    BS Installation

    1

    Objectives

    Upon completion of this module students will know thefollowing:

    BS installation

    Installation procedure

    Shelf installation - Indoor

    Outdoor installation

    Grounding issues

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    2/15

    2

    Ver. 09-04-01

    Installation Process

    Site Survey and

    Preparation

    Site

    Preparation

    LOS Evaluation

    Site Evaluation

    Radio Survey

    Base Station

    Installation

    Base Station

    Indoor Unit

    Installation

    Access Unit

    Outdoor Unit

    Installation

    Subscriber Unit

    Installation

    Subscriber Unit

    Indoor Unit

    Installation

    Subscriber Unit

    Outdoor Unit

    Installation

    3

    Ver. 09-04-01

    Site Survey

    Check line of sight conditions between the Access unit andSubscriber units

    Note: BreezeMax CPE can also associate in Non-LOSconditions

    Estimate the distance between the AU and SUs

    Map radio interference

    Validate the basic environmental conditions

    Poles position

    Power lines

    Grounding

    IF cable length

    Air conditioning

    etc.

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    3/15

    4

    Ver. 09-04-01

    Site Survey - Distance and LOS

    Compass

    BinocularGPS

    Azimuth to BS( )

    Distance From BS(Km)

    SUName

    SUNu.

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    5

    Ver. 09-04-01

    Site Survey - Radio Survey

    Provide RF spectrum information of the installation site atthe selected frequency range

    Antenna Band Pass Filter Amplifier Spectrum Analyzer

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    4/15

    6

    Ver. 09-04-01

    Site Preparation

    Verify the following:

    Safe and free of obstacle access to the Mast

    Mast and ODU are properly grounded

    Install antenna mast according to the site plan and site survey

    Position the antenna on the mast so that nothing can cross theair link

    Rack Preparation

    Placement of the rack based on the proposed Shelf location

    Preparation of the required screws

    Verify existence of grounding bar

    -48 VDC power supply

    Cable ducting for the following:

    IF cable

    Power cable

    Ethernet cables

    Ventilation

    Verify proper grounding of all indoor devices

    7

    Ver. 09-04-01

    Site Preparation

    Power Distribution Lines for the Shelf

    A separate circuit breaker for each PIU

    Polarity check

    for each cable

    AU IDU-ODU IF Cable - according to the specifications

    For detailed information about the next slides please refer to the :BreezeMAX TDD Base Station Installation & Maintenance Manual

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    5/15

    8"H" Type Antennas Mounting Bracket

    H shaped metal barUp to 4 ODUs can be installed

    Diversity of 1.3 meters/4.26 feet between Antennas

    Designed to be installed on different types of structures:

    Monopoles

    Masts

    Towers

    Lightning Rod

    ODU

    9Types of H adaptors

    Mast

    Tower Leg

    Monopole 3 sectors

    Monopole 4 sectors

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    6/15

    10Types of H adaptors

    DescriptionProductP/NH shaped metal bar, for installation of up to 4 Radios on

    the Base Station Tower (Required Adapter).BMAX-BST-H-Kit735218

    Lightning protection for installation in H shaped metal barBMAX-BST-H-LP735219

    Monopole adapter for H shaped metal bar installation for 3sector 6" - 10"

    BMAX-BST-MON-ADA-A735220

    Monopole adapter for H shaped metal bar installation for 3sector 10" - 14"

    BMAX-BST-MON-ADA-B735221

    Monopole adapter for H shaped metal bar installation for 3sector 16" - 20"

    BMAX-BST-MON-ADA-C735222

    Monopole adapter for H shaped metal bar installation for 3sector 24" - 30"

    BMAX-BST-MON-ADA-D735223

    Monopole adapter for H shaped metal bar installation for 4sector 10" - 14"

    BMAX-BST-MON-ADA-E735224

    Monopole adapter for H shaped metal bar installation for 4sector 16" - 20"BMAX-BST-MON-ADA-F735225

    Monopole adapter for H shaped metal bar installation for 4sector 24" - 30"

