Top Banner
Visualization Visualization 4013.407 Construction Technology Moonseo Park Associate Professor PhD Associate Professor, PhD 39433 Phone 880-5848, Fax 871-5518 E-mail: [email protected] Department of Architecture College of Engineering Seoul National University 1
49

건설기술 Visualization 2008년2학기 [호환 모드]

Oct 16, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 건설기술 Visualization 2008년2학기 [호환 모드]

VisualizationVisualization

4013.407 Construction Technology

Moonseo ParkAssociate Professor PhDAssociate Professor, PhD

39동 433 Phone 880-5848, Fax 871-5518

E-mail: [email protected]

Department of ArchitectureCollege of Engineeringg g g

Seoul National University

4013.407 Construction Technology 1

Page 2: 건설기술 Visualization 2008년2학기 [호환 모드]

Changes of visual representationChanges of visual representationChanges of visual representationChanges of visual representation

현재…. “이미지의 홍수”현재…. 이미지의 홍수

그림 = 문자 (?)문자 그림

4013.407 Construction Technology 2

Page 3: 건설기술 Visualization 2008년2학기 [호환 모드]

VisualizationVisualizationVisualizationVisualization

상상력

Imagination 이미지를다양하게조립하다.

Visual Communication

정보의대량전달과빠른전달속도정보의대량전달과빠른전달속도

4013.407 Construction Technology 3

Page 4: 건설기술 Visualization 2008년2학기 [호환 모드]

Table of ContentsTable of ContentsTable of ContentsTable of Contents

Visualization in constructionVisualization in construction 1

2 Virtual Reality Virtual Reality

Augmented RealityAugmented Reality 3

4013.407 Construction Technology 4

Page 5: 건설기술 Visualization 2008년2학기 [호환 모드]

Information representationInformation representationInformation representationInformation representation

Text based Information

Diagram based Information

Graphic based Information

D t 2D D i•Document

•Work sheet etc.

•CPM network Diagram

•Barchart etc.

•2D Drawing

•3D Modeling

•4D Modeling etc.

4013.407 Construction Technology 5

Page 6: 건설기술 Visualization 2008년2학기 [호환 모드]

Development of Visual representationDevelopment of Visual representationDevelopment of Visual representationDevelopment of Visual representation

2D

3D

RenderingRendering

Computer generated generated

environment

4013.407 Construction Technology 6

Page 7: 건설기술 Visualization 2008년2학기 [호환 모드]

Computer generated environmentComputer generated environmentComputer generated environmentComputer generated environment

Virtual RealityAugmented VirualityAugmented Reality

Mixed Reality (MR)Mixed Reality (MR)

Real Environment

Virtual Environment

Augmented Reality (AR)

Augmented Virtuality (AV)

4013.407 Construction Technology 7

Page 8: 건설기술 Visualization 2008년2학기 [호환 모드]

Table of ContentsTable of ContentsTable of ContentsTable of Contents

Visualization in constructionVisualization in construction 1

2 Virtual Reality Virtual Reality

Augmented RealityAugmented Reality 3

4013.407 Construction Technology 8

Page 9: 건설기술 Visualization 2008년2학기 [호환 모드]

Virtual realityVirtual realityVirtual realityVirtual reality“A computer generated, interactive, three-di i l i i hi h i dimensional environment in which a person is immersed” (Aukstakalnis and Blatner 1992)

C t g t d th di i l t Computer generated three dimensional scene to provide an adequate level of realismReal time response from the systemReal-time response from the systemImmersed in the virtual environment

4013.407 Construction Technology 9

Page 10: 건설기술 Visualization 2008년2학기 [호환 모드]

Virtual reality in design phaseVirtual reality in design phaseVirtual reality in design phaseVirtual reality in design phase

4013.407 Construction Technology 10

Page 11: 건설기술 Visualization 2008년2학기 [호환 모드]

Virtual reality in constructionVirtual reality in construction phasephaseVirtual reality in constructionVirtual reality in construction phasephase

4D CAD

4013.407 Construction Technology 11

Page 12: 건설기술 Visualization 2008년2학기 [호환 모드]

What is a 4D Modeling?What is a 4D Modeling?What is a 4D Modeling?What is a 4D Modeling?

