UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss SShheelltteerr PPrrooggrraammmmeess

SSuurrvveeyy 22000000 -- 22001100

UUNNHHCCRR SSuubb--OOffffiiccee VVllaaddiikkaavvkkaazz

uuppddaattee aass oonn 3300 NNoovveemmbbeerr 22001100

UNHCR IP remarks

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010

individual houses new building: RUS48 standard house "turn-key" - - - - - - 22 54 17 14 15 122 15 122 -individual houses new building (non-standard) "self-help" - - - - - 40 - - - - - 40 - - 40 IP: DRCindividual houses new building: RUS48 standard house "self-help" - - - - - - 20 20 20 19 20 99 20 - 99 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - 11 154 218 238 114 62 - - 43 840 - - 840 IP: DRC

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010

individual houses new building: RUS48 standard house "turn-key" - - - - - - - - - - 5 5 5 5 -individual houses rehabilitation: "roof + 1 dry room" "self-help" 820 3968 1506 1502 750 901 113 52 - - - 9612 - - 9612 IP: PIN+DRCindividual houses new building: 48 m² individual house (non-standard) "self-help" - - - - - - - - 29 30 31 90 30 - 90 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - 20 889 222 351 317 - 23 116 1938 130 *) - 1938 IP: DRC+VESTA

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010

individual houses new building (different standards & non-standard) "turn-key" 24 36 70 70 40 7 - - - - - 247 - 240 7 IP: DRCindividual houses new building: RUS48 standard house "turn-key" - - - - - - 7 - - - - 7 5 7 -individual houses new building (different standards & non-standard) "self-help" - - - - - 12 - - - - - 12 - - 12 IP: DRCindividual houses new building: RUS60/RUS63 simplified standard house "self-help" - - - - - - - - - 16 15 31 16 **) 31 IP: DRC (UNTFHS)temporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - - 2 2 22 - - - 7 33 - - 33 IP: DRC

*) 130+37 units -mainly in ChR,

in RI&

in RNOAas well

**) 16 cases - UNHCR IP type of shelterinclusive 369 279 new housesincome - 9612 roof + 1 dry room

generation - 2811 box tentsUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 08.02.2010

2000 - 2010

recapitulation

2000 - 2010

UNHCR Shelter NC

shelter units implementedin all 3 republics (RI, ChR, RNOA)

2000 - 2010

UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in North Ossetia-Alania (RNOA) RNOA# housing units implemented in North Ossetia-Alania

2000 - 2010

UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Chechnya (ChR) ChR# housing units implemented in Chechnya

implementation by

area of reconstruction in NCUNHCR Shelter in North Caucasus 2000 - 2010 (update as on 30 November 2010)

RI# housing units implemented in Ingushetia

UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Ingushetia (RI)by the 3 republics (RI, ChR, RNOA)

detailed breakdown

Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (

indi

vidua

ls)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n 31

/01/20

10 (b

ooks

clos

ed)

UNHCR-RI'09 "turn-key" RUS48 Standard Houses Troitskaya, Karabulak, Yandare, Barsuki, Ekazhevo, Gamurzievo, x x x 14 14 62 x 97(2nd complete assessment; 29/10/'09) Altievo, Nazran, Nasyr-Kort, Kantyshevo, Dolakovo

DRC-RI'09 "self-help" RUS48 Standard Houses Karabulak, Plievo, Barsuki, Gamurzievo, (Surkhakhi), (Ali-Yurt), x x x 16 (19) 1) 16 (19) 88 (107) x by DRC 92(7th complete assessment; 19&25/01/'10) Kantyshevo, Dolakovo, Novy Redant, Zyazykov-Yurt,

Sagopshi, MalgobekDRC-NC'09/'10 "box tents" (improved standard) production line in Troitskaya x x x 160 x by DRC 100

elements production (sets) (workshop assessment; 19/01/'10) (160 sets)

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (

indi

vidua

ls)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n th

e day

of t

he la

test

asse

ssm

ent

UNHCR-RI'10 "turn-key" RUS48 Standard Houses Karabulak, Plievo, Yandare, Ekazhevo, Nasyr-Kort, Nazran, Kantyshevo, x x x 15 15 84 x 28(1st complete assessment; 28/09/'10) Zyazykov-Yurt, Sagopshi, Malgobek

DRC-RI'10 "self-help" RUS48 Standard Houses Karabulak, Plievo, Troitskaya, Sleptsovskaya, Nasyr-Kort, Kantyshevo, x x x 20 20 94 x by DRC 51(2nd complete assessment; 21/10/'10) Dolakovo, Novy Redant, Zyazykov-Yurt, Yuzhny, Malgobek

