Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
1 of 42
Tank Farm Plant Operating Procedure Ventilation
USQ # TF-18-0717-S, Rev. 0
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
B-8 05/10/2018 Operations request
Added 5.8.1 and 5.8.5 initial/Date per procedure owner.
Added 5.8.1, 5.8.5 to records section per procedure owner
Added initial requirement to checklist 1-7. Per procedure owner
DS1-seperate date/time, removed extra operator signature per
procedure owner. Updated checklist 1 instrument tags and
descriptions.
B-7 09/27/2017 Operations request Page 36, Added "Print" to the signature block for Data Sheet 1
B-6 08/16/2017 Update Procedure to Current
Field Conditions
Changes identified during Periodic Review process. Update
Scope section to include OSD limit. Minor editorial change to
comply with procedure standard.
B-5 05/11/2017 Inconsequential change Inconsequential change for TF-OPS-018.
B-4 12/13/2016 Operations request to correct
erroneous electrical statement.
Added (First and Last) to Printed name places. Changed "Page 1
of..." to "Sheet 1 of...". Replace Hazard risk category 0
statement. Added White label program statement. Page 24:
Deleted reading for POR06-VTP-FSL-184.
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3
1.1 Purpose ................................................................................................................................ 3
1.2 Scope ................................................................................................................................... 3
2.0 INFORMATION............................................................................................................................. 3
2.1 Terms and Definitions......................................................................................................... 3
2.2 General Information ............................................................................................................ 3
3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 5
3.1 Personnel Safety.................................................................................................................. 5
3.2 Equipment Safety ................................................................................................................ 6
3.3 Radiation and Contamination Control ................................................................................ 7
3.4 Environmental Compliance ................................................................................................ 7
4.0 PREREQUISITES .......................................................................................................................... 8
4.1 Special Tools, Equipment, and Supplies............................................................................. 8
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
2 of 42
4.2 Performance Documents ..................................................................................................... 8
4.3 Field Preparations ............................................................................................................... 9
5.0 PROCEDURE ............................................................................................................................... 10
5.1 Initial Start Up POR06 Exhauster ..................................................................................... 10
5.2 Changing Seasons Winter (Winterization Steps) .............................................................. 10
5.3 Changing Seasons Summer (De-winterization Steps) ...................................................... 11
5.4 Startup POR06 Exhauster ................................................................................................. 12
5.5 Operate POR06 Exhauster ................................................................................................ 16
5.6 Shut Down POR06 Exhauster ........................................................................................... 18
5.7 Fill POR06 Glycol Expansion Tank ................................................................................. 19
5.8 Fill Exhauster Seal Pot ...................................................................................................... 20
5.9 Gravity Drain POR06 Seal Pot ......................................................................................... 22
5.10 Records ............................................................................................................................. 23
Checklist 1 – SYSTEM CHECKLIST ...................................................................................................... 25
Checklist 2 – Initial Electrical Lineup ...................................................................................................... 27
Checklist 3 – Initial Valve Lineup ............................................................................................................ 29
Checklist 4 – Initial Thermostat temperatures .......................................................................................... 32
Checklist 5 – Short Term Shutdown Valve Lineup .................................................................................. 33
Checklist 6 – Final Shutdown Valve Lineup ............................................................................................ 34
Checklist 7 – Final Shutdown Electrical Lineup ...................................................................................... 35
Data Sheet 1 – Startup POR06 (Stack 296-P-45) Initial Readings ........................................................... 36
Comments Page 1 ..................................................................................................................................... 38
Figure 1 – T-111 Flow Diagram (ECN-14-000844 Sh 7)......................................................................... 39
Figure 2 - Exhauster Flow Diagram (H-2-829116) .................................................................................. 40
Figure 3 – Exhauster Sample Cabinet Flow Diagram .............................................................................. 41
Signature Sheet 1 ...................................................................................................................................... 42
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
3 of 42
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure provides instructions for startup, normal operation, and shutdown of
portable exhauster POR06.
1.2 Scope
1.2.1 This procedure applies to the POR06 exhauster system and all associated
equipment for operation.
1.2.2 Information is also provided in this procedure for winterization of exhauster
systems using TO-040-744 for ST Team Winterization.
1.2.3 OSD-T-151-00013, Operating Specifications for Single-Shell Waste Storage
Tanks.
2.0 INFORMATION
2.1 Terms and Definitions
SCFM Standard Cubic Feet per Minute
in WG inches Water Gauge
2.2 General Information
2.2.1 There are 3 figures for reference use. Figure 1 provides tank T-111 flow
diagram, Figure 2 provides a POR06 exhauster flow diagram and Figure 3
provides an exhauster sample cabinet flow diagram.
2.2.2 Exhauster system is interlocked to guard against malfunction and possible
contamination release.
2.2.3 Alarms displayed in the ACTIVE ALARMS area of the alarm panel view
PV-101 are acknowledged by first selecting ACKNOWLEDGE ACTIVE
ALARMS/BEACON [F7] or ACKNOWLEDGE GEMS ALARMS [F8]
button, identifying the blinking active alarm, and pressing the function key
assigned to that particular alarm. Each alarm condition has its own unique
acknowledge function key assigned.
2.2.4 In an emergency, the exhaust fan POR06-Fan may be shut down by pressing
the emergency STOP push-button PB-103. Once PB-103 is pushed, breaker
DS-101 will need to be opened to reset shunt trip before continuing.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
4 of 42
2.2 General Information (Cont.)
2.2.5 CAM is interlocked to automatically shut down exhauster on CAM High Rad
and CAM failure alarms which are caused by loss of power to CAM or CAM
low sample flow. Placing CAM in CAM Interlock Bypass Mode prevents
exhauster from shutting down due to these conditions.
Pushing button PB-104 places CAM in CAM Interlock Bypass Mode.
When CAM is in bypass mode, the “CAM BYPASS RESET TO OFF” [F6]
button will be blinking on ACTIVE ALARMS area of alarm panel view
PV-101. If this alarm is showing on the main display (pressing F3 will show
ACTIVE ALARMS display), the CAM may be reset by pressing F6.
2.2.6 Specific steps and/or sections of this procedure may be performed
independently and in any logical order as needed to support
maintenance/training and testing activities when equipment is not physically
attached to a tank or the operation will not impact any tank intrusive zones;
however, FWS, or Shift MGR/OE shall ensure all applicable environmental
requirements are met.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
5 of 42
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
WARNING - Failure to wear leather work gloves or equivalent when working with the
hot glycol system could cause burns when touched.
WARNING - Failure to wear nitrile gloves or equivalent and safety glasses when
handling propylene glycol solution may cause personal injury.
WARNING - The condensate from POR06 seal pot may be contaminated. It is
condensation from ventilation housing. Extreme care must be taken while
performing this section. Contaminated piping and liquid will be present.
Constant Health Physics coverage is required.
3.1.1 Failure to comply with proper valve alignment can result in personnel
contamination from release of contaminated fluid.
3.1.2 Non-electrical worker accessing electrical enclosures must ensure the
following:
The enclosure must have a white label indicating that it has been
evaluated.
The work activity within the enclosure does not involve.