4D CAD SYSTEM2차원 공정표와 3차원 도면이 연계공사경과기간에 따른 시설물의 완성상태를 VR기술 등으로구현구현

공정표의 시간(Time)과 3D 도면(Space)이 통합구현되는체계

4013.407 Construction Technology 12

Page 13: 건설기술 Visualization 2008년2학기 [호환 모드]

What is a 4D Modeling?What is a 4D Modeling?What is a 4D Modeling?What is a 4D Modeling?

PLAY

4013.407 Construction Technology 13

Page 14: 건설기술 Visualization 2008년2학기 [호환 모드]

4D History4D History4D History4D History

First developed in the EPC industry for industrial projectBechtel 4D modeling software for Hitachi in 1987Commercial 4D products since 1992About seven 4D modeling tools on the market nowMostly deterministic, graphical 4D models

4013.407 Construction Technology 14

Page 15: 건설기술 Visualization 2008년2학기 [호환 모드]

Constructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D Model4D CAD consist of

3D CAD Tools AutoCAD or MicroStation

S h d li T lScheduling ToolsMS Project, Primavera etc.

Tools to link schedule to 3D model Tools to link schedule to 3D model Bently’s Schedule Simulator, Integraph’s Schedule Review etc.

Tools for Virtual Reality Modeling : Cosmo, Superscape, Cortona etc.

4013.407 Construction Technology 15

Page 16: 건설기술 Visualization 2008년2학기 [호환 모드]

Constructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelSchedule Simulator공정표상의액티비티와 3D 도면 객체연결4D 화면 생성

4013.407 Construction Technology 16

Page 17: 건설기술 Visualization 2008년2학기 [호환 모드]

Constructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelKey IssuesIn applying 4D models:

Identify the burning issuesPurpose and level of detail of model

Bring the team together in a timely mannerOrganizational changes neededManagement guidelines needed

Every project has and needs lot’s of project specific detail

F ti lit t h d i l t Functionality to exchange and manipulate data needed

4013.407 Construction Technology 17

Page 18: 건설기술 Visualization 2008년2학기 [호환 모드]

Constructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelConstructing & Maintaining a 4D ModelEssential Features of 3D and 4D tools

Object-basedImport/export CAD objects from multiple platformImport schedule data from multiple project

t t lmanagement toolsExtensible and flexible data visualizationE d i d i l iEasy data maintenance and manipulationEasy-to-use interface for model producers and consumersconsumers

4013.407 Construction Technology 18

Page 19: 건설기술 Visualization 2008년2학기 [호환 모드]

Reasons for 4DReasons for 4DReasons for 4DReasons for 4D

“If you cannot build it virtually, you will not be able to build it in reality.”

Martin Fischer

4013.407 Construction Technology 19

Page 20: 건설기술 Visualization 2008년2학기 [호환 모드]

Reasons for 4DReasons for 4DReasons for 4DReasons for 4D

Can you build the project according to this schedule?Can you build the project according to this schedule?

4013.407 Construction Technology 20

Page 21: 건설기술 Visualization 2008년2학기 [호환 모드]

Reasons for 4DReasons for 4DReasons for 4DReasons for 4DLimitation of CPM schedule

Doesn’t provide any information pertaining to the spatial context and complexities of the project componentscomponents

Hard to identify mistakes (e.g., checking the schedule for its completeness and pcorrectness of logic)

Abstract representation of the project schedule →d t i t t th ti iti t h d th need to interpret the activities to comprehend the

sequenceCause inconsistent interpretations of the Cause inconsistent interpretations of the schedule by different project members

4013.407 Construction Technology 21

Page 22: 건설기술 Visualization 2008년2학기 [호환 모드]

Reasons for 4DReasons for 4DReasons for 4DReasons for 4DWhy 4D?

