SOME PICTURESOF PROJECTS

YASHAR POURANG INVOLVED

Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Bulk earthworks, Cut and overcut

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Bulk earthworks, Cut and overcut, adding water to get the optimum moisture

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Trimming Batters, Nuclear Density meter and compaction test

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Nuclear Density meter and compaction testPermeability tests

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Concrete pipes laying & installing headwalls

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Installing double barrel headwalls

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Traffic control and Detour road to install 1800mm road crossing pipes

Tanavob General Contractor (TGC)Earthworks, drainage, concreting and foundation

2008-2011

Tanavob General Contractor (TGC)

Bulk earthworks and excavation; totally: 170,000 m³

Tanavob General Contractor (TGC)

Drainage System to control and conduct underground water, before commencing construction of Foundation

Tanavob General Contractor (TGC)

Completed Drainage System; 2000 m²

Tanavob General Contractor (TGC)

Cleaning concrete and construction of Foundation (Reinforcement and Frame works)

Tanavob General Contractor (TGC)

Construction of Foundation (Reinforcement and Frame works) and commencing of concreting

Tanavob General Contractor (TGC)

Construction of Foundation , concreting

Tanavob General Contractor (TGC)

Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month

Tanavob General Contractor (TGC) Roads and Pavement 2008-2011

Primary excavation and earthworks

Tanavob General Contractor (TGC)

Embankment, road bases and sub-bases, Side walk, pavements and drainage

Tanavob General Contractor (TGC)

Embankment, road bases and sub-bases, Side walk, pavements

Tanavob General Contractor (TGC)

Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³)

Earthworks, excavation and embankment (120,000 m³)Pavement and Sidewalks ( 4,000 m²)

Tanavob General Contractor (TGC)Roads and Pavement

Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after

Tanavob General Contractor (TGC)Roads and Pavement

Satellite pictures of the project (by Google Earth); 6 month after commencing the project

Tanavob General Contractor (TGC)Construction of a 2800 m² Car park

Tanavob General Contractor (TGC) Concrete Structures and Landscaping

Tanavob General Contractor (TGC)

Setting out the foundation and center of columns

Foundation and Columns , Embankments

Tanavob General Contractor (TGC)

Reinforcements of columns

Concrete structure, landscaping and stone works

Persian Gulf Oil CompanyBulk earth work and Oil tank construction 2007-2008

Excavation

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Embankment and leveling

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Drainage and compaction

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Welded above-ground oil tank construction

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008

AAC Group 2004-2007

Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil

AAC Group 2004-2007

Construction of two 16-floor & two 9-floor residential towers

Forming of columns and floors

AAC Group

On-site concrete batching plant & tower cranes

AAC Group

Earthwork and excavation, early 2004 General site view, late 2006Satellite pictures of the project (by Google Earth)