- Reaching around or moving electrical equipment
- Contacting electrical connectors/connections
- By-passing protective shielding/barriers.
3.1.2.1 Stop and notify management if these conditions cannot be met, or
if discrepancies exist (e.g. conflicting or missing labels, missing
or damaged protective barriers).
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
6 of 42
3.1 Personnel Safety (Cont.)
3.1.3 Personnel trained in the operation of breakers and disconnects will wear the
following PPE as a minimum:
Non-melting (untreated natural fiber) long-sleeved shirt
Safety glasses
Leather or insulating gloves
Hearing protection.
3.1.4 Utilize TVIS-T-001 and the appropriate SEG for work in or on the exhauster.
Contact IH for the correct Sample Plan.
3.2 Equipment Safety
CAUTION RF interference may cause POR06 equipment to function improperly or
alarms to activate. Keep all radios and cell phones at least 20 feet away
from POR06 exhauster cabinets and equipment.
CAUTION A low glycol Delta T can result in condensate build up in the duct work
and subsequent failure of the HEPA filters.
3.2.1 To protect structural integrity of the tank, maximum allowable vacuum for an
empty 100-series T-Farm SST is 1.5 inches WG, (OSD-T-151-00013).
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
7 of 42
3.3 Radiation and Contamination Control
3.3.1 When this procedure is worked in radiological areas, an approved
radiological work permit (RWP) is required. If radiological conditions or
work performed falls outside the scope of the RWP, all work activities must
be discontinued until a new or revised RWP has been issued in accordance
with TFC-ESHQ-RP_RWP-C-03.
3.4 Environmental Compliance
3.4.1 Tank Farm ventilation systems and exhaust monitoring systems are regulated
under Washington Administrative Code (WAC) Chapters 173-303, 173-400,
173-401, 173-460, and 246-247 and applicable Notices of Construction
issued to ensure compliance with these regulations. To ensure reporting
requirements are met, all planned and unplanned outages of Tank Farm
ventilation equipment and exhaust monitoring systems, including portable
exhausters, must be immediately reported to Environmental per
Environmental On-Call List. Environmental will determine and make the
required notifications pertaining to ventilation system outages.
3.4.2 POR06 exhauster and stack (296-P-45) monitoring record sampler equipment
and/or CAM outage, both planned and unplanned, must be reported to
Environmental per the Environmental On-Call List.
3.4.3 POR06 is classified as a major stack. A CAM system is required. With the
exception of CAM testing and/or filter paper replacement, exhauster cannot
be run in CAM bypass mode unless environmental permission is obtained.
3.4.4 Immediately report any spills and/or releases to Environmental per TFC-
ESHQ-ENV_FS-C-01, “Environmental Notifications”. This includes
propylene glycol, de-mineralized water, and/or raw water.
3.4.5 The following documents have been referenced during review of this
procedure and controls have been verified to be incorporated into this
procedure:
ALARACT 16, Tank Farm ALARACT Demonstration for Work on
Potentially Contaminated Ventilation System Components.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
8 of 42
4.0 PREREQUISITES
4.1 Special Tools, Equipment, and Supplies
The following supplies may be required to perform this procedure:
Two-way radio
Water container for seal pot and funnel
50/50 mix of propylene glycol and deionized water for glycol system
Water for seal pot.
Seal Pot Fill Port cap tool.
Key for CAM Bypass Switch.
4.2 Performance Documents
The following documents may be required to perform this procedure:
DOE-0359, Hanford Site Electrical Safety Program (HSESP).
ARP-T-351-00006, Respond to Alarms for Portable Exhauster POR06.
TF-OPS-033, SST Daily CAM and Record Sampler Inspections
TF-OPS-018, Inspections and Source Checks of POR06 AMS 4 CAMs and Effluent
Record Samplers
TF-OPS-IHT-002, Perform IHT Flammable Gas Surveillance on Single Shell
Tanks Double Contained Receiver Tanks (DCRTs)
TO-040-540, Water Surveillance and Usage
Propylene glycol GHS-SDS and/or MSDS #038772
TF-OR-DR-ST, ST Daily Rounds
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
9 of 42
4.3 Field Preparations
NOTE - Steps in this section may be performed in any logical order or concurrently.
4.3.1 OBTAIN authorization from the Shift Manager to perform this procedure.
4.3.2 NOTIFY the HPT of exhauster start-up.
4.3.3 NOTIFY Industrial Hygiene Technician of exhauster start-up.
4.3.4 ENSURE all persons participating in the performance of this procedure have
entered their printed name, signature, and initials on the procedure Signature
Sheet 1.
NOTE - Review of equipment checks may be performed by attaching and reviewing a
previous copy of Checklist 1.
4.3.5 COMPLETE/REVIEW Checklist 1.
4.3.6 ENSURE instrumentation listed on Checklist 1 is within current calibration
cycle.
4.3.7 ENSURE Industrial Hygienist is notified 48 hours prior to initial exhauster
start-up.
4.3.8 IF following activities are not current, ENSURE an aerosol test is performed
immediately after startup and/or REPLACE tank breather filter.
Instrument or Component Activity PMID
POR06-VTP-FLT-002, HEPA 1 Aerosol Test WT-006574
POR06-VTP-FLT-003, HEPA 2 Aerosol Test WT-006593
T111-WST-FLT-001, 241-T-111 Replace Radial HEPA Filter WT-106417
NOTE - The following step will enable the glycol heater.
4.3.9 START glycol pump P-001 by positioning hand switch POR06-VTP-HS-102
to ON.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
10 of 42
5.0 PROCEDURE
NOTE - Sections 5.1 through 5.9 in this procedure may be performed independently or in any
logical order at direction of Shift Manager/OE.
5.1 Initial Start Up POR06 Exhauster
5.1.1 IF performing initial startup of POR06 Exhauster, ENSURE thermostat
temperatures on Checklist 4 are complete.
5.2 Changing Seasons Winter (Winterization Steps)
Special Instructions: IF directed by Shift Manager/OE, complete Checklist 4
AND RECORD directions.
NOTE Hand switch POR06-VTP-HS-104 is located in front of
POR06-VTP-ENCL-104.
5.2.1 POSITION hand switch POR06-VTP-HS-104 to WINTER.
NOTE Hand switch POR06-VTP-HS-105 is located in front of
POR06-VTP-CP-105.
5.2.2 POSITION hand switch POR06-VTP-HS-105 to WINTER.
5.2.3 INSTALL vent covers on both the air inlet and outlet of
POR06-VTP-CP-105.
5.2.4 INSTALL vent covers on both the air inlet and outlet of
POR06-VTP-ENCL-301.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
11 of 42
5.3 Changing Seasons Summer (De-winterization Steps)
5.3.1 IF directed by Shift Manager/OE, complete Checklist 4 AND
RECORD directions.
5.3.2 REMOVE vent covers from both the air inlet and outlet of the
POR06-VTP-CP-105.
5.3.3 REMOVE vent covers from both the air inlet and outlet of the
POR06-VTP-ENCL-301.
NOTE - Hand switch POR06-VTP-HS-104 is located on the door of
POR06-VTP-ENCL-104.