Communicate designs and schedules betterMake schedules more predictableIntegrate design and construction informationEvaluate constructibility and schedulesResource planningCoordinate trades and site logistics

4013.407 Construction Technology 22

Page 23: 건설기술 Visualization 2008년2학기 [호환 모드]

Reasons for 4DReasons for 4DReasons for 4DReasons for 4D4D Solutions4D models become the visual dashboard that:

Transform complex project data into relevant management informationLink schedule, cost, and resource data to a 3D

j t d lproject modelInteractively show the impact of design or schedule changesschedule changes

4013.407 Construction Technology 23

Page 24: 건설기술 Visualization 2008년2학기 [호환 모드]

Advantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization Tool

Visualizing and Interpreting construction sequencePrevent miscommunication caused by inconsistencies in the interpretation of a scheduleinterpretation of a scheduleImprove collaboration by better perception of the schedule

Conveying spatial constraints of a projectIdentify space-related conflictsSh h i b i b il h d hShow what is being built when and whereDetect a time-space conflict or anticipate an accessibility problem

4013.407 Construction Technology 24

Page 25: 건설기술 Visualization 2008년2학기 [호환 모드]

Advantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization ToolAdvantages of 4D as a Visualization Tool

Pl d fl l b Overhead HAVC

Place second floor slab (Nov. 20)

Install roof(Dec. 7)

rough-in(Nov. 18)

HVAC duct 2nd floor slab Roof

Problems related to the scheduleProblems related to the schedule

• HVAC system was scheduled to be installed before the second floor slab were completed. There would not have been support from which to hang the HVAC ducts• The HVAC and electrical subcontractors are working on the second floor while roof is still being

4013.407 Construction Technology 25

installed. But roof installation is not completed, there is no protection from the weather even though the execution dates are in the winter season.

Page 26: 건설기술 Visualization 2008년2학기 [호환 모드]

Advantages of 4D as a Integration ToolAdvantages of 4D as a Integration ToolAdvantages of 4D as a Integration ToolAdvantages of 4D as a Integration ToolFormalizing Design and Construction Information

• Lack of standardization

BuilderBuilder

in the information →Different interpretation of 2D drawing

• Increase communication •Serve as a BuilderBuildercollaboration tool

4D Model4D ModelDesignerDesigner

I t tiPlannerPlanner

Interaction

4013.407 Construction Technology 26

Page 27: 건설기술 Visualization 2008년2학기 [호환 모드]

Advantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAnticipating Safety Hazard Situations

By viewing 4D model1. Detect areas where accident may occur and execute prevention measures (such as placing warning signs, restricting access, or providing safety guards etc )safety guards, etc.)

2. Perceive how separate crews may affect one another and therefore inadvertently create another and therefore inadvertently create hazardous situation

4013.407 Construction Technology 27

Page 28: 건설기술 Visualization 2008년2학기 [호환 모드]

Advantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAdvantages of 4D as Analysis ToolAnalyze productivity and efficiency

좌측 외벽 창호 설치 공사

C-Channel 작업

지붕 작업

외벽 콘크리트 타설

병행 작업

As-planned schedule

• 작업 여건상 창호공사화 C-Channel 작업불가

• 지붕 작업과 콘크리트타설 병행시 지붕재의낙하 및 타설면 손상가능

4013.407 Construction Technology 28

4D Simulation가능

Page 29: 건설기술 Visualization 2008년2학기 [호환 모드]

Function Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D system일정과도면의 연계스탠포드대학 CIFE (Center for Integrated Facility Engineering)설계 정보 수정시 4D 재구현 어려움설계 정보 수정시 4D 재구현 어려움수정이 필요한 경우 일정정보와 3D모델정보 별도 수정필요

4013.407 Construction Technology 29

3D 모델 + P3 객체모델 연동

Page 30: 건설기술 Visualization 2008년2학기 [호환 모드]

Function Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D system객체모델의연계

VTT (Research Center of Finland)객체모델기반으로구성된파일이용

정보파일 및 환CAD 정보파일공유및호환

4013.407 Construction Technology 30

Page 31: 건설기술 Visualization 2008년2학기 [호환 모드]

Function Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D system진도관리기능의연계

스코틀랜드 Strathclyde 대학 VCSRG (Virtual Construction Simulation Research Group)계획대비일정의진도관리상태를 4D와연동하여계획대비일정의진도관리상태를 4D와연동하여시각적으로표현(색상차이)

