BS Installation
1
Objectives
Upon completion of this module students will know thefollowing:
BS installation
Installation procedure
Shelf installation - Indoor
Outdoor installation
Grounding issues
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
2/15
2
Ver. 09-04-01
Installation Process
Site Survey and
Preparation
Site
Preparation
LOS Evaluation
Site Evaluation
Radio Survey
Base Station
Installation
Base Station
Indoor Unit
Installation
Access Unit
Outdoor Unit
Installation
Subscriber Unit
Installation
Subscriber Unit
Indoor Unit
Installation
Subscriber Unit
Outdoor Unit
Installation
3
Ver. 09-04-01
Site Survey
Check line of sight conditions between the Access unit andSubscriber units
Note: BreezeMax CPE can also associate in Non-LOSconditions
Estimate the distance between the AU and SUs
Map radio interference
Validate the basic environmental conditions
Poles position
Power lines
Grounding
IF cable length
Air conditioning
etc.
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
3/15
4
Ver. 09-04-01
Site Survey - Distance and LOS
Compass
BinocularGPS
Azimuth to BS( )
Distance From BS(Km)
SUName
SUNu.
1.
2.
3.
4.
5.
6.
7.
5
Ver. 09-04-01
Site Survey - Radio Survey
Provide RF spectrum information of the installation site atthe selected frequency range
Antenna Band Pass Filter Amplifier Spectrum Analyzer
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
4/15
6
Ver. 09-04-01
Site Preparation
Verify the following:
Safe and free of obstacle access to the Mast
Mast and ODU are properly grounded
Install antenna mast according to the site plan and site survey
Position the antenna on the mast so that nothing can cross theair link
Rack Preparation
Placement of the rack based on the proposed Shelf location
Preparation of the required screws
Verify existence of grounding bar
-48 VDC power supply
Cable ducting for the following:
IF cable
Power cable
Ethernet cables
Ventilation
Verify proper grounding of all indoor devices
7
Ver. 09-04-01
Site Preparation
Power Distribution Lines for the Shelf
A separate circuit breaker for each PIU
Polarity check
for each cable
AU IDU-ODU IF Cable - according to the specifications
For detailed information about the next slides please refer to the :BreezeMAX TDD Base Station Installation & Maintenance Manual
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
5/15
8"H" Type Antennas Mounting Bracket
H shaped metal barUp to 4 ODUs can be installed
Diversity of 1.3 meters/4.26 feet between Antennas
Designed to be installed on different types of structures:
Monopoles
Masts
Towers
Lightning Rod
ODU
9Types of H adaptors
Mast
Tower Leg
Monopole 3 sectors
Monopole 4 sectors
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
6/15
10Types of H adaptors
DescriptionProductP/NH shaped metal bar, for installation of up to 4 Radios on
the Base Station Tower (Required Adapter).BMAX-BST-H-Kit735218
Lightning protection for installation in H shaped metal barBMAX-BST-H-LP735219
Monopole adapter for H shaped metal bar installation for 3sector 6" - 10"
BMAX-BST-MON-ADA-A735220
Monopole adapter for H shaped metal bar installation for 3sector 10" - 14"
BMAX-BST-MON-ADA-B735221
Monopole adapter for H shaped metal bar installation for 3sector 16" - 20"
BMAX-BST-MON-ADA-C735222
Monopole adapter for H shaped metal bar installation for 3sector 24" - 30"
BMAX-BST-MON-ADA-D735223
Monopole adapter for H shaped metal bar installation for 4sector 10" - 14"
BMAX-BST-MON-ADA-E735224
Monopole adapter for H shaped metal bar installation for 4sector 16" - 20"BMAX-BST-MON-ADA-F735225
Monopole adapter for H shaped metal bar installation for 4sector 24" - 30"
BMAX-BST-MON-ADA-G735226
Tower adapter for H shaped metal bar installation (2" -4")BMAX-BST-TOW-ADA735227
Mast adapter for H shaped metal bar installation (0"-2")BMAX-BST-MAS-ADA735228
11
Ver. 09-04-01
Lightning protection - Grounding
Grounding
Screw
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
7/15
12
Ver. 09-04-01
ODU Positioning
The ODU can be either pole/tower or wall mounted
Easy access to the unit for installation and testing
Installed as close as possible to the antenna (if there is one)
Antenna position make sure coverage will not be affected byenvironmental conditions
For instructions on installing the antenna, refer to themanufacturers manual
Higher antenna placement ,better achievable link quality
The antenna of the Access Unit should be installed so that it willprovide coverage to all Subscriber Units within its service area
Minimum distance between two antennas is 1 meter/3.28 feet
The antenna should be installed to provide a direct, or near line ofsight with the coverage area
13
ODU Installation
The Outdoor Unit can be mounted on a poleusing one of the following methods:
On a pole, using the clamps and threadedrods.
Special clamps and open-ended bolts aresupplied with each unit.