5.3.4 POSITION hand switch POR06-VTP-HS-104 to SUMMER.
NOTE - Hand switch POR06-VTP-HS-105 is located on the door of
POR06-VTP-CP-105.
5.3.5 POSITION hand switch POR06-VTP-HS-105 to SUMMER.
NOTE - POR06-VTP-F-104 is located inside POR06-VTP-ENCL-104.
5.3.6 ENSURE POR06-VTP-F-104, is running.
NOTE - POR06-VTP-F-105 is located inside POR06-VTP-CP-105.
5.3.7 ENSURE POR06-VTP-F-105, is running.
NOTE - POR06-VTP-F-106 is located inside POR06-VTP-ENCL-106.
5.3.8 ENSURE POR06-VTP-F-106, is running.
NOTE - POR06-VTP-F-107 is located inside POR06-VTP-ENCL-107.
5.3.9 ENSURE POR06-VTP-F-107, is running.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
12 of 42
5.4 Startup POR06 Exhauster
5.4.1 IF starting POR06 from SHORT TERM SHUTDOWN condition, ENSURE
valve line-up per Checklist 3 is complete.
NOTE - The following step will also enable the glycol heater.
5.4.2 START glycol pump P-001 by positioning hand switch POR06-VTP-HS-102
to ON.
5.4.3 ENSURE fan control hand switch POR06-VTP-HS-103 is in ENABLE
position.
CAUTION
RF interference may cause POR06 equipment to function improperly or
alarms to activate. Keep all radios and cell phones at least 20 feet away
from POR06 exhauster cabinets and equipment.
5.4.4 IF starting sampling system, PERFORM the following:
NOTE - Step 5.4.4.1 will enable Generic Effluent Monitoring Systems
(GEMS) system vacuum pumps to run without exhauster fan
running. This switch will be placed in “Auto Position” in
Step 5.4.13 after exhauster fan is started.
5.4.4.1 ENSURE PUMP CONTROL SELECTOR SWITCH SS-102 is
in Pump 1 or Pump 2 position.
5.4.4.2 ENSURE CAM, RA-301 power switch is positioned to ON.
NOTE - After cycling power switch, CAM may need 3-5 minutes per cycle
to reset.
5.4.4.3 IF CAM High Rad alarm actuates, CYCLE CAM power switch
RA-301 a maximum of three (3) times.
5.4.4.4 IF CAM High Rad alarm will not clear after cycling power
switch three (3) times, NOTIFY Shift Manager CAM requires
repair.
a. GO TO Section 5.6 to shut down POR06 Exhauster.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
13 of 42
5.4 Startup POR06 Exhauster (Cont.)
5.4.5 ACKNOWLEDGE each alarm displayed on PV-101 by identifying blinking
active alarm and pressing function key assigned to that particular alarm. (See
alarm response procedure, ARP-T-351-00006).
5.4.6 IF exhauster was shut down due to record sampler issues,
ENSURE inspection and flow rates of Record Sampler per
TF-OPS-033,
OR
ENSURE TF-OPS-033 has been successfully performed that
calendar day.
5.4.6.1 IF CAM sampler pumps or Record Sampler fail inspection,
NOTIFY Shift Manager.
5.4.7 IF exhauster is to be started without CAM in bypass mode, OBTAIN
permission to start POR06 from Shift Manager AND
GO TO Step 5.4.10.
5.4.8 PLACE CAM into Bypass Mode, PERFORM the following:
NOTE - If AP-001(Alarm Panel) is showing main display (photograph of
exhauster), pressing F3 will show ACTIVE ALARMS display.
5.4.8.1 ENSURE main display screen is selected (photograph of
exhauster) AND
PRESS F3.
NOTE - The exhauster is interlocked to automatically shut down on CAM
High Rad and CAM failure alarms which are caused by loss of
power to CAM or CAM low sample flow. Placing CAM in CAM
Interlock Bypass Mode will prevent the exhauster from shutting
down on any of these alarms.
- To place CAM in CAM Interlock Bypass Mode, CAM bypass
push button, PB-104, is pushed. When CAM interlock in activated,
CAM BYPASS RESET TO OFF [F6] button will be blinking on
ACTIVE ALARMS area of alarm panel view PV-101.
5.4.8.2 PRESS AND HOLD PB-104 CAM bypass pushbutton until
CAM BYPASS RESET TO OFF [F6] is blinking on ACTIVE
ALARMS area of alarm panel view AP-001.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
14 of 42
5.4 Startup POR06 Exhauster (Cont.)
5.4.9 ENSURE HMI “Indicators” screen (F8) is displayed to monitor data during
start up.
CAUTION
A low glycol Delta T can result in condensate build up in the duct work
and subsequent failure of the HEPA filters.
NOTE - Heater was enabled in Step 5.4.2 when glycol pump P-001 was started.
5.4.10 START exhaust fan EF-001 as follows:
5.4.10.1 ENSURE glycol fluid is hot (ran within last 2 hours), or glycol
heater has been enabled for at least 30 minutes before starting
exhaust fan.
5.4.10.2 PRESS STOP push-button PB-102 to reset variable frequency
drive program.
5.4.10.3 PRESS START push-button PB-101.
5.4.10.4 ENSURE RED ILRUN light is illuminated.
5.4.11 IF directed by Shift Manager/OE, PRESS F6 to place CAM in operation.
5.4.12 IF exhauster will not stay running, PERFORM the following:
5.4.12.1 STOP AND CHECK for alarm conditions on alarm panel view
PV-101 AND
ACKNOWLEDGE alarm(s) per ARP-T-351-00006 as
necessary.
5.4.12.2 ATTEMPT a second restart by performing Steps 5.4.9 through
5.4.10.4.
5.4.12.3 IF second attempt is unsuccessful, NOTIFY Shift Manager/OE
for further directions.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
15 of 42
5.4 Startup POR06 Exhauster (Cont.)
NOTE - The pump control selector switch SS-102 must be placed in the AUTO position
in order for the GEMS totalizers to run properly.
5.4.13 ENSURE pump control selector switch SS-102 is in “Auto” position.
5.4.14 NOTIFY HPT to perform an inspection of CAM and Record Sampler per
TF-OPS-018, TF-OPS-033.
5.4.15 IF CAM sampler pumps or Record Sampler fails inspection, NOTIFY Shift
Manager.
5.4.16 NOTIFY Shift Manager/OE, TMACS, and HPT that POR06 ventilation
system is running.
5.4.17 IF Tank Vacuum exceeds Maximum Allowable Vacuum in PDI-170 data
block of Data Sheet 1 PERFORM the following:
5.4.17.1 IMMEDIATELY PRESS STOP pushbutton PB-102 to
shutdown exhauster.
5.4.17.2 NOTIFY Shift Manager/OE, TMACS, and HPT that POR06
ventilation system is not running.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
16 of 42
5.5 Operate POR06 Exhauster
NOTE - Heater was enabled in Step 5.4.2 when glycol pump P-001 was started.
- Exhauster may take up to one-hour of operation for heater temperature
differential to reach 20F.
- Steps in section 5.5 may be performed in any logical order.
5.5.1 CONFIRM heater outlet temperature is at least 20F higher than heater inlet
temperature, as measured between temperature indicator TI-183 and inlet
temperature indicator TI-176.