4013.407 Construction Technology 31

Page 32: 건설기술 Visualization 2008년2학기 [호환 모드]

Function Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D systemFunction Analysis of current 4D system자원, 비용관리의 연계

VirtualSTEP’s 4D Navigator공정기능과 비용관리 및 유지관리기능 접목

CSA (Construction Systems Associates)액티비티별 물량과 비용 동시에 연계

일정의진행기간을 일, ,주, 달 단위로조정

현재 진 율현재 진도율 47%

4013.407 Construction Technology 32

Page 33: 건설기술 Visualization 2008년2학기 [호환 모드]

Beyond 4DBeyond 4DBeyond 4DBeyond 4DnD CAD

Maintainability Time

3D Model SustainabilityCost

AccessibilityConstructability

This nD construction world encompasses infrastructure, methodologies and technologies that allows users to create, share, contemplate and apply knowledge from multiple perspectives of user requirements allowing construction professionals to perform true what-if analyses at a very early t f j t

4013.407 Construction Technology 33

stage of a project.

Page 34: 건설기술 Visualization 2008년2학기 [호환 모드]

Table of ContentsTable of ContentsTable of ContentsTable of Contents

Visualization in constructionVisualization in construction 1

2 Virtual Reality Virtual Reality

Augmented RealityAugmented Reality 3

4013.407 Construction Technology 34

Page 35: 건설기술 Visualization 2008년2학기 [호환 모드]

What is Augmented Reality?What is Augmented Reality?What is Augmented Reality?What is Augmented Reality?Mixed Reality

Real world objects + Virtual world objects in single display

Enhance the real world by superposing information onto it

Augmented Reality and Augmented Virtuality

AR : An environment wherein digital content (information, graphic) is inserted into the user’s view of a real world scenegraphic) is inserted into the user s view of a real world scene

AV : enhance a virtual world with real world entities

4013.407 Construction Technology 35

Page 36: 건설기술 Visualization 2008년2학기 [호환 모드]

Augmented Reality Augmented Reality --ExampleExampleAugmented Reality Augmented Reality ExampleExample

4013.407 Construction Technology 36

Page 37: 건설기술 Visualization 2008년2학기 [호환 모드]

Augmented Reality Augmented Reality --ExampleExampleAugmented Reality Augmented Reality ExampleExample

Virtual Studio

4013.407 Construction Technology 37

Page 38: 건설기술 Visualization 2008년2학기 [호환 모드]

Augmented Reality TechnologyAugmented Reality TechnologyAugmented Reality TechnologyAugmented Reality Technology

Computer-

Text

Co putegenerated

Information

Text

Indicator

2D Image & Real World+Inserted video

3D wire frame

3D Data3D Data

3D GroupedUni-Object

3D Ungrouped 3D Ungrouped Objects

4013.407 Construction Technology 38

Page 39: 건설기술 Visualization 2008년2학기 [호환 모드]

Augmented Reality TechnologyAugmented Reality TechnologyAugmented Reality TechnologyAugmented Reality TechnologyAR 핵심기술실시간영상처리

3D Graphics실시간모션추적기술실시간 션추적기술

실시간 S/W 개발기술Simulation 기술S t 통합기술System 통합기술

4013.407 Construction Technology 39

Page 40: 건설기술 Visualization 2008년2학기 [호환 모드]

Augmented Reality TechnologyAugmented Reality TechnologyAugmented Reality TechnologyAugmented Reality Technology

Type of visual display

Monitor-based Display

Type of visual display

Video-based see-through Display

Optical-based see-through Display

4013.407 Construction Technology 40

Page 41: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (1)Application in construction (1)Application in construction (1)Application in construction (1)Design and Marketing

Creating a design and evaluating it for function and esthetics, and showing a customer what a

t t ill l k lik i it fi l tti g new structure will look like in its final setting. AR provide the unique opportunity to integrate the design into the real worldthe design into the real world

4013.407 Construction Technology 41

Page 42: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (2)Application in construction (2)Application in construction (2)Application in construction (2)Design phase

Mixed reality AR-CAD in collaboration design in the perspective of spatial cognition.

