t MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS
PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
TAKLIMAT KEPADA JAWATANKUASA PILIHAN KHAS MENGENAI PROJEK
LYNAS ADVANCED MATERIAL PLANT (LAMP)
OLEH : HAJAH HAMIZA BINTI HAMZAH
PENGARAH PERANCANGAN PEMBANGUNAN MAJLIS PERBANDARAN KUANTAN
PELAN-PELAN YANG DI LULUSKAN OLEH MAJLIS PERBANDARAN KUANTAN
1. PELAN KEBENARAN MERANCANG
2. PELAN INFRASTRUKTUR
3. PELAN BANGUNAN
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
t
PELAN KEBENARAN MERANCANG
TARIKH KELULUSAN : 05 JUN 2008
NAMA JURURANCANG : ARAH RANCANG SDN BHD
KOMPONEN PEMBANGUNAN : KILANG DAN PEJABAT
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
KELUASAN : 250 EKAR
TARIKH PERMOHONAN : 22 JANUARI 2008
PELAN BANGUNAN DAN FASA PEMBANGUNAN
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
t
PELAN INFRASTRUKTUR
TARIKH KELULUSAN : 18 FEBRUARI 2008
NAMA JURUTERA : RANHILL WORLEY SDN BHD
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
TARIKH KELULUSAN : 24 APRIL 2012
NAMA JURUTERA : MECIP GLOBAL ENGINEERS SDN BHD
KELULUSAN PERTAMA
KELULUSAN KEDUA
TARIKH PERMOHONAN : 29 DISEMBER 2011
PELAN BANGUNAN
NAMA ARKITEK : ARKITEK PUNCA CIPTA
FASA PEMBANGUNAN : 6 FASA
TARIKH KELULUSAN : 27 OGOS 2008 - 23 JANUARI 2009
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
022 21/10/2011 MAINTENANCE WORKSHOP
(14)dlm.MPK./R/B:PB/110/2008-H
037 18/07/2011
TNB SUBSTATION (10)dlm.MPK./R/B:PB/69/2008-H
048 SITE ADMINISTRATION BUILDING
(19)dlm.MPK./R/B:PB/108/2008-H
214
10/02/2012
WASTE GAS TREATMENT PLANT
(18)dlm.MPK./R/B:PB/97/2008-H
321 WASTE GAS TREATMENT PLANT
(15)dlm.MPK./R/B:PB/96/2008-H
360 WASTE & LUBE OIL SHED (STORE)
(7)dlm.MPK./R/B:PB/6-141/2008-H
481 WIDE AREA NETWORK (WAN HUT)
(19)dlm.MPK./R/B:PB/95/2008-H
PE
MB
AN
GU
NA
N U
TIL
ITI
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
261
21/10/2011
SECONDARY LEACHING SUBSTATION BUILDING
(12)dlm.MPK./R/B:PB/118/2008-H
271 OPERATION CONTROL ROOM & AMENITIES
BUILDING
340 WATER & RESIDUE SUBSTATION
350 BIO TREATMENT CONTROL ROOM & AMENITIES
BUILDING
044
10/02/2012
CHEMICAL STORE
222 SECONDARY LEACHING
238 KEROSINE SULFONATE
241 MAGNESIA STORAGE
FA
SA
1
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
262 21/10/2011
UPSTREAM EXTRACTION SUBSTATION BUILDING
(14)dlm.MPK./R/B:PB/143/2008-H
410 OFF PLOT SUBSTATION
016
--/05/2012
GATE HOUSE (A)
231 UPSTREAM EXTRACTION
312 FILTRATE PRESS
314 FLOCCULANT PREPARATION
FA
SA
2
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
263
21/10/2011
DOWNSTREAM EXTRACTION SUBSTATION
(11)dlm.MPK./R/B:PB/163/2008-H
264 POST TREATMENT SUBSTATION
273 SOLVENT EXSTRACTION CONTROL ROOM
274 PRODUCT FINISH CONTROL ROOM &
AMENITIES BUILDING
031
--/05/2012
PRODUCT STORE
235 DOWNSTREAM EXTRACTION
240 POST TREAMENT
CALCINATION 246
FA
SA
3
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
025
10/02/2012
COMPRESS AIR SHED
(12)dlm.MPK./R/B:PB/194/2008-H
STEAM GENERATION 026
GATE HOUSE 046
GATE HOUSE 047
211/110 CONCENTRATE HANDLING
212 CONCENTRATE CRACKING
221 PRIMARY LEACHING
FA
SA
4
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
039
10/02/2012
PROCESS WATER PLAN
(17)dlm.MPK./R/B:PB/99/2008-H
PORTABLE WATER SYSTEM PLANT
083
FOAM STATION 249
NAOH CAUSTIC SODA TANK FARM 252
253 H2S04
254 HCL TANK FARM
310 HDS
311/313 LIME NEUTRALISATION PLAN/WASTE
PHOSPHORIC ACID NEUTALIZATION
FA
SA
5
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
027
10/02/2012
PROCESS AND FIRE WATER STORAGE
(15)dlm.MPK./R/B:PB/98/2008-H
COOLING TOWER 029
PIPE RACK NORTH AND SOUTH
070 FA
SA
6
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
SIJIL PERAKUAN SIAP DAN PEMANTUAN (CCC) AKAN DIKELUARKAN OLEH PIHAK
ARKITEK (PSP) IAITU ARKITEK PUNCA CIPTA
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
top related