5.5.2 IF above condition is not met, NOTIFY Shift Manager/OE heater thermostat
TS-206 requires adjustment.
5.5.3 COMPLETE Data Sheet 1 and the following steps upon startup:
5.5.3.1 VISUALLY INSPECT Seal Pot drain line system for leaks.
5.5.3.2 IF inspection finds no leaks in system, PLACE a check () in
READING box in Data Sheet 1.
5.5.3.3 IF inspection of Seal Pot is unsatisfactory, RECORD inspection
findings on Comments Page 1 AND
REQUEST Shift Manager to notify Environmental On-Call
person and DA HVAC engineer.
5.5.3.4 VISUALLY INSPECT entire duct work to all tanks connected
to POR06 exhauster, HEPA housing, fan, flexible connections
and stack AND
IF inspection finds duct work to be satisfactory, PLACE a check
() in READING box in Data Sheet 1.
5.5.3.5 IF inspection of entire duct work is unsatisfactory, RECORD
inspection findings on Comments Page 1 AND
REQUEST Shift Manager to notify Environmental On-Call
person and DA HVAC engineer.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
17 of 42
5.5 Operate POR06 Exhauster (Cont.)
NOTE - Normal Seal Pot operating range is 35% - 75%.
5.5.4 IF seal pot level is less than 35% volume, as indicated on sight glass LG-101
or alarm panel view PV-101, LI-195, FILL seal pot SP-001 with water per
Section 5.8.
5.5.5 IF seal pot level is greater than or equal to 75% by Data Sheet 1, DRAIN
seal pot per Section 5.9.
NOTE - Normal operating glycol tank level range is 40%.
WARNING
Failure to wear leather work gloves or equivalent when working with
the hot glycol system could cause burns when touched.
5.5.6 DON leather gloves or equivalent.
5.5.7 IF glycol tank level, as indicated on LG-201,or alarm panel view PV-101,
GLYCOL LEVEL (PERCENT FULL), is less than or equal to 40%, FILL
glycol tank with a mixture of 50% de-ionized water and 50% propylene
glycol per Section 5.7.
5.5.8 IF exhauster shuts down unexpectedly, NOTIFY the following:
Shift Mgr/OE
TMACS
HPT.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
18 of 42
5.6 Shut Down POR06 Exhauster
5.6.1 IF an emergency condition exists, PERFORM the following:
5.6.1.1 PRESS EMERGENCY STOP push-button PB-103 to shut down
exhaust fan EF-001.
5.6.1.2 NOTIFY the following that POR06 ventilation system has been
shut down.
Shift Manager/OE
TMACS
HPT.
NOTE - Non-emergency shutdown of POR06 ventilation system is performed only at
direction of Shift Manager/OE.
5.6.2 IF directed by Shift Manager/OE, SHUT DOWN exhaust fan EF-001:
5.6.2.1 STOP glycol pump by positioning hand switch
POR06-VTP-HS-102 to OFF.
5.6.2.2 PRESS STOP push-button PB-102 to shut down exhaust
fan EF-001.
5.6.2.3 PLACE fan control hand switch POR06-VTP-HS-103 to OFF.
5.6.2.4 NOTIFY Shift Manager/OE, TMACS, and HPT POR06
ventilation system has been shut down.
NOTE - Shift Manager/OE will specify if POR06 ventilation system will be in SHORT
TERM SHUTDOWN or FINAL SHUTDOWN.
5.6.3 IF exhauster is to be shutdown to SHORT TERM SHUTDOWN from current
active running state, PERFORM valve line-up per Checklist 5.
5.6.4 IF exhauster is to be shutdown to FINAL SHUTDOWN from current active
running state, PERFORM Checklist 6 and Checklist 7.
5.6.5 IF exhauster will not be started again, ENSURE HPT removes filter papers
from the record sampler per TF-OPS-018.
5.6.6 ACKNOWLEDGE all alarms in ACTIVE ALARMS area of alarm panel
view PV-101 per ARP-T-351-00006.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
19 of 42
5.7 Fill POR06 Glycol Expansion Tank
NOTE - This Section is performed if glycol level is 40%.
WARNING
Failure to wear nitrile gloves or equivalent and safety glasses when
handling propylene glycol solution may cause personal injury.
5.7.1 IF glycol level is 40%, DON appropriate PPE:
Nitrile Gloves or equivalent
Safety Glasses.
5.7.2 LIFT Fill Port located on top of glycol expansion tank TK-001.
5.7.3 ADD a mixture of 50% de-ionized water and 50% propylene glycol to glycol
expansion tank TK-001 until glycol sight glass LG-201 or alarm panel view
PV-101, GLYCOL LEVEL (PERCENT FULL), reads approximately
50- 60%.
5.7.4 CLOSE Fill Port on glycol expansion tank, TK-001.
5.7.5 IF any de-ionized water or propylene glycol is spilled, NOTIFY Shift
Manager to contact Environmental per On-Call List to inform them of event
and amount.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
20 of 42
5.8 Fill Exhauster Seal Pot
NOTE - This Section is performed if seal pot level is below 35% per Data Sheet 1 or as
directed by Shift Mgr/OE.
- Valve POR06-VTP-V-158 needs to be opened to allow seal pot to equalize line
pressures.
5.8.1 RECORD position of the following valves below.
Valve Number Position
INITIALS /DATE Open () Closed ()
POR06-VTP-V-158
POR06-VTP-V-160
5.8.2 ENSURE valve POR06-VTP-V-158 is OPEN.
5.8.3 ENSURE valve POR06-VTP-V-160 is OPEN.
5.8.4 ENSURE valve POR06-VTP-V-168 is positioned towards SEAL POT.
5.8.5 RECORD position of the following valves below PRIOR to filling.
Valve Number Position
INITIALS /DATE Open () Closed ()
POR06-VTP-V-169
POR06-VTP-V-170
5.8.6 ENSURE valve POR06-VTP-V-169 is OPEN.
5.8.7 ENSURE valve POR06-VTP-V-170 is OPEN.
NOTE - A fill port cap tool may be needed to remove the cap.
5.8.8 REMOVE fill port cap.
5.8.9 OPEN valve POR06-VTP-V-162.
5.8.10 FILL seal pot SP-001 with water in 2 gallon increments to verify change in
level until seal pot sight glass LG-101, or alarm panel view PV-101, LI-195,
approx. 50-60%.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
21 of 42
5.8 Fill Exhauster Seal Pot (Cont.)
5.8.11 CLOSE valve POR06-VTP-V-162.
NOTE - A fill port cap tool may be needed to tighten the cap.
5.8.12 REPLACE fill port cap.
NOTE Valves may be orientated per direction of OE/Technical System Engineer.
5.8.13 ENSURE after seal pot addition close POR06-VTP-V-158 is CLOSED.
5.8.14 IF any liquid is spilled or overflowed, NOTIFY Shift Manager to contact
Environmental per On-Call List to inform them of event and amount of spill.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
22 of 42
5.9 Gravity Drain POR06 Seal Pot
WARNING
The condensate from POR06 seal pot may be contaminated. It is
condensation from ventilation housing. Extreme care must be taken
while performing this section. Contaminated piping and liquid will be
present. Constant Health Physics coverage is required.
