t MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS
PROJEK LYNAS ADVANCED MATERIALS PLANT (LAMP)
TAKLIMAT KEPADA JAWATANKUASA PILIHAN KHAS MENGENAI PROJEK
LYNAS ADVANCED MATERIAL PLANT (LAMP)
OLEH : HAJAH HAMIZA BINTI HAMZAH
PENGARAH PERANCANGAN PEMBANGUNAN MAJLIS PERBANDARAN KUANTAN
-
PELAN-PELAN YANG DI LULUSKAN OLEH MAJLIS PERBANDARAN KUANTAN
1. PELAN KEBENARAN MERANCANG
2. PELAN INFRASTRUKTUR
3. PELAN BANGUNAN
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
t
PELAN KEBENARAN MERANCANG
TARIKH KELULUSAN : 05 JUN 2008
NAMA JURURANCANG : ARAH RANCANG SDN BHD
KOMPONEN PEMBANGUNAN : KILANG DAN PEJABAT
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
KELUASAN : 250 EKAR
TARIKH PERMOHONAN : 22 JANUARI 2008
-
PELAN BANGUNAN DAN FASA PEMBANGUNAN
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
t
PELAN INFRASTRUKTUR
TARIKH KELULUSAN : 18 FEBRUARI 2008
NAMA JURUTERA : RANHILL WORLEY SDN BHD
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
TARIKH KELULUSAN : 24 APRIL 2012
NAMA JURUTERA : MECIP GLOBAL ENGINEERS SDN BHD
KELULUSAN PERTAMA
KELULUSAN KEDUA
TARIKH PERMOHONAN : 29 DISEMBER 2011
-
PELAN BANGUNAN
NAMA ARKITEK : ARKITEK PUNCA CIPTA
FASA PEMBANGUNAN : 6 FASA
TARIKH KELULUSAN : 27 OGOS 2008 - 23 JANUARI 2009
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
022 21/10/2011 MAINTENANCE WORKSHOP
(14)dlm.MPK./R/B:PB/110/2008-H
037 18/07/2011
TNB SUBSTATION (10)dlm.MPK./R/B:PB/69/2008-H
048 SITE ADMINISTRATION BUILDING
(19)dlm.MPK./R/B:PB/108/2008-H
214
10/02/2012
WASTE GAS TREATMENT PLANT
(18)dlm.MPK./R/B:PB/97/2008-H
321 WASTE GAS TREATMENT PLANT
(15)dlm.MPK./R/B:PB/96/2008-H
360 WASTE & LUBE OIL SHED (STORE)
(7)dlm.MPK./R/B:PB/6-141/2008-H
481 WIDE AREA NETWORK (WAN HUT)
(19)dlm.MPK./R/B:PB/95/2008-H
PE
MB
AN
GU
NA
N U
TIL
ITI
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
261
21/10/2011
SECONDARY LEACHING SUBSTATION BUILDING
(12)dlm.MPK./R/B:PB/118/2008-H
271 OPERATION CONTROL ROOM & AMENITIES
BUILDING
340 WATER & RESIDUE SUBSTATION
350 BIO TREATMENT CONTROL ROOM & AMENITIES
BUILDING
044
10/02/2012
CHEMICAL STORE
222 SECONDARY LEACHING
238 KEROSINE SULFONATE
241 MAGNESIA STORAGE
FA
SA
1
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
262 21/10/2011
UPSTREAM EXTRACTION SUBSTATION BUILDING
(14)dlm.MPK./R/B:PB/143/2008-H
410 OFF PLOT SUBSTATION
016
--/05/2012
GATE HOUSE (A)
231 UPSTREAM EXTRACTION
312 FILTRATE PRESS
314 FLOCCULANT PREPARATION
FA
SA
2
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
263
21/10/2011
DOWNSTREAM EXTRACTION SUBSTATION
(11)dlm.MPK./R/B:PB/163/2008-H
264 POST TREATMENT SUBSTATION
273 SOLVENT EXSTRACTION CONTROL ROOM
274 PRODUCT FINISH CONTROL ROOM &
AMENITIES BUILDING
031
--/05/2012
PRODUCT STORE
235 DOWNSTREAM EXTRACTION
240 POST TREAMENT
CALCINATION 246
FA
SA
3
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
025
10/02/2012
COMPRESS AIR SHED
(12)dlm.MPK./R/B:PB/194/2008-H
STEAM GENERATION 026
GATE HOUSE 046
GATE HOUSE 047
211/110 CONCENTRATE HANDLING
212 CONCENTRATE CRACKING
221 PRIMARY LEACHING
FA
SA
4
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
039
10/02/2012
PROCESS WATER PLAN
(17)dlm.MPK./R/B:PB/99/2008-H
PORTABLE WATER SYSTEM PLANT
083
FOAM STATION 249
NAOH CAUSTIC SODA TANK FARM 252
253 H2S04
254 HCL TANK FARM
310 HDS
311/313 LIME NEUTRALISATION PLAN/WASTE
PHOSPHORIC ACID NEUTALIZATION
FA
SA
5
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
FASA AREA TARIKH PEMERIKSAAN
NAMA BANGUNAN NO FAIL KELULUSAN
027
10/02/2012
PROCESS AND FIRE WATER STORAGE
(15)dlm.MPK./R/B:PB/98/2008-H
COOLING TOWER 029
PIPE RACK NORTH AND SOUTH
070 FA
SA
6
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
SIJIL PERAKUAN SIAP DAN PEMANTUAN (CCC) AKAN DIKELUARKAN OLEH
PIHAK
ARKITEK (PSP) IAITU ARKITEK PUNCA CIPTA
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)
-
MESYUARAT KEDUA JAWATANKUASA PILIHAN KHAS PROJEK LYNAS ADVANCED
MATERIALS PLANT (LAMP)