Introduction
Plant Layout
Water Source
Coal Handling Plant
Boiler & its Accessories
Turbine
Condenser & Cooling Tower
Awards
References
8/2/2019 TUSHAR NTPC
4/34
Company Profile
NTPC Limited Type : State-owned enterprise
Public (BSE: 532555)
Industry : Electricity generation
Founded : 1975
Address : Kahalgaon Super Thermal Power Project, P.O.Kahalgaon STP,
Distt. Bhagalpur-813214 Bihar
Headquarters : Delhi, India
Key people : Mr. B.R. Prasoon ,Chairman & Managing Director
Product : Electricity Beneficiary States : West Bengal , Bihar , Jharkhand, Orissa , Sikkim
Income 8,837.65 crore (US$ 1.92 billion)(2009-10)
Employees 25,944 (2009)
Website www.ntpc.co.in
4
8/2/2019 TUSHAR NTPC
5/34
INTRODUCTION
NTPC, India's largest power company, was set up in1975 to accelerate power development in India.
Today, it has emerged as an Integrated Power
Major, with a significant presence in the entire value
chain of power generation business.NTPC ranked 317th in the 2009, Forbes Global
2000 ranking of the Worlds biggest companies.
With a current generating capacity of 30,644 MW,
NTPC has embarked on plans to become a 75,000
MW company by 2017.
5
8/2/2019 TUSHAR NTPC
6/34
PRODUCTION:-
Total capacity as on 31.03.2010 Generation 2009-2010
8/2/2019 TUSHAR NTPC
7/34
7
FIRE
BOILERSTEAM
TURBINE
GENERATOR
MAGNET
PRINCIPLE OF GENERATION OF ELECTRICITY
8/2/2019 TUSHAR NTPC
8/34
8
LAYOUT OF THERMAL POWER STATION
8/2/2019 TUSHAR NTPC
9/349
BOILER DRUM
8/2/2019 TUSHAR NTPC
10/34
Water TreatmentPlant
Coal
HandlingPlant
Fuel Oil Plant
Hydrogen
Plant
TurbineGene-rator
Condenser
Switch
Yard
CW
System
Compressed
Air System
AshHandling
Plant
BoiIer
B.F.P.
SUPPORTING SYSTEM
Raw WaterSystem
CT
8/2/2019 TUSHAR NTPC
11/34
GENERAL WORKING OF A THERMALPOWER STATION
1. Coal Handling Plant2. Boiler3. Turbine
4. Generator
11
8/2/2019 TUSHAR NTPC
12/34
Coal Handling Plant (CHP)
CHP is a plant which handles the coal from itsreceipt to transporting it to Boiler and store inBunkers. It also processes the raw coal to make itsuitable for Boiler Opeartion.
In brief we can say that receipt of coal from coalmines, weighing of coal, crushing it to required sizeand transferring the quanta of coal to various coalmill bunkers.
12
8/2/2019 TUSHAR NTPC
13/34
Major auxiliaries of CHP
1. Wagon Tipplers2. Vibrating Feeders3. Conveyor Belts
4. Coal Crushers5. Trippers6. Electromagnetic Separators.7. Dust extraction systems
8. Gas Extractor.
13
8/2/2019 TUSHAR NTPC
14/34
Definition
Wagon Tipplers:-These are the giant machines having gear boxes and motorassembly and are used to unload the coal wagons into coalhoppers in very less time (e.g. 20 wagons/hr. or more).Vibrating Feeders:-
These are electromagnetic vibrating feeders or sometimes inthe form of dragging chains which are provided below thecoal hoppers. This equipment is used for controlled removalof coal from coal hoppers.Conveyor Belts:-
These are the synthetic rubber belts which move on metallicrollers called idlers and are used for shifting of coal from oneplace to other places.
14
8/2/2019 TUSHAR NTPC
15/34
Conveyor Belts
8/2/2019 TUSHAR NTPC
16/34
Coal Crushers:-We receive the coal in the form of odd shaped lumps. Theselumps are to be crushed to required size. These lumps arecrushed by coal crushers.
Trippers:-These are the motorized or manually operated machines andare used for feeding the coal to different coal bunkers as pertheir requirement .Electromagnetic Separators:-
Electromagnets are used for removing of Iron and magneticimpurities from the coal.Dust Extraction System:-This system is provided in CHP for suppression of coal dust incoal handling plant.
16
8/2/2019 TUSHAR NTPC
17/34
Gas Extractors:-Gas extractors are provided at the bunker level toremove all types of poisonous and non poisonousgases from the working area.
17
8/2/2019 TUSHAR NTPC
18/34
Boiler
Boiler is a device for generation of steam for powergeneration. In thermal power stations water tubeboilers are used. Boiler is suspended from the topon four columns and kept free from the bottom side
for free expansion on downward direction.
18
8/2/2019 TUSHAR NTPC
19/34
Fan section
Boiler drum
Reheater
Superheater
Furnace
Economizer
Air Pre Heater
Boiler
8/2/2019 TUSHAR NTPC
20/34
8/2/2019 TUSHAR NTPC
21/34
21
8/2/2019 TUSHAR NTPC
22/34
E.S.P.THEORY:-
The full form of ESP is electro static preceptor .An ESP can be defineed as a device that utilized electrict forces to separate suspandedparticle from flue gasesESP is highly efficient device for extraction of suspended particle andfly ash fromThe industrial flue gases .
WORKING PRINCIPLE :-ESP can handle large volume of gases from which solid particles areto be removed .
ADVANTAGES OF ESP :-
High ash collection efficiency. Low resistance path for gas flow.
8/2/2019 TUSHAR NTPC
23/34
TurbineThe steam turbine generator being rotatingequipment generally has a heavy, large diametershaft. The shaft therefore requires not only
supports but also has to be kept in position whilerunning.
23
8/2/2019 TUSHAR NTPC
24/34
8/2/2019 TUSHAR NTPC
25/34
COOLING TOWER
Cool the warm water discharged fromthe
condenser and feed the cooled water
back to the condenser.
Reduced the cooling water demandIn the plant.
8/2/2019 TUSHAR NTPC
26/34
8/2/2019 TUSHAR NTPC
27/34
CT Bottom area
8/2/2019 TUSHAR NTPC
28/34
Tower Top Deck
8/2/2019 TUSHAR NTPC
29/34
CT Fan Gear Box
8/2/2019 TUSHAR NTPC
30/34
Cooling Tower Fan
8/2/2019 TUSHAR NTPC
31/34
CONCLUSION
Summer training plays a vital & effective role in astudents life no matter whatever respective field he
is working upon & want to expertise his\her skills intheir field.
It is for the student to see & adjust on working culture& environment to a sufficient period of time & tocheck the students adaptability & flexibility.
It gives the practical idea & picture of what we all
have only theoretically gained.Last not the least it provide student a platform to to
shape their knowledge into practical work.
31
8/2/2019 TUSHAR NTPC
32/34
Reference
www.energy.com
NTPC, Kahalgoan.
Power Plant Engineering by P.K. Nag
Power Plant Engineering by Dr. R.Yadav
8/2/2019 TUSHAR NTPC
33/34
8/2/2019 TUSHAR NTPC
34/34
top related