Special Instructions
Under FWS/OE direction activities within Section 5.9 of this procedure may be
performed or not performed if seal pot level is above 75% per Data Sheet 1.
NOTE - The ventilation system may need to be placed in STANDBY SHORT TERM
SHUTDOWN to drain the seal pot. The seal pot is under vacuum when the
ventilation system is running and may not fully drain if the ventilation system
is running.
5.9.1 IF directed by FWS/Shift Manager/OE, SHUT DOWN POR06 ventilation
system per Section 5.6.
5.9.2 NOTIFY HPT for radiological monitoring and survey assistance during this
task.
5.9.3 ENSURE valve POR06-VTP-V-160 is OPEN.
5.9.4 ENSURE valve POR06-VTP-V-158 is CLOSED.
5.9.5 ENSURE POR06-VTP-PNL-101 breaker 2 is in the ON position.
5.9.6 ENSURE valve POR06-VTP-V-164 is CLOSED.
5.9.7 ENSURE valve POR06-VTP-V-163 is CLOSED.
5.9.8 ENSURE valve POR06-VTP-V-165 is CLOSED.
5.9.9 ENSURE valve POR06-VTP-V-166 is CLOSED.
5.9.10 ENSURE valve POR06-VTP-V-171 is OPEN.
5.9.11 ENSURE valve POR06-VTP-V-172 is CLOSED.
5.9.12 ENSURE valve POR06-VTP-V-161 is OPEN.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
23 of 42
5.10 Records
5.10.1 PERFORM the following for records identified within this procedure.
5.10.1.1 RECORD the number of times the record was generated in
applicable column,
OR
PLACE a check mark () in the N/A column.
Records Submittal Checklist
Number
of times
completed
N/A
()
Steps
Step 5.8.1
Step 5.8.5
Checklists
Checklist 1 – SYSTEM CHECKLIST
Checklist 2 – Initial Electrical Lineup
Checklist 3 – Initial Valve Lineup
Checklist 4 – Initial Thermostat temperatures
Checklist 5 – Short Term Shutdown Valve Lineup
Checklist 6 – Final Shutdown Valve Lineup
Checklist 7 – Final Shutdown Electrical Lineup
Data Sheets
Data Sheet 1 – Startup POR06 (Stack 296-P-45) Initial Readings
Comments Page
Comments Page 1
Signature Sheet
Signature Sheet 1
FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for
records retention.
/ /
Signature Print (First and Last) Date
FWS/OE/Shift Manager
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
24 of 42
5.10 Records (Cont.)
5.10.1.2 SUBMIT the package to the Central Shift Office.
PM Data Sheets associated with the procedure, are records and are
maintained in the work package as record material.
The record custodian identified in the Company Level Records Inventory and
Disposition Schedule (RIDS) is responsible for record retention in
accordance with TFC-BSM-IRM_DC-C-02.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
25 of 42
Checklist 1 – SYSTEM CHECKLIST
(Sheet 1 of 2)
Instrument Description
Calibration
Next Due
Date
Initials Date
POR06-VTP-RE-301/VTP-RA-301
(WT-006596) AMS-4 CAM Alarm/Interlock Function Check
POR06-VTP-RE-301/VTP-RA-301
(WT-105072) AMS-4 CAM Quarterly Source Check
T111-WST-FLT-101
(WT-106417) T-111 Replace Inlet Breather HEPA *
T111-VT-DMPR-001
(WT-200081) T-111 Vacuum Relief Valve Check
POR06-VTP-FLT-002-CLO
(WT-006574) Exh 1st HEPA 1 Aerosol Test *
POR06-VTP-FLT-003-CLO
(WT-006593) Exh 2nd HEPA 2 Aerosol Test *
POR06-VTP-PDT-170
(WT-006578) PDT Cal of Plenum Inlet
POR06-VTP-PDT-177
(WT-006575) Heat Exchange PDT Cal
POR06-VTP-PDT-178
(WT-006594) Prefilter DP Transmitter Calibration
POR06-VTP-PDT-180
(WT-006568) 1st PDT Cal of HEPA Filter 1
POR06-VTP-PDT-182
(WT-006567) 2nd PDT Cal of HEPA Filter 2
POR06-VTP-PDT-181
(WT-006566) PDT Cal of HEPA Filter 1 and 2 Total
POR06-VTP-FT-184
(WT-006587) ANSI N13.1 Exhaust Stack Flow Transmitter Cal *
POR06-VTP-EF-001
(WT-200663) POR06 Exhaust Fan Inspection
POR06-VTP-LT-195
(WT-105295) Seal Pot Liquid Level Transmitter Cal (Yokagawa)
POR06-VTP-FCV-301
(WT-006584)
ANSI N13.1 RECORD Sample Flow Control
Valve Cal *
POR06-VTP-FCV-302
(WT-006583) ANSI N13.1 AMS-4 CAM Flow Control Valve Cal
POR06-VTP-RA-301/VTP-RE-301
(WT-006573) AMS-4 CAM Field Installation *
(Continued on Next Page)
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
26 of 42
Checklist 1 – SYSTEM CHECKLIST (Cont.)
(Sheet 2 of 2)
Instrument Description
Calibration
Next Due
Date
Initials Date
296-P-45
(WT-009076) ANSI N13.1 Stack Air Flow Test
POR06-VTP-YYC
(WT-009070) ANSI N13.1 PLC Clock Check*
POR06-VTP-FCV-301
(WT-009073) ANSI N13.1 Record Sample Flow Check
POR06-VTP-FCV-302
(WT-009072) ANSI N13.1 CAM Indicator Check
POR06-VTP-FTP-184
(WT-009074) ANSI N13.1 Stack Flow Indicator Check
POR06-VTP-TP-301
(WT-009071) ANSI N13.1 Sample Transport System Inspection
POR-06-VTP-CP-105
(WT-200735) T Farm Enclosures Clean/Inspect
RTRVL-CORD-POR06
(WT-200174) Quarterly Cord Check
COMMENTS:
Special Instructions:
* IF calibration is not current, PERFORM the following:
RECORD in Comments
NOTIFY Shift Manager/OE to determine if exhauster operation may proceed.
IF directed by Shift Manager/OE to proceed, REQUEST functional test/PM/activity be performed immediately after startup.
IF any preventative maintenance requires exhauster to run, IT IS ACCEPTABLE to start exhauster for the purposes of performing
those maintenance data sheets.
REVIEW of equipment checks after the initial verification may be performed by attaching and reviewing a previous copy of
Checklist 1.
IF the instrument being checked is inoperable, RECORD in Comments AND
NOTIFY OE and Engineering.
