03_OIL AND GAS Mobin (Iran) SW & Cooling Water System The project comprises a cooling water project with intake and outlet culverts, pumping basin and some infrastructure (buildings etc). The main parts of the project are a pumping station basin covering an area of 13,000 m2, an intake culvert structure, approx. 1000 m long, and an outlet culvert approx. 400 m long. The cross section of the culverts is 13 x 5 m. Two 120 m long culvert elements will be constructed in a dry dock in Busher, towed to Asaluyeh and installed on the seabed at 20 - 40 m depth. The remaining part of the culvert was prefabricated in 25 meter long sections, transported by barge to site and lifted into position by a crane barge. KEY NUMBERS Pump basin: 13000 m2 | Intake/outlet culverts: 1400 m | Pumping capacity: 106 m3/s TIME PERIOD 2002 - 2004 CLIENT Sadra/Aker Marine Contractors PROJECT Mobin (Iran) SW & Cooling Water System LOCATION Asaluyeh, Iran PROJECT TYPE Detail Engineering Mobin SW & Cooling Water System | Photo: Multiconsultl