ModelingComputer:Windows PCA t CAD®

ARComputer:ARToolKitApplicationComputer

HMDCameraAutoCAD®

Plug-inApplicationComputer

NetworkCamera

4013.407 Construction Technology 42

Page 43: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (3)Application in construction (3)Application in construction (3)Application in construction (3)Planning phase

j t i ti t th d t t l i project investigates methods to accurately superimpose (augment) graphical images of construction operations over real-world jobsites

The ability to visualize simulated construction operations in 3D augmented reality can be of significant help in alleviating model engineering problems that affect traditional visualization in virtual reality.

4013.407 Construction Technology 43

Page 44: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (4)Application in construction (4)Application in construction (4)Application in construction (4)During Construction

Visualization whether an actual structure is built in accordance with the design Quick update of work plans after a design change Quick update of work plans after a design change Visualization of consequences of potential design changes before they are agreed upon.

4013.407 Construction Technology 44

Page 45: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (5)Application in construction (5)Application in construction (5)Application in construction (5)During Construction

Progress Monitoring

As-planned As-built s pla ed Schedule

As built Schedule

A b ilt P g

4013.407 Construction Technology 45

As-built Progress

Page 46: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (6)Application in construction (6)Application in construction (6)Application in construction (6)Maintenance and Renovation Renovation

Visualization of hidden information (wires, pipes, beams in a wall)beams in a wall)Visualization of non-graphical information (heat and pressure of pipes, p p p ,maintenance schedules and records, manuals)Visualization of potential

d i (i t i t i ) redesigns (interior, exterior) to evaluate their compatibility with existing structures, and placement of new structure placement of new structure

PLAY4013.407 Construction Technology 46

PLAY

Page 47: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (7)Application in construction (7)Application in construction (7)Application in construction (7)

Computer-generated Information• 3D computer model of the spaceframe • An ordered list of assembly steps • A digitized set of audio files containing instructions for each step

1. Directs the worker to a pile of parts and tells her which part to pick up2. Confirms that she has the correct piece ( by scanning a barcode)3. A 3D virtual image of the component indicates where to install the

component 4 V ifi h h i i ll d b ki h h 4. Verifies that the component is installed by asking her to scan the

component with the tracked barcode scanner

4013.407 Construction Technology 47

Page 48: 건설기술 Visualization 2008년2학기 [호환 모드]

Application in construction (8)Application in construction (8)Application in construction (8)Application in construction (8)

AR Viewing of Underground Utilities

4013.407 Construction Technology 48

Page 49: 건설기술 Visualization 2008년2학기 [호환 모드]

REFERENCEREFERENCEREFERENCEREFERENCE강인석(2002). 건설관리분야 4D시스템의기능분석을통한 활용성개선방안”, 대한건축학회논문집 18(10) 대한건축학회논문집, 18(10) Kamat, V. R., CIC at University of Michigan, Http://pathfinder.engin.umich.edu/index.htm Koo, B.S., and Fischer, M.(2000). Feasibility Study of 4D in Commercial Construction, Journal of Construction Engineering and Management, 126(4) Wang, X., and Dunston, P.S. (2005). Specification for Mapping Mixed Reality Visualization Technology to AEC Tasks, Proceedings of Construction Research Congress: Broadening Perspectives San Diego California 5 7 April 628 632 Broadening Perspectives, San Diego, California, 5-7 April, 628-632 Webster, A. et al.(1996). Augmented Reality in Architectural Construction, Inspection and Renovation, Proc. 3rd Congress on Computing in Civil Engineering, ASCE, Reston, VA, 913-919 Kim, H.E. , “Construction Management By Comparison of Site-Photo and VR image” ,Journal of Korean construction association, 2005, Vol 21, No. 3, pp.137-144Http://www.se.rit.edu/~jrv/research/ar/http://pathfinder engin umich edu/projects htmhttp://pathfinder.engin.umich.edu/projects.htmhttp://www.stanford.edu/group/4DHttp://www.vrstech.co.kr

4013.407 Construction Technology 49