DRC-RI'10 "box tents" (improved standard) Karabulak, Sleptsovskaya, Nasyr-Kort, Dolakovo, Zyazykov-Yurt, x x x 43 37 174 x by DRC/Vesta 83 2)housing units assembling Sagopshi, Malgobek, Plievo, Altievo, Nazran, Troitskaya 166 of 163+37=200 units:

43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 3 objects inaccessible due to security reasons (in Ali-Yurt & Surkhakhi) 2) as on 30/11/2010

Typeof programme/project of reconstruction approach of beneficiaries

Review 2009Implementation Implementation

Plans 2010

Type Type Number

Type Implementation ImplementationNumber modus

Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR

René Edward Knupfer, Technical Coordinator

Shelter Programmes/Projects in Ingushetia

modusof programme/project of reconstruction approach of beneficiaries

Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (

indi

vidua

ls)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n th

e day

of t

he la

test

asse

ssm

ent

DRC-ChR'09 "self-help" complete rehabilitation of destroyed houses Gudermes, Alkhan-Kala & Stary Achkhoi x x x 11 (12) 1) 11 (12) 58 (67) x by DRC 96(mostly cat. IV) (2nd complete assessment; 11/03/'10)

Urus-Martan x x x 13 13 65 x by DRC 57(2nd complete assessment; 02/12/'09)

Samashki x x x 5 5 27 x by DRC 84(2nd complete assessment; 03/02/'10)

DRC-ChR'09/'10 "box tents" (improved standard) Sernovodsk x x x 34 27 144 x by DRC/Vesta 100 2)housing units assembling (1st assessment - 7 sites; 03/02/'10) (34 of 34 units)

&Grozny, Urus-Martan, Alkhan-Kala, Gekhi, Stary Achkhoi, Novy Sharoi,

Samashki, Yandy, Khambi-Irzi, Zakan-Yurt

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (

indi

vidua

ls)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n th

e day

of t

he la

test

asse

ssm

ent

UNHCR-ChR'10 "turn-key" RUS48 Standard Houses Grozny (Oktyabrsky & Zavodskoy) x x x 5 5 32 x 65(4th complete assessment; 13/10/'10)

DRC-ChR'10 "self-help" complete rehabilitation of destroyed houses 1st package / 1st part: Grozny urban district x x x 13 13 60 x by DRC 45(mostly cat. IV & V, some objects III, II, I) - Grozny-Oktyabrsky & Grozny-Leninsky

(3rd complete assessment; 13/10/'10)1st package / 2nd part: Grozny rural district x x x 5 5 27 x by DRC 32

- Alkhan-Kala(2nd complete assessment; 14/09/'10)

2nd package / 1st part: Urus-Martan district x x x 8 8 33 x by DRC 21- Alkhan-Yurt & Urus-Martan

(2nd complete assessment; 25/08/'10)2nd package / 2nd part: Urus-Martan district & Achkhoi-Martan district x x x 5 5 26 x by DRC 36

- Gekhi, Khambi-Irzi, Novy Sharoi, Achkhoi-Martan(1st complete assessment; 14/09/'10)

DRC-ChR'09/'10 "box tents" (improved standard) Grozny, Sernovodsk, Shalazhi, Shali, Sovkhoz Rodina, Duba-Yurt, x x x 116 99 417 x by DRC/Vesta 83 3)housing units assembling Katar-Yurt, Stary Atagi, Achkhoi-Martan, Urus-Martan, Chechen-Aul, 166 of 163+37=200 units:

Zakan-Yurt, Samashki, Goyskoye, Alkhazurova, Kalinovskaya, Gekhi, 43 in RI, 116 in ChR, 7 in RNOA Roshi-Chu, Tangi-Chu, Gush-Kort, Yarysh-Mardi, Valerik, Prigorodnoe

Khambi-Irzi, Yandy, Serzhen-Yurt, Ulus-KertUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 1 object excluded from programme due to lack of progress (in Stary Achkhoi) 2) as on 31/01/2010, (books closed)

3) as on 30/11/2010

Type Type Number of programme/project of reconstruction approach of beneficiaries

Number

Implementation Implementation

Plans 2010Type Implementation

Shelter Programmes/Projects in North Caucasus 2009/2010René Edward Knupfer, Technical Coordinator

Shelter Programmes/Projects in ChechnyaReview 2009

UNHCR

modus

of programme/project of reconstruction approach of beneficiaries modusType Implementation

Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (

indi

vidua

ls)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n th

e day

of t

he la

test

asse

ssm

ent

UNTFHS-RNOA'09 "self-help" - 1st package : x x x 7 7 34 x DRC 95United Nations Trust Fund for Human Security (UNTFHS), Khataldon 7 sites

sustainable integration & recovery in North Ossetia-Alania RNOA; (7th complete assessment; 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses 2nd package : x x x 9 9 36 x DRC 74

Tsalykovo 1 site, Mairamadag 2 sites, Beslan 4 sites, Vladikavkaz 2 sites(4th complete assessment; 26/08/'10 & 07/09/'10)

Name Location Number Completionof programme/project of programme/project of objects rate

(last update)

indi

vidua

l hou

sing

socia

l hou

sing

com

plet

e (re

)con

stru

ctio

n

exte

nsive

reha

bilit

atio

n

repa

ir

"self

-help

" (m

ater

ial su

pply)

"turn

-key

" (co

ntra

cted

wor

k)

# (ho

uses

)

# (fa

milie

s)

= # (i

ndivi

duals

)

dire

ct

by IP

for d

onor

by IP

/ for

don

or :

agen

cy

% o

n th

e day

of t

he la

test

asse

ssm

ent

UNTFHS-RNOA'10 "self-help" - Brut, Darg-Kokh, Kardzhin, Zmeyskaya, Krasnogor, Ardon, Nart, x x x 16 16 82 x DRC 12United Nations Trust Fund for Human Security (UNTFHS), Dzuarikau, Alagir, Khataldon, Mairamadag, Vladikavkaz

sustainable integration & recovery in North Ossetia-Alania RNOA; (2nd complete assessment; 26/08/'10 & 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses

UNHCR-RNOA'10 "turn-key" …...… (locations not yet defined) x x x ~ 5 ~ 5 nn x ..RUS48 Standard Houses

DRC-RNOA'10 "box tents" (improved standard) Nart, Vladikavkaz, Ardon, Alagir, Dzuzarikau x x x 7 7 40 x DRC 83 1)housing units assembling 166 of 163+37=200 units:

43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) as on 30/11/2010

Type Implementation ImplementationNumber of reconstruction approach of beneficiaries modus

Typeof programme/project

Review 2009Implementation ImplementationType Type Number

of beneficiaries

Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR

René Edward Knupfer, Technical Coordinator

Shelter Programmes/Projects in North Ossetia-Alania

approach modus

Plans 2010

of programme/project of reconstruction

type of shelter implementation

Ing

ush

eti

a (

RI)

Ch

ech

nya (

Ch

R)

No

rth

Oss

eti

a-A

lan

ia (

RN

OA

)

tota

l (R

I +

Ch

R +

RN

OA

)

individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134individual houses new building: RUS48 standard "self help" (SH) 99 99individual houses new building: non standard "self help" (SH) 40 40individual houses new building: RUS60 simplified standard "self help" (SH) 31 31individual houses new building: non standard, 48m² limited "self help" (SH) 90 90individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247individual houses new building: miscellaneous or no standard "self help" (SH) 12 12individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: RUS48 standard "self help" (SH) 99 99

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: non standard "self help" (SH) 40 40

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: RUS60 simplified standard "self help" (SH) 31 31

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: non standard, 48m² limited "self help" (SH) 90 90

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

2000 - 2010 (30/11/'10)

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses new building: miscellaneous or no standard "self help" (SH) 12 12

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612

2000 - 2010 (30/11/'10)

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

type of shelter implementation

RI

Ch

R

RN

OA

tota

l

temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811

UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed

2000 - 2010 (30/11/'10)

UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss

RRUUSS 4488 SSttaannddaarrdd HHoouusseess SShheelltteerr PPrrooggrraammmmee 22000066--22001100

RUS 48 UNHCR Northern Caucasus Standard House

RUS 48 UNHCR Northern Caucasus Standard House

Типовой дом 48

RUS 48 UNHCR Northern Caucasus Standard House

optional house extension

RUS48 UNHCR “Turn-Key” Standard House; 10.00 m x 4.80 m = 48 m² optionally extendable (+ 37 m²) from 48 m² (10.00 m x 4.80 m) to 85 m² :

+ [(3.095 + 0.25 + 3.095 + 0.475) x (0.475 + 4.445 + 0.475)] = + (6.915 x 5.395); the result will be a new L-shaped layout

layout extension partially along front façade (next to entrance/corridor/bedroom), corridor extension (l = 2.30, w = 1.10) & new entrance to corridor extension,

result : additional two bedrooms, extension of foundation, façades & roof construction