Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom
10

Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Jan 18, 2016

Download

Documents

Hillary Nelson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Summer 2015 Construction Projects

Lake Whatcom Watershed

Water quality improvements for Lake Whatcom

Page 2: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Water quality improvements

=An investment in…

Healthy, affordable drinking water

Cleaner water is less costly to treat

Protection for Lake Whatcom Cleaner water helps ensure a community treasure for future generations

Page 3: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Welcome! Please take your time to view our

displays.

EXAMPLE

DISPLAY…

View project displays

around the room

Page 4: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Northshore Drive RetrofitConstruction June 1–Sept 30

1

Project area: Northshore Drive from Britton Road to

city limits

Project benefit: Reduces pollution from 15 acres (70

properties) by 85%

Red = Project areaYellow = Drainage area

Page 5: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Huntington/Shepardson Retrofit

Construction June 1–Sept 302

Project area: Huntington and Shepardson streets

between Silver Beach Ave. and E. North St.

Project benefit: Reduces pollution in runoff from 12 acres (50 properties) by

85%.

Red = Project areaYellow = Drainage area

Page 6: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Academy RetrofitConstruction June 1–September 30

3

Project area: Northshore Dr. between Academy and Silver

Beach St.

Project benefit: Reduces pollution from 76 acres.

Hag

gin

Rd

..

N. Shore

Dr.Academy Rd.

Toad

Lake

Rd

.

Red = Project areaYellow = Drainage area

Page 7: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Bloedel Donovan RetrofitConstruction June 1–July 30

4

Project area: Shoreline and sidewalks near the beach at Bloedel Donovan Park.

Project benefit: Reduces pollution from 5 acres of

public land by 90%.

Red = 2015 Project areaBlue = 2014 Project areaYellow = Drainage area

Page 8: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Homeowner Water Quality Projects

What can a project do for you? Solve landscaping and

drainage issues Increase property value Gain compliance for future

improvements

What resources are available to you?

Receive financial reimbursement of up to $6,000

Receive technical assistance with project design & implementation

5

Page 9: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Lake Whatcom WatershedWater Quality Improvements Map

6Currently constructed water quality facilities

Page 