System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Department
Responsibility/Role
File Name 27599115.doc
Revision
Document Generation Date 14/01/2010 14:04:00
Date Modified 1/14/2010 02:04:00 PM
Last Changed by
Status
Viewing the Resource Workbench and Job Workbench forScheduling
Trigger:
Concept
The Job Workbench and Resource Workbench pages provide a visual display of work on the
shop floor and enable you to schedule resources for your requirements. The Job Workbench
provides a job oriented view, while the Resource Workbench displays a resource oriented view.
These tools enable you to:
Filter job and resource information View scheduling information on the Gantt chart
Drag and drop to reschedule
View tool tip and property windows
In this topic, you will view the Job Workbench page and Resource Workbench page for
resource scheduling information.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/14/2010 02:04:00 PM Page 1
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
2/27
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
3/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
2. Click the Resource Workbench link.
Last changed on: 1/14/2010 02:04:00 PM Page 3
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
4/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
3. The Resource Workbench Startup page appears as it connects to the server.
Step Action
4. The Resource Workbench provides a visual display of work on the shop floor by
each performing resource. This enables you to monitor resources, assign alternateresources, or change scheduling.
Page 4 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
5/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
5. Point to the Resource Bar tooltip.
Last changed on: 1/14/2010 02:04:00 PM Page 5
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
6/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
6. The Resource Tooltip page displays job related information for a resource. The
page is displayed by rolling your cursor over a resource bar on the Gantt chart.
Step Action
7. Right-click the Resource Bar option.
Page 6 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
7/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
8. The drop down menu for the resource bar displays available functions andinformation pages to access.
Click the Properties list item.
Last changed on: 1/14/2010 02:04:00 PM Page 7
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
8/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
9. The Resource Properties for Job Operation page has four tabbed regionsGeneral, Operation Quantities, Components, and Sales Order Lines. It displays job
operation information associated with the resource.
Page 8 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
9/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
10. Click the Operation tab.
Step Action11. You can view specific job information for this resource on each tab. The Operation
tab displays quantities in each step.
Click the Close option.
Last changed on: 1/14/2010 02:04:00 PM Page 9
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
10/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
12. Click the Preference button.
Page 10 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
11/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
13. Data display on the Resource Workbench page is controlled by preferences
selected in the Preferencepage. You can select options for the tree display, bardisplay, and scheduling defaults.
Step Action
14. Click the Cancel button.
Last changed on: 1/14/2010 02:04:00 PM Page 11
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
12/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
15. Navigate to the Job Workbench page.
Click the Job Workbench link.
Page 12 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
13/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
16. The Job Workbench Startup page appears as it connects to the server.
Step Action
17. The Job Workbench enables you to view and reschedule jobs and operations,providing a visual job oriented display of work on the shop floor. You can
interactively reschedule jobs, operations, and resources. You can manually control
the rescheduling or let the system automatically schedule.
Last changed on: 1/14/2010 02:04:00 PM Page 13
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
14/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
18. Click the Filter button.
Page 14 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
15/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
19. The Session Filter page enables you to display specific jobs in the tree hierarchy
and Gantt Chart to meet your criteria.
Step Action
20. Click in the Department field.
Last changed on: 1/14/2010 02:04:00 PM Page 15
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
16/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
21. Enter the desired information into the Department field. Enter "ASSEMBLY".
Page 16 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
17/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
22. Click the Immediate Dispatch option.
Step Action
23. Click the OKbutton.
Last changed on: 1/14/2010 02:04:00 PM Page 17
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
18/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
24. Click the Preference button.
Page 18 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
19/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
25. Data display on the Job Workbench is controlled by preferences selected in the
Preference page. You can select options for the tree display, bar display, andscheduling
behavior.
Step Action
26. Click the Assembly list item.
Last changed on: 1/14/2010 02:04:00 PM Page 19
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
20/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
27. Click the Move button.
Page 20 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
21/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
28. Click the Scheduled Quantity list item.
Step Action
29. Click the Move button.
Last changed on: 1/14/2010 02:04:00 PM Page 21
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
22/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
30. Click the OKbutton.
Page 22 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
23/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
31. After saving your preference select scheduled quantity values appear in the tree.
Step Action
32. The Show/Hide Resource Load option is used to display or hide the Select
Resources, and Resource Load Versus Capacity panes on the workbench.
Click the Show/Hide Resource Load button.
Last changed on: 1/14/2010 02:04:00 PM Page 23
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
24/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
33. Click the Select Resources button.
Page 24 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
25/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
34. The Select Resources page is used to define the display on the Resource Load
Versus Capacity pane. The first level nodes contain departments, with asecondary level of any resources that are owned or borrowed by that department.
Step Action
35. Click the Move All button.
Last changed on: 1/14/2010 02:04:00 PM Page 25
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
26/27
System Process DocumentViewing the Resource Workbench and JobWorkbench for Scheduling
Step Action
36. Click the OKbutton.
Page 26 Last changed on: 1/14/2010 02:04:00 PM
8/14/2019 Viewing the Resource Workbench and Job Workbench for Scheduling_SPD
27/27
System Process DocumentViewing the Resource Workbench and Job
Workbench for Scheduling
Step Action
37. The Resource Load Versus Capacity pane shows the load for each resource
selected by your choice of a bar or table view graph.Resource load includes all shop floor demand, not just demand displayed on the
workbench.
Step Action
38. You have completed the Viewing the Resource Workbench and Job Workbench
for Scheduling procedure.