Top Banner
© AgiliX Agile Development Consulting 看 , 看看 看 , 看看 Kan Ban 30 min intro Cesario Ramos
12

看, カン 板, バン Kan Ban

Jan 10, 2016

Download

Documents

chang dags

看, カン 板, バン Kan Ban. 30 min intro Cesario Ramos. Focus on FLOW. Cycle Time = Work In Progress Avg Completion Rate. (Little’s Law). Hand-offs. Delay. Task Switching. Overproduction. Defects. Inventory. Relearning. Seeing WASTE. Why KanBan. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

看 , カン 板 , バン Kan Ban

30 min intro

Cesario Ramos

Page 2: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Page 3: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Focus on FLOW

Cycle Time = Work In ProgressAvg Completion Rate

(Little’s Law)

Page 4: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Overproduction

Delay

Hand-offsTask Switching

Defects

InventoryRelearning

Seeing WASTE

Page 5: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Why KanBan

• By reducing the WIP all kinds of WASTE will emerge.

• Bottlenecks in the process become clear.

• You’ll get an average cycle time.• You’ll get an average wait time.

Page 6: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Scrum v.s. KanBan

• Velocity• Sprint• WIP per sprint• Roles• Cannot

change sprint.• Item must fit

in sprint

• Cycle Time• No timebox• WIP per state • No Roles• Can change at

any time.• No timebox…

Page 7: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting | |

WIP and Cycle Time

Source: M Griffiths

Page 8: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting | |

Bottlenecks

Source: M Griffiths

Page 9: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Page 10: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

One metric to rule them all

Lead Time =

CycleTime *

Work In Progress +

Delay Between Sub-Processes

Page 11: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

Improve Kan Ban bottlenecks using A3

• Lead Time gives us a clear indication for potential wastes.

• Analyze waste to determine current situation

• Specify future state• Find root cause by walking the gemba• Propose counter measures for attacking

root cause.• Make a plan.• Sell it to management.

Page 12: 看, カン     板, バン   Kan        Ban

© AgiliX Agile Development Consulting

看 , カン 板 , バン Kan Ban

30 min intro