There are two pairs of threaded holes on theback of the unit, enabling the special clampsto be mounted on diverse pole widths
Insert the open ended bolts with the groovespointing outward since these grooves willenable you to use a screwdriver to fastenthe bolts to the unit
Installing an outdoor unit on a pole, usingthe metal bands
Insert the bands into their designated placeat the ODU (at the top and at the bottom)
Attach the bands to the pole by fastening thebands' screw
http://localhost/var/www/apps/conversion/current/tmp/scratch24650/Movies/AU-ODU-TDD-4.1.wmv7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
8/15
14
Ver. 09-04-01
ODU Installation
Use isolation material (such as tar bands) to cover all outdoor connectorsto prevent water penetration into the cables
Using 3M's cold shrink tube 8426-9 as a solution for sealing isrecommended
This solution requires no training or special tools
If you are using the 8426-9 cold shrink, leave a 10 cm/0.32 feet space tokeep the cable flexible
15
Ver. 09-04-01
Other devices installation
GPS and Adaptor
http://localhost/var/www/apps/conversion/current/tmp/scratch24650/Movies/GPS%20-%20Installation.wmv7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
9/15
16
Ver. 09-04-01
Antenna Positioning
When the BS antenna isinstalled outside theboundaries of the roof
The minimum distancebetween the antennaand the railing orbuilding side is 25cm/0.82 feet
The angle between theantenna and the roof is22
25 CM
22
17
Ver. 09-04-01
Antenna Positioning
When the BS antenna isinstalled on a pole ontop of the railing, theantenna is not blockedby anything on the roof,or on adjacent roofs
It is essential tomaintain a minimum
distance of 1.5m/4,92feet between the lowerpart of the antenna andthe top of the roof,fence or railing,whichever is closer tothe antenna
1.5 M
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
10/15
18
Ver. 09-04-01
Antenna Positioning
When the BS antenna is installedon a pole and the pole isinstalled towards the center ofthe roof, the antenna may beblocked by objects on the roof orby the railing or fence
It is essential to maintain aminimum distance between thelower part of the antenna andfence or railing, in order tominimize disturbance of theantennas lobe
The distance to the roofs floorand the fence depends on thedistance of the antenna from therailing
The farther the horizontal distanceof the antenna from the raising,the larger the vertical distance
Blocking object
19
Ver. 09-04-01
BS Antenna Alignment
Identify a reference point on the landscape
Add or subtract 90 to/from the Base Station azimuth
Using the compass, align the outer frame of the antenna
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
11/15
21
Ver. 09-04-01
Base Station IDU Installation
Attach the cable guide to the top panel of the chassis
Install the chassis in a 19" cabinet
Note: For installation in a ETSI rack a suitable adaptors should beinstalled on the chassis
Leave a space of at least 1U between the upper covers of thechassis and other units in the cabinet
Connect the grounding cable to the ground terminal located onthe rear panel of the chassis and
Connect the opposite end of the grounding cable to a ground
connection or to the cabinet
22
Ver. 09-04-01
Base Station IDU Installation
Carefully insert the modules into the relevant slots
Secure the modules in their intended locations
Place blank covers over all of the unused slots
Connect the DATA port of the NPU to the backbone (use astraight Ethernet cable to connect to a hub/switch and a crossfor a router )
Note: The maximum length of the Ethernet cable is 100m/328
feet when operating at 100 Mbps and 70m/230 feet whenoperating at 1 Gbps
If the MGMT port will be used for remote management, connectit to the appropriate data equipment (use a straight Ethernetcable to connect to a hub/switch/ and a cross for a router
Note: The maximum length of the Ethernet cable is 100 m/328feet
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
12/15
23
Ver. 09-04-01
Base Station IDU Installation
Connect the DC power cable to the power jack of the PIU
module If a redundant PIU is installed, connect a DC power cable also
to the second PIU module
Connect the power cord(s) to the -48 VDC power source(s), asfollows:
Connect the black wire to the -48 VDC contact of the power source
Connect the red wire to the + (Return) contact
Connect the ground wire to the ground
Any BS installation using AC-DC converter (rectifier, ups), mustbe approved by electrician for clean AC and DC inputs, includingproper grounding
24
Ver. 09-04-01
Base Station IDU Installation
Connect the IF cable(s)
To avoid transmissions at undesirable frequencies, verify thatthe frequency and bandwidth parameters are properlyconfigured before connecting the IF cables
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
13/15
25
Ver. 09-04-01
Base Station IDU Installation
Each shelf contains the following equipment
BMAX-BST-SH-SP Base Station Chassis
BMAX-BST-AVU Air Ventilation Unit (installed)
BMAX-BST-PIU (1 or 2 per Base Station chassis) Power InterfaceUnit(s)
BMAX-BST-PSU (up to 4 per Base Station chassis) Power SupplyUnit(s)
BMAX-BST-NPU Network Processing Unit
BMAX-BST-AU-IDU (up to 6 per Base Station chassis) Access UnitIndoor Unit(s)
26
Ver. 09-04-01
Base Station IDU Installation
Additional equipment and accessories
Ethernet cable (straight) for connecting the NPU to a Hub/Switch
DC power cable(s) Shielded with 2 10AWG conductors
A ground cable with appropriate terminations for connecting thechassis to the rack
ETSI rack adaptors (if required)
Portable PC for configuring parameters using the Monitor cable
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
14/15
27
Ver. 09-04-01
Base Station IDU Installation
Cable Tray
Mounting
Holes
Mounting
Holes
The cable tray should be installed on the top of the chassis front to enableconvenient routing of cables connecting to power source(s), outdoor unit(s)and other equipment
28
Ver. 09-04-01
Base Station IDU Installation
Hold the ejector levers and insert thecard to its designated place in theshelf
Slide the card fully into its place
Push ejector levers in the innerdirection (towards the card)
A "click" sound indicates that theejector levers are locked and thecard is fully inserted
Fasten the two (or one) captivescrews of the card
7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5
15/15
29
Ver. 09-04-01
Base Station Card Removal
Loosen the two (or one) captivescrews of the requested card
Unlock the ejector levers by pressingthe red button
Pull the ejector levers outwardly(from the card out)
Pull the card out by its ejector leversand remove it from the shelf
Thank you