratio on TC9 )MLSSSMTC9? Call drops on TC9 due to ) reasons$ including all t#e call drops in t#e

    sta;le state due to ) reasons NT)'MCLLM9NT)'MCLLM9MLST&SO? Call drops in t#e intra-cell #andover

    procedure HTMNT)'MBSSM9HTMNT)'MBSSM9MLST&SO? Call drops in t#e outgoing

    internal inter-cell #andover procedure HTMNT)MBSSM9HTMNT)MBSSM9MLST&SO? Call drops in t#e outgoing

    e

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    18/24

    ,//. S&!stit&te 6orm&la of H&awei

    !#en comparing our call drop ratio on TC9 :it# t#at of &otorola$ :e cannot determine :#ic#su;stitute formula s#ould ;e used ;ecause :e cannot determine t#e specific measurementmet#od of &otorola for t#e call drop ratio on TC9* !e must determine t#e formula to ;e usedaccording to t#e actual formula used for t#e net:or5*

    !#en comparing our call drop ratio on TC9 :it# t#at of &otorola for t#e net:or5s of mo;ilecommunication companies$ :e can use t#e follo:ing formula for t#e cell-level 1P? Call drops onTC9 A Successful TC9 sei8ures all J Successful TC9 sei8ures in very early assignment*

    or t#e BSC-level 1P$ :e can use t#is formula? Call drops on TC9 A Successful TC9 sei8uresall J Successful TC9 sei8ures in very early assignment - Successful internal inter-cell#andovers of t#e BSC*

    or t#e net:or5-level 1P$ :e can use t#e recommended formula*

    T#e su;stitute formula s#ould ;e consistent :it# t#e formula of &otorola for t#e call drop ratio onTC9 for t#e net:or5s of mo;ile communication companies*

    ,0 S&estions on KPI 3ptimi4ation

    'fter comparing our measurement met#od :it# t#e measurement met#ods of competitors for t#ecall drop ratio on TC9$ :e recommend t#at t#e call drops in t#e incoming BSC #andoverprocedure ;e e and 0*4=t#er%efinition &odes of t#e 1P> for details$ and t#e 1P may vary :it# t#e specific calculationformula* T#erefore$ register as detailed su;-inde

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    19/24

    Note? Because different competitors #ave different measurement met#ods$ t#e call drops on TC9do not necessarily correspond one to one :it# t#e CL') )HST messages* T#is met#odonly provides a :ay for us to ma5e preliminary udgment* T#e difference ;et:een t#e t:o valuesdoes not necessarily mean t#at t#e traffic statistics are falsified*

    . KPI Baseline

    ., Baseline of Call Drop Ratio on TCH of t'e BSC.-

    KPI NameClass %Network

    Class BNetwork

    Class CNetwork

    Class DNetwork

    Call drop ratio on TC9including #andover

    +*24 +*.0 +*/6 +*,,

    Call drop ratio on TC9e*

    .- Baseline of Call Drop Ratio on TCH of t'e BSC2888

    KPI NameClass %Network

    Class BNetwork

    Class CNetwork

    Class DNetwork

    Call drop ratio on TC9including #andover

    +*24 +*.0 +*/6 +*,,

    Call drop ratio on TC9e*

    Because at present t#ere are fe: BSC/+++ sites$ t#e ;aseline of t#e BSC32 is used as t#ereference ;aseline* T#e relevant data :ill ;e updated later along :it# t#e increase of sites*

    / Constraint %nal"sis

    /, Test Met'o Constraints

    /- Test 9n$ironment Constraints

    nsure t#at t#e net:or5 optimi8ation #as ;een completed and t#at t#ere is no engineeringconstruction error ;efore t#e test*

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    20/24

    T#e committed ;aseline values cannot ;e guaranteed in t#e follo:ing cases :#en t#e a;oveprereIuisite is satisfied?

    Test 9n$ironment Pro!lem Description

    Coverage

    T#ere are pro;lems suc# as ;lind spots$ lo: coverage level or crosscoverage in t#e test environment$ and suc# pro;lems cannot ;e

    solved ;y net:or5 optimi8ation*T#ere is o;vious cross coverage in t#e test environment*

    nterference

    T#ere is inevita;le interference from ot#er net:or5s or repeaterstations in t#e test environment$ or #ig# freIuency reuse due tofreIuency resource s#ortage$ :#ic# inevita;ly causes severe internalinterference to t#e net:or5*

    TransmissionPoor Iuality of transmission lines suc# as ';is interface lin5s and 'interface lin5s or insta;le transmission lin5s due to various reasons int#e test environment*

    IuipmentPlenty of terrestrial resources are unavaila;le or a lot of eIuipmentfails during t#e test*

    'ntenna and feedersystem

    T#e coverage is poor ;ecause of different pitc# angles of t#e t:oantennas :#en single-polari8ed antenna is used*

    T#e voltage standing :ave ratio !S!) is #ig# due to factors of t#efeeder itself* T#is :ill lo:er t#e transmit po:er and receivingsensitivity$ and cause poor coverage and call drops*

    TrafficT#e actual net:or5 traffic is unevenly distri;uted in t#e testenvironment*

    /. KPI Definition Constraints

    Because competitors and operators may #ave different reIuirements for t#e calculation formulaof t#e call drop ratio on TC9 from us$ :e s#ould carefully analy8e t#e formula differences duringt#e ;id ans:ering process and give an analysis of t#e possi;le impact of suc# differences on t#ecall drop ratio on TC9* )efer to sections 0*3=)ecommended ormula> and 0*4=t#er %efinition&odes of t#e 1P> for details*

    // Parameter Constraints

    !#et#er t#e relevant parameter settings of t#e call drop ratio on TC9 are reasona;le :ill directlyinfluence t#e net:or5 inde

  • 8/9/2019 1. Baseline Specifications for GSM BSS Network Performance KPIs (Call Drop Ratio on TCH)

    21/24

    Parameter Confi&ration Re:&irements

    System messageparameter ta;le? )adio

    lin5 invalidity counter

    f t#e set value is too small$ call drops :ill occur :#en t#e )< level oft#e &S suddenly fades a lot due to reasons suc# as geograp#icalconditions* f t#e set value is too large$ t#e net:or5 :ill ;e una;le torelease relevant resources until t#e radio lin5 times out$ even if t#e

    speec# Iuality is far more unaccepta;le* 's a result$ t#e freIuencyutili8ation :ill ;e lo:ered* !e can set t#is counter to a larger value fort#e ;order areas :it# little traffic and set it to a smaller value for t#eareas :it# #ig# traffic during t#e parameter setting*

    Cell attri;ute ta;le?S'CC9 multiframecount

    ts function is t#e same as t#e radio lin5 invalidity counter*

    System messageparameter ta;le? &Sminimum )< level$)'C9 minimum )