Summer 2015 Construction Projects
Lake Whatcom Watershed
Water quality improvements for Lake Whatcom
Water quality improvements
=An investment in…
Healthy, affordable drinking water
Cleaner water is less costly to treat
Protection for Lake Whatcom Cleaner water helps ensure a community treasure for future generations
Welcome! Please take your time to view our
displays.
EXAMPLE
DISPLAY…
View project displays
around the room
Northshore Drive RetrofitConstruction June 1–Sept 30
1
Project area: Northshore Drive from Britton Road to
city limits
Project benefit: Reduces pollution from 15 acres (70
properties) by 85%
Red = Project areaYellow = Drainage area
Huntington/Shepardson Retrofit
Construction June 1–Sept 302
Project area: Huntington and Shepardson streets
between Silver Beach Ave. and E. North St.
Project benefit: Reduces pollution in runoff from 12 acres (50 properties) by
85%.
Red = Project areaYellow = Drainage area
Academy RetrofitConstruction June 1–September 30
3
Project area: Northshore Dr. between Academy and Silver
Beach St.
Project benefit: Reduces pollution from 76 acres.
Hag
gin
Rd
..
N. Shore
Dr.Academy Rd.
Toad
Lake
Rd
.
Red = Project areaYellow = Drainage area
Bloedel Donovan RetrofitConstruction June 1–July 30
4
Project area: Shoreline and sidewalks near the beach at Bloedel Donovan Park.
Project benefit: Reduces pollution from 5 acres of
public land by 90%.
Red = 2015 Project areaBlue = 2014 Project areaYellow = Drainage area
Homeowner Water Quality Projects
What can a project do for you? Solve landscaping and
drainage issues Increase property value Gain compliance for future
improvements
What resources are available to you?
Receive financial reimbursement of up to $6,000
Receive technical assistance with project design & implementation
5
Lake Whatcom WatershedWater Quality Improvements Map
6Currently constructed water quality facilities
Contact our staff: now or later
Bill Reilly Stormwater Managerbreilly@cob.org
Kerry EastwoodEducation & Outreachkmeastwood@cob.org
Eli MackiewiczEngineering Technicianemackiewicz@cob.org
Larry Scholten, P.E.Project Engineerljscholten@cob.org
Look for staff around the room…
Kirk Christensen, P.E.Stormwater Managerkchriste@co.whatcom.wa.usMelissa Gehrmann, P.E.Project Engineermgehrman@co.whatcom.wa.usEmily HegartyEducation & Outreacheehegarty@cob.org
Gina Austin, P.E., MSCEProject Engineergaustin@cob.org