    BMAX-BST-MON-ADA-G735226

    Tower adapter for H shaped metal bar installation (2" -4")BMAX-BST-TOW-ADA735227

    Mast adapter for H shaped metal bar installation (0"-2")BMAX-BST-MAS-ADA735228

    11

    Ver. 09-04-01

    Lightning protection - Grounding

    Grounding

    Screw

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    7/15

    12

    Ver. 09-04-01

    ODU Positioning

    The ODU can be either pole/tower or wall mounted

    Easy access to the unit for installation and testing

    Installed as close as possible to the antenna (if there is one)

    Antenna position make sure coverage will not be affected byenvironmental conditions

    For instructions on installing the antenna, refer to themanufacturers manual

    Higher antenna placement ,better achievable link quality

    The antenna of the Access Unit should be installed so that it willprovide coverage to all Subscriber Units within its service area

    Minimum distance between two antennas is 1 meter/3.28 feet

    The antenna should be installed to provide a direct, or near line ofsight with the coverage area

    13

    ODU Installation

    The Outdoor Unit can be mounted on a poleusing one of the following methods:

    On a pole, using the clamps and threadedrods.

    Special clamps and open-ended bolts aresupplied with each unit.

    There are two pairs of threaded holes on theback of the unit, enabling the special clampsto be mounted on diverse pole widths

    Insert the open ended bolts with the groovespointing outward since these grooves willenable you to use a screwdriver to fastenthe bolts to the unit

    Installing an outdoor unit on a pole, usingthe metal bands

    Insert the bands into their designated placeat the ODU (at the top and at the bottom)

    Attach the bands to the pole by fastening thebands' screw

    http://localhost/var/www/apps/conversion/current/tmp/scratch24650/Movies/AU-ODU-TDD-4.1.wmv
  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    8/15

    14

    Ver. 09-04-01

    ODU Installation

    Use isolation material (such as tar bands) to cover all outdoor connectorsto prevent water penetration into the cables

    Using 3M's cold shrink tube 8426-9 as a solution for sealing isrecommended

    This solution requires no training or special tools

    If you are using the 8426-9 cold shrink, leave a 10 cm/0.32 feet space tokeep the cable flexible

    15

    Ver. 09-04-01

    Other devices installation

    GPS and Adaptor

    http://localhost/var/www/apps/conversion/current/tmp/scratch24650/Movies/GPS%20-%20Installation.wmv
  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    9/15

    16

    Ver. 09-04-01

    Antenna Positioning

    When the BS antenna isinstalled outside theboundaries of the roof

    The minimum distancebetween the antennaand the railing orbuilding side is 25cm/0.82 feet

    The angle between theantenna and the roof is22

    25 CM

    22

    17

    Ver. 09-04-01

    Antenna Positioning

    When the BS antenna isinstalled on a pole ontop of the railing, theantenna is not blockedby anything on the roof,or on adjacent roofs

    It is essential tomaintain a minimum

    distance of 1.5m/4,92feet between the lowerpart of the antenna andthe top of the roof,fence or railing,whichever is closer tothe antenna

    1.5 M

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    10/15

    18

    Ver. 09-04-01

    Antenna Positioning

    When the BS antenna is installedon a pole and the pole isinstalled towards the center ofthe roof, the antenna may beblocked by objects on the roof orby the railing or fence

    It is essential to maintain aminimum distance between thelower part of the antenna andfence or railing, in order tominimize disturbance of theantennas lobe

    The distance to the roofs floorand the fence depends on thedistance of the antenna from therailing

    The farther the horizontal distanceof the antenna from the raising,the larger the vertical distance

    Blocking object

    19

    Ver. 09-04-01

    BS Antenna Alignment

    Identify a reference point on the landscape

    Add or subtract 90 to/from the Base Station azimuth

    Using the compass, align the outer frame of the antenna

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    11/15

    21

    Ver. 09-04-01

    Base Station IDU Installation

    Attach the cable guide to the top panel of the chassis

    Install the chassis in a 19" cabinet

    Note: For installation in a ETSI rack a suitable adaptors should beinstalled on the chassis

    Leave a space of at least 1U between the upper covers of thechassis and other units in the cabinet

    Connect the grounding cable to the ground terminal located onthe rear panel of the chassis and

    Connect the opposite end of the grounding cable to a ground

    connection or to the cabinet

    22

    Ver. 09-04-01

    Base Station IDU Installation

    Carefully insert the modules into the relevant slots

    Secure the modules in their intended locations

    Place blank covers over all of the unused slots

    Connect the DATA port of the NPU to the backbone (use astraight Ethernet cable to connect to a hub/switch and a crossfor a router )

    Note: The maximum length of the Ethernet cable is 100m/328

    feet when operating at 100 Mbps and 70m/230 feet whenoperating at 1 Gbps

    If the MGMT port will be used for remote management, connectit to the appropriate data equipment (use a straight Ethernetcable to connect to a hub/switch/ and a cross for a router

    Note: The maximum length of the Ethernet cable is 100 m/328feet

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    12/15

    23

    Ver. 09-04-01

    Base Station IDU Installation

    Connect the DC power cable to the power jack of the PIU

    module If a redundant PIU is installed, connect a DC power cable also

    to the second PIU module

    Connect the power cord(s) to the -48 VDC power source(s), asfollows:

    Connect the black wire to the -48 VDC contact of the power source

    Connect the red wire to the + (Return) contact

    Connect the ground wire to the ground

    Any BS installation using AC-DC converter (rectifier, ups), mustbe approved by electrician for clean AC and DC inputs, includingproper grounding

    24

    Ver. 09-04-01

    Base Station IDU Installation

    Connect the IF cable(s)

    To avoid transmissions at undesirable frequencies, verify thatthe frequency and bandwidth parameters are properlyconfigured before connecting the IF cables

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    13/15

    25

    Ver. 09-04-01

    Base Station IDU Installation

    Each shelf contains the following equipment

    BMAX-BST-SH-SP Base Station Chassis

    BMAX-BST-AVU Air Ventilation Unit (installed)

    BMAX-BST-PIU (1 or 2 per Base Station chassis) Power InterfaceUnit(s)

    BMAX-BST-PSU (up to 4 per Base Station chassis) Power SupplyUnit(s)

    BMAX-BST-NPU Network Processing Unit

    BMAX-BST-AU-IDU (up to 6 per Base Station chassis) Access UnitIndoor Unit(s)

    26

    Ver. 09-04-01

    Base Station IDU Installation

    Additional equipment and accessories

    Ethernet cable (straight) for connecting the NPU to a Hub/Switch

    DC power cable(s) Shielded with 2 10AWG conductors

    A ground cable with appropriate terminations for connecting thechassis to the rack

    ETSI rack adaptors (if required)

    Portable PC for configuring parameters using the Monitor cable

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    14/15

    27

    Ver. 09-04-01

    Base Station IDU Installation

    Cable Tray

    Mounting

    Holes

    Mounting

    Holes

    The cable tray should be installed on the top of the chassis front to enableconvenient routing of cables connecting to power source(s), outdoor unit(s)and other equipment

    28

    Ver. 09-04-01

    Base Station IDU Installation

    Hold the ejector levers and insert thecard to its designated place in theshelf

    Slide the card fully into its place

    Push ejector levers in the innerdirection (towards the card)

    A "click" sound indicates that theejector levers are locked and thecard is fully inserted

    Fasten the two (or one) captivescrews of the card

  • 7/31/2019 02 - BreezeMAX - Site Installation BS - 09-11-16 - Ver. 4.5

    15/15

    29

    Ver. 09-04-01

    Base Station Card Removal

    Loosen the two (or one) captivescrews of the requested card

    Unlock the ejector levers by pressingthe red button

    Pull the ejector levers outwardly(from the card out)

    Pull the card out by its ejector leversand remove it from the shelf