/ / /
Signature Print (First and Last) Date/Time
Shift Manager /OE
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
27 of 42
Checklist 2 – Initial Electrical Lineup
(Sheet 1 of 2)
Component # Description Position Check
() Initials Date
POR06-VTP-
MTS-108 Power Supply Transfer Switch Hardware
POR06-VTP-DS-101 Portable Exhauster Skid Power ON
POR06-VTP-DS-102 Exhaust Fan Motor 001 Supply Disconnect
Switch ON
POR06-VTP-DS-201 Glycol Heater 001 Supply Disconnect Switch ON
POR06-VTP-PNL-101
MAIN MAIN ON
Secondary MAIN Secondary MAIN ON
1 GEMS SAMPLE & PUMP CAB. HTRS &
FANS. ACK PAK RELAY ON
2 HT & ISB CAB HTRS & FANS, RCPT
PERISTALTIC PUMP P-004 ON
3 SLC, PANEL VIEW POWER SUP. &
FLOW CONTROL VALVE POWER ON
4 Heat Trace / Flammable Gas Monitor
CAB, Heat Trace / sampler heat trace ON
5 HEAT TRACE, SEAL POT
CONDENSATE LINE ON
6 PLC Control Circuit (MOD 8)/VFO-001 ON
7 CNTRL & ALARM CAB HTRS/FANS &
MDL9 ON
8
Air monitor VAC Pumps AND SAMPLE
LINE/SAMPLE RETURN LINE HEAT
TRACE
ON
(Continued on Next Page)
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
28 of 42
Checklist 2 – Initial Electrical Lineup (Cont.)
(Sheet 2 of 2)
POR06-VTP-CP-105
EXHAUSTER CONTORL PANEL
Component # Description Position Check
() Initials Date
POR06-VTP-
HS-103
Exhaust Fan 001 Off/Enable Hand Switch OFF
POR06-VTP-
HS-102
Glycol Pump 001 ON/OFF HAND SWITCH OFF
POR06-VTP-
HS-105
CONT PNL 105 AND ENCLOSURE 107
SUMMER/WINTER CONTROL SWITCH
WINTER
OFF
SUMMER (1)
SS-102 Exhauster CAM Sample Pumps Selector
Switch
Auto
POR06-VTP-ENCL-104
HEAT TRACE CABINET
POR06-VTP-
HS-104
ENCLOSURE 104 AND SUMMER/WINTER
CONTROL SWITCH
WINTER
OFF
SUMMER
(1)
Seal Pot Enclosure
P-004 Seal Pot Pump Power Cord Unplugged
(1) PERFORM the following according to ambient Temperature:
- IF ambient temperature is, or is anticipated to be less than or equal to 40 F, POSITION
POR06-VTP-HS-104 and POR06-VTP-HS-105 to WINTER.
- IF ambient temperature is anticipated to remain greater than 40 F and less than or equal to 70 F,
POSITION POR06-VTP-HS-104 and POR06-VTP-HS-105 to OFF.
- IF ambient temperature is, or is anticipated to be greater than 70 F, POSITION
POR06-VTP-HS-104 and POR06-VTP-HS-105 to SUMMER.
- INDICATE switch position by circling appropriate position in POSITION column
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
29 of 42
Checklist 3 – Initial Valve Lineup
(Sheet 1 of 3)
Valve # Description Position Check
() Initials Date
POR06-VTP-V-101 POR06-VTP-PDT 170 HI SIDE ISO OPEN
POR06-VTP-V-102 POR06-VTP-PDT 170 LO SIDE ISO OPEN
POR06-VTP-V-103 POR06-VTP-PDT 170 EQUALIZING ISO CLOSED
T111-WST-V-006 BREATHER FILTER BALL VALVE OPEN
T111-VT-V-014 T111-VT-PDI-001 INLET DRAIN CLOSED
T111-VT-V-015 T111-VT-PDI-001 OUTLET DRAIN CLOSED
T111-VT-V-005 RISER 002
ISOLATION VALVE OPEN
T111-VT-V-011 T111-VT-PDI-001 OUTLET ISOLATION VALVE OPEN
T111-VT-V-010 T111-VT-PDI-001 INLET ISOLATION VALVE OPEN
POR06-VTP-V-135 PRI VENT EXHAUST TRAIN INLET
ISOLATION VALVE OPEN
POR06-VTP-V-136 PRI VENT EXHAUST TRAIN OUTLET
ISOLATION VALVE OPEN
T111-VT-V-009 CONDENSATE DRAIN RISER ISOLATION VALVE OPEN
T111-VT-V-007 DEMISTER 001 CONDENSATE DRAIN ISOLATION
VALVE OPEN
T111-VT-V-008 DEMISTER 001 ISOLATION BUTTERFLY VALVE OPEN
T111-VT-V-001 DEMISTER 001 ISOLATION BUTTERFLY VALVE OPEN
T111-VT-V-002 DEMISTER 001 OUTLET ISOLATION VALVE OPEN
T111-VT-V-003 DEMISTER 002 OUTLET ISOLATION VALVE OPEN
T111-VT-V-004 DEMISTER 002 INLET ISOLATION VALVE OPEN
T111-WST-V-103 POR06-VTP-PDT-170 Isolation Valve off T111-WST-
RISER-003 OPEN
(Continued on Next Page)
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
30 of 42
Checklist 3 – Initial Valve Lineup (Cont.)
(Sheet 2 of 3)
*Valve # Description Position Check
() Initials Date
EXHAUSTER POR06 SKID VALVES
POR06-VTP-V-137 PDT 177 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-138 PDT 177 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-139 PDT 177 EQUALIZING ISOLATION VALVE CLOSED
POR06-VTP-V-140 PDT 178 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-141 PDT 178 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-142 PDT 178 EQUALIZING ISOLATION VALVE CLOSED
POR06-VTP-V-143 PDT 180 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-144 PDT 180 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-145 PDT 180 EQUALIZING ISOLATION VALVE CLOSED
POR06-VTP-V-146 PDT 181 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-147 PDT 181 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-148 PDT 181 EQUALIZING ISOLATION VALVE CLOSED
POR06-VTP-V-149 PDT 182 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-150 PDT 182 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-151 PDT 182 EQUALIZING VALVE CLOSED
POR06-VTP-V-158 VENT TRAIN EXHAUST FAN DRAIN VALVE CLOSED
POR06-VTP-V-153 FE 184 HI SIDE ISO (on stack) OPEN
POR06-VTP-V-154 FE 184 LO SIDE ISO (on stack) OPEN
POR06-VTP-V-155 FT 184 HI SIDE ISOLATION VALVE OPEN
POR06-VTP-V-156 FT 184 LO SIDE ISOLATION VALVE OPEN
POR06-VTP-V-157 FT 184 EQUALIZING ISOLATION VALVE CLOSED
POR06-VTP-V-162 SEAL POT 001 FUNNEL ISOLATION VALVE CLOSED
POR06-VTP-V-161 SEAL POT 001 OVERFLOW ISOLATION VALVE OPEN
POR06-VTP-V-160 SEAL POT SIGHT GLASS ISOLATION VALVE OPEN
POR06-VTP-V-163 SEAL POT PUMP 004 RETURN ISOLATION
VALVE CLOSED
POR06-VTP-V-164 SEAL POT PUMP004 SUCTION ISOLATION
VALVE CLOSED
(Continued on Next Page)
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
31 of 42
Checklist 3 – Initial Valve Lineup (Cont.)
(Sheet 3 of 3)
***Valve # Description Position Check
() Initials Date
EXHAUSTER POR06 SKID VALVES
POR06-VTP-V-165 SEAL POT PUMP ENCLOSURE DRAIN LINE VALVE CLOSED
POR06-VTP-V-166 SEAL POT PUMP 004 DISCH TO TANK ISOLATION
VALVE CLOSED
POR06-VTP-V-171 GRAVITY ISOLATION (DRAIN) VALVE SEALPOT OPEN
POR06-VTP-V-172 SEAL POT PUMP DISCHARGE ISOLATION VALVE CLOSED
POR06-VTP-V-167 IN SAMPLE PORT CLOSED*
POR06-VTP-V-168 SEAL POT CONDENSATE DRAIN
OPEN to
SEAL
POT**
POR06-VTP-V-169 POR06-VTP-LT 195 HI SIDE ISO OPEN
POR06-VTP-V-170 POR06-VTP-LT 195 LO SIDE ISO OPEN
POR06-VTP-V-201 GLYCOL PUMP 001 SUCTION ISOLATION VALVE OPEN
POR06-VTP-V-202 GLYCOL PUMP 001 DISCHARGE ISOLATION
VALVE OPEN
POR06-VTP-V-204 GLYCOL TANK 001 DRAIN VALVE CLOSED
POR06-301-VTP-ENCL SAMPLE CABINET
POR06-VTP-V-301 FLOW CONTROL VALVE 301 ISOLATION VALVE OPEN
POR06-VTP-V-302 FLOW CONTROL VALVE 302 ISOLATION VALVE OPEN
POR06-VTP-ENCL-302 PUMP CABINET
POR06-VTP-V-304 SAMPLE VACUUM PUMP 301 VACUUM BYPASS
VALVE CLOSED
POR06-VTP-V-305 SAMPLE VACUUM PUMP 301 OUTLET ISOLATION
VALVE OPEN
POR06-VTP-V-307 SAMPLE VACUUM PUMP 302 VACUUM BYPASS
VALVE CLOSED
POR06-VTP-V-308 SAMPLE VACUUM PUMP 302 OUTLET ISOLATION
VALVE OPEN
POR06-VTP-V-309 GEMS SAMPLE LINE CONDENSATE DRAIN CLOSED
POR06-VTP-V-310 GEMS SAMPLE RETURN LINE CONDENSATE CLOSED
Special Instructions:
* Valve may be open to support sampling of stack emissions. Valve should remain closed all other times.
** Valve has two positions, SEAL POT or DRAIN.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
32 of 42
Checklist 4 – Initial Thermostat temperatures
Instrument # Location Inside/Outside Temperature
Setting Initials Date
Initial set up of POR06-VTP-ENCL-301 thermostats
POR06-VTP-TS-301A POR06-VTP-ENCL-301 Outside 70 F *
POR06-VTP-TS-301 POR06-VTP-ENCL-301 Inside 80 F *
POR06-VTP-TS-303 POR06-VTP-ENCL-301 Inside 115 F *
Initial set up of POR06-VTP-ENCL-302 thermostats
POR06-VTP-TS-302A POR06-VTP-ENCL-302 Outside 60 F *
POR06-VTP-HTR-302 POR06-VTP-ENCL-302 Inside Max *
POR06-VTP-TS-302 POR06-VTP-ENCL-302 Inside 70 F *
POR06-VTP-TS-304 POR06-VTP-ENCL-302 Inside 115 F *
POR06-VTP-TS-305 POR06-VTP-ENCL-302 Inside 115 F *
Initial set up of POR06-VTP-ENCL-104 thermostats
POR06-VTP-TS-104 POR06-VTP-ENCL-104 Outside 75 F *
POR06-VTP-HTR-104 POR06-VTP-ENCL-104 Inside Max *
POR06-VTP-TS-001 POR06-VTP-ENCL-104 Outside 40 F *
Initial set up of POR06-VTP-ENCL-105 thermostats
POR06-VTP-TS-105 POR06-VTP-CP-105 Outside 75 F *
Initial set up of POR06-VTP-ENCL-106 thermostats
POR06-VTP-TS-106 POR06-VTP-ENCL-106 Outside 75 F *
POR06-VTP-HTR-106 POR06-VTP-ENCL-106 Inside Max *
Initial set up of POR06-VTP-ENCL-107 thermostats
POR06-VTP-TS-107 POR06-VTP-ENCL-107 Outside 75 F *
POR06-VTP-HTR-107 POR06-VTP-ENCL-107 Inside Max *
Comments
Special Instructions:
* Temperatures may be changed from the temperature setting at the direction of the Shift Manager/OE
Record the directed temperature setting in the comments section.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
33 of 42
Checklist 5 – Short Term Shutdown Valve Lineup
Valve # Description Position Initials Date
POR06-VTP-V-135 PRI VENT EXHAUST TRAIN INLET
ISOLATION VALVE CLOSED
POR06-VTP-V-136 PRI VENT EXHAUST TRAIN OUTLET
ISOLATION VALVE OPEN
POR06-VTP-V-158 VENT TRAIN EXHAUST FAN DRAIN OPEN
T111-VT-V-005 T111-WST-RISER 002
ISOLATION VALVE OPEN *
T111-WST-V-103 POR06-VTP-PDT-170 Isolation Valve off T111-WST-
RISER-003 OPEN
POR06-VTP-V-161 SEAL POT 001 OVERFLOW ISOLATION VALVE OPEN
POR06-VTP-V-171 SEAL POT GRAVITY DRAIN ISOLATION VALVE OPEN
T111-VT-V-009 CONDENSATE DRAIN RISER ISOLATION VALVE OPEN
Special Instructions: * May be left open per direction of Shift Manager/OE.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
34 of 42
Checklist 6 – Final Shutdown Valve Lineup
Valve # Description Position Initials Date
POR06-VTP-V-135 PRI VENT EXHAUST TRAIN INLET
ISOLATION VALVE OPEN
POR06-VTP-V-136 PRI VENT EXHAUST TRAIN OUTLET
ISOLATION VALVE CLOSED
POR06-VTP-V-158 VENT TRAIN EXHAUST FAN DRAIN VALVE OPEN **
POR06-VTP-V-160 SEAL POT SIGHT GLASS ISOLATION VALVE CLOSED
POR06-VTP-V-161 SEAL POT 001 OVERFLOW ISOLATION VALVE OPEN
POR06-VTP-V-162 SEAL POT 001 FUNNEL ISOLATION VALVE CLOSED
POR06-VTP-V-305 SAMPLE VACUUM PUMP 301 OUTLET ISOLATION
VALVE CLOSED
POR06-VTP-V-308 SAMPLE VACUUM PUMP P-302 OUTLET CHECK CLOSED
POR06-VTP-V-309 GEMS SAMPLE LINE CONDENSATE DRAIN CLOSED
POR06-VTP-V-310 GEMS SAMPLE RETURN LINE CONDENSATE DRAIN CLOSED
T111-VT-V-005 T111-WST-RISER 002 ISOLATION VALVE OPEN
T111-WST-V-006 BREATHER FILTER BALL VALVE OPEN
POR06-VTP-V-171 SEAL POT GRAVITY DRAIN ISOLATION VALVE CLOSED
POR06-VTP-V-172 SEAL POT PUMP DISCHARGE ISOLATION VALVE CLOSED
POR06-VTP-V 301 FLOW CONTROL VALVE 301 ISOLATION VALVE CLOSED
POR06-VTP-V-302 FLOW CONTROL VALVE 302 ISOLATION VALVE CLOSED
POR06-VTP-V-169 POR06-VTP-LT 195 HI SIDE ISO CLOSED
POR06-VTP-V-170 POR06-VTP-LT 195 LO SIDE ISO CLOSED
T111-VT-V-009 CONDENSATE DRAIN RISER ISOLATION VALVE OPEN
T111-WST-V-103 POR06-VTP-PDT-170 Isolation Valve off T111-WST-
RISER-003 CLOSED
Special Instructions:
*Upon Final shutdown an ECN shall be generated to place a cap upon the stack.
** POR-VTP-V-158 is to be closed once stack is capped.
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
35 of 42
Checklist 7 – Final Shutdown Electrical Lineup
Component # Description Position Initials Date
POR06-VTP-
DS-101 PORTABLE EXHAUSTER SKID POWER ON
POR06-VTP-DS-
102
EXHAUST FAN MOTOR 001 SUPPLY
DISCONNECT SWITCH OFF
POR06-VTP-
DS-201 Glycol Heater 001 SUPPLY Disconnect Switch OFF
POR06-VTP-PNL-101
MAIN MAIN ON
Secondary MAIN Secondary MAIN ON
1 GEMS SAMPLE & PUMP CAB. HTRS& FANS.
ACK PAK RELAY ON
2 HT & ISB CAB HTRS & FANS, RCPT
PERISTALIC PUMP P-004 OFF
3 SLC, PANEL VIEW POWER SUP. & FLOW
CONTROL VALVE POWER ON
4 Heat Trace / Flammable Gas Monitor CAB, Heat Trace /
sampler heat trace OFF
5 HEAT TRACE, SEAL POT CONDENSATE LINE OFF
6 PLC Control Circuit (MOD 8)/VFO-001 OFF
7 CNTRL & ALARM CAB HTRS/FANS & MDL9 OFF
8 Air monitor VAC Pumps AND SAMPLE LINE/SAMPLE
RETURN LINE HEAT TRACE OFF
Control Cabinet (CP-105)
POR06-VTP-
HS-103 Exhaust POR06-Fan Off/Enable Hand Switch OFF
POR06-VTP-HS-
102 Glycol Pump OFF
POR06-VTP-
HS-105 ENCL-107/CP105 Summer/Winter Control Switch OFF
Intrinsic Barrier Heat Trace Cabinet (ENCL-104)
POR06-VTP-
HS-104 ENCL-104 Summer/Winter Control Switch OFF
Seal Pot Enclosure
P-004 Seal Pot Pump Power Cord Unplugged
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
36 of 42
Data Sheet 1 – Startup POR06 (Stack 296-P-45) Initial Readings
Instrument Limit Normal
Range Reading
POR06-VTP-FI-184 (**)
(Stack Flow) N/A 226-474 SCFM SCFM
POR06-VTP-LI-195 (**)
(Seal Pot Level Yokogawa) N/A 35 to 75% %
Glycol Level (****)
LG-201 or LI-205 N/A 40% YES / NO
POR06-VTP-PDI-170 (**)
(Plenum Pressure) N/A -0.4 to -3.2 in. Wg in WG
POR06-VTP-PDI-177 (**)
(Heater Diff Pressure) N/A 0.0 to 1.3 in Wg in WG
POR06-VTP-PDI-178 (**)
(Pre-Filter Diff Pressure) N/A 0 to 1.3 in Wg
in WG
POR06-VTP-PDI-180 (**)
(Filter #1 Diff Pressure) 0.1 5.9 0.4 to 4.0 in Wg
in WG
POR06-VTP-PDI-182 (**)
(Filter #2 Diff Pressure) 0.1 4.0 0.4 to 3.0 in Wg
in WG
POR06-VTP-PDI-181 (**)
(Filter #1 + Filter #2 Diff Pressure) 0.1 5.9 0.4 to 4.0 in Wg
in WG
POR06-VTP-TI-179 (**)
(1st HEPA Inlet Temperature) 200 F 45 to 120F F
POR06-VTP-TI-183 (**)
(Stack Inlet Temperature) N/A 45 to 120F F
POR06-VTP-TI-176 (**)
(Inlet Temperature) N/A 45 to 100F F
Subtract TI-176 From TI-183
If not 20F, proceed to Step 5.5.2 N/A 20F F
Special Instructions:
Exhauster may take up to one-hour of operation for heater temperature differential to reach 20 F.
** Reading from exhauster Human Machine Interface (HMI).
*** IF moisture other than precipitation is identified, NOTIFY Shift Manager/OE.
**** Reading may be read from HMI, OR local sight glass (POR06-VTP-LG-201).
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
37 of 42
Data Sheet 1 – Startup POR06 (Stack 296-P-45) Initial Readings (Cont.)
INSTRUMENT LIMIT NORMAL
RANGE READING
Visual Emissions from Stack Present? ***** N/A NO Visual Emissions
(Circle One) Y / N
T111-VT-PDI-001
T111-VT-DMST-001
T111-VT-DMST-002
Diff Pressure
N/A 0.2 to 2.0 in Wg
in WG
Visually inspect Seal Pot drain line. N/A No leaks ***
()
***
Visually Inspect Check duct work, HEPA Housing, fan
and flex connections and stack
IF UN-SAT, REQUEST Shift Manager to notify
Environmental On-Call List.
N/A Satisfactory ***
()
***
/
Signature Print (First and Last) Operator
Date Time
Special Instructions: ** Reading from exhauster Human Machine Interface (HMI).
*** IF moisture other than precipitation is identified, NOTIFY Shift Manager.
**** Reading may be read from HMI or Glycol level, local sight glass (LG-201).
***** IF there are visible emissions observed coming from the stack, REQUEST Shift Manager to notify
Environmental.
/ /
Signature Print (First and Last) Date
Shift Manager
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
38 of 42
Comments Page 1
(This page may be reproduced as necessary) Record any comments below encountered during performance of procedure.
Date: ____________
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
39 of 42
Figure 1 – T-111 Flow Diagram (ECN-14-000844 Sh 7)
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
40 of 42
Figure 2 - Exhauster Flow Diagram (H-2-829116)
NOTE: All instruments are prefixed with “POR06-VTP-“
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
41 of 42
Figure 3 – Exhauster Sample Cabinet Flow Diagram
REC SAMPLE
FILTER
AMS-4 CAM
FCV-301
FCV-302
V-301
V-302
V-309
V-306
V-303
V-304
V-305
V-307
V-308
P-301
P-302
ENCL-301 ENCL-302
RETURN TO STACK
V-310
RE-301
EX
HA
US
T S
TA
CK
Operate POR06 Exhauster
Type
CONTINUOUS Document No.
TO-060-045 Rev/Mod
B-8 Release Date
05/10/2018 Page
42 of 42
Signature Sheet 1
(This page may be reproduced as necessary)
All personnel performing this procedure that will be initialing and signing procedure shall enter their printed name, signature,
and initials below.
NAME (PRINT (First and Last)) SIGNATURE INITIALS