Wideco 3DC Installation Manual

Post on 27-Dec-2015

195 Views

Category:

Documents

44 Downloads

Preview:

Click to see full reader

DESCRIPTION

cable testing

Transcript

WiDetect 3dc cable

WiDetect 3dc for monitoring insulated district cooling pipes

Mounting, inspection and test instruction

M_WiDetect3dcable_uk_2.2

Content Page

M_WiDetect3dcable_uk_2.2

1. Mounting, inspection and

test instruction

Reception inspection at the work site

M_WiDetect3dcable_uk_2.2

Inspection during construction

Loop resistance measurements

Ω

Ω Ω

the cause

should be investigated before connecting wires and measuring continues any further

Note that the contact resistance in connecting terminals are coupled in series and added. An

infinity reading ( ≥ 200 ohm) on the instrument means that the loop is broken.

Recommended instrument:

Ω

Ω

Always use the 0.75 mm slot on the pliers

M_WiDetect3dcable_uk_2.2

Insulation resistance measurements

Ω

Ω

and

that the central wire is unbroken throughout its length.

Ω

Assembling 3dc cable

30 70

6 6

M_WiDetect3dcable_uk_2.2

Technical data, 3dc cable and tape

WiDetect Cable 3dc:

Ω

Ω.

Foam tape:

.

Use only crimping pliers and joint kit approved

by Wideco Sweden during installation.

M_WiDetect3dcable_uk_2.2

M_WiDetect3dcable_uk_2.2

top related