Page 1: Yashar Pourang Portfolio

SOME PICTURESOF PROJECTS

YASHAR POURANG INVOLVED

Page 2: Yashar Pourang Portfolio

Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present

Page 3: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Bulk earthworks, Cut and overcut

Page 4: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Bulk earthworks, Cut and overcut, adding water to get the optimum moisture

Page 5: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Trimming Batters, Nuclear Density meter and compaction test

Page 6: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Nuclear Density meter and compaction testPermeability tests

Page 7: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Concrete pipes laying & installing headwalls

Page 8: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Installing double barrel headwalls

Page 9: Yashar Pourang Portfolio

Tenandra Irrigation Scheme - Macquarie Valley, NSW

Traffic control and Detour road to install 1800mm road crossing pipes

Page 10: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)Earthworks, drainage, concreting and foundation

2008-2011

Page 11: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Bulk earthworks and excavation; totally: 170,000 m³

Page 12: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Drainage System to control and conduct underground water, before commencing construction of Foundation

Page 13: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Completed Drainage System; 2000 m²

Page 14: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Cleaning concrete and construction of Foundation (Reinforcement and Frame works)

Page 15: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Construction of Foundation (Reinforcement and Frame works) and commencing of concreting

Page 16: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Construction of Foundation , concreting

Page 17: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month

Page 18: Yashar Pourang Portfolio

Tanavob General Contractor (TGC) Roads and Pavement 2008-2011

Primary excavation and earthworks

Page 19: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Embankment, road bases and sub-bases, Side walk, pavements and drainage

Page 20: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Embankment, road bases and sub-bases, Side walk, pavements

Page 21: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³)

Earthworks, excavation and embankment (120,000 m³)Pavement and Sidewalks ( 4,000 m²)

Page 22: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)Roads and Pavement

Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after

Page 23: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)Roads and Pavement

Satellite pictures of the project (by Google Earth); 6 month after commencing the project

Page 24: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)Construction of a 2800 m² Car park

Page 25: Yashar Pourang Portfolio

Tanavob General Contractor (TGC) Concrete Structures and Landscaping

Page 26: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Setting out the foundation and center of columns

Foundation and Columns , Embankments

Page 27: Yashar Pourang Portfolio

Tanavob General Contractor (TGC)

Reinforcements of columns

Concrete structure, landscaping and stone works

Page 28: Yashar Pourang Portfolio

Persian Gulf Oil CompanyBulk earth work and Oil tank construction 2007-2008

Excavation

Page 29: Yashar Pourang Portfolio

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Embankment and leveling

Page 30: Yashar Pourang Portfolio

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Drainage and compaction

Page 31: Yashar Pourang Portfolio

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Welded above-ground oil tank construction

Page 32: Yashar Pourang Portfolio

Persian Gulf Oil CompanyBulk earth work and Oil tank construction

Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008

Page 33: Yashar Pourang Portfolio

AAC Group 2004-2007

Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil

Page 34: Yashar Pourang Portfolio

AAC Group 2004-2007

Construction of two 16-floor & two 9-floor residential towers

Forming of columns and floors

Page 35: Yashar Pourang Portfolio

AAC Group

On-site concrete batching plant & tower cranes

Page 36: Yashar Pourang Portfolio

AAC Group

Earthwork and excavation, early 2004 General site view, late 2006Satellite pictures of the project (by Google Earth)