© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network Operations Services Edition January 2013
6

© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

Mar 27, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Integration of the Airport into the NetworkBenefits

Integration of the Airport into the NetworkBenefits

Hans KoolenNMOC/CFMUNetwork Operations Services

Hans KoolenNMOC/CFMUNetwork Operations Services

Edition January 2013Edition January 2013

Page 2: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

2© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Improved TOT Prediction – normal operations Improved TOT Prediction – normal operations Improved TOT Prediction – normal operations Improved TOT Prediction – normal operations

Take-Off-Time (TOT) Accuracy

0.00

2.00

4.00

6.00

8.00

10.00

12.0005101520253035404550556065707580859095100105110115120

Time before take-off [min]

Av

era

ge

TO

T [

min

]

with CDM

without CDM (from flightplans only)

60min before take-off

TOT accuracy=9.7

TOT accuracy=8.4

Improvement: 13%

Improvement: 23%

30min before take-off

TOT accuracy 4min

Page 3: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

3© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Take-Off Time (TOT) Accuracy

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

0102030405060708090100110120130140150160170180190200

Time before Take-Off [min]

Ave

rage

diff

eren

ce w

ith A

TOT

[min

]

Accuracy with DPI

Accuracy without DPI

Improved TOT Prediction – adverse conditions Improved TOT Prediction – adverse conditions Improved TOT Prediction – adverse conditions Improved TOT Prediction – adverse conditions

90 min before take-off

TOT accuracy=33.3

TOT accuracy=23.6

Improvement: 29%

Improvement: 54%

30min before take-off

TOT accuracy 5min

EGLL 10/07/2012

Page 4: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

4© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Improved TOT predictions lead to:Improved TOT predictions lead to:

● For the network/NMOC: Improved traffic count predictions Better use of available capacity Improved adjustment of CTOT to requested TOT

● For AOs: Better suitable CTOT Improved Estimated Landing Time prediction

● For Airports: More accurate estimated landing times for inbound flights

● For ANSPs: More accurate traffic count predictions via NMOC data

distribution services

©2011 The European Organisation for the Safety of Air Navigation (EUROCONTROL)

Page 5: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

5© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Variable taxi-timesVariable taxi-times

©2011 The European Organisation for the Safety of Air Navigation (EUROCONTROL)

Taxitime distribution

0

200

400

600

800

1000

1200

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 39 40

Taxitime [min]

Nu

mb

er

of

DP

I

The accurate taxi-time per flight

Page 6: © EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU) Integration of the Airport into the Network Benefits Hans Koolen NMOC/CFMU Network.

6© EUROCONTROL 2013 – Network Management Operations Centre (NMOC/CFMU)

Other Benefits of A-CDM…Other Benefits of A-CDM…

● For the Network: Better use of available capacity Improved adherence to ATFM Slots

● For AOs: Better adjustment of CTOT to local constraints Improved visibility of flights at the outstation Assistance to updating flight plans Enabler for improved flight and fleet planning Reduced risk of suspension by Flight Activation Monitoring Allow to delay and advance the TOBT No more DLA required if flight is delayed by ATC (ground) CTOT freezing from Actual Off-block onwards Improved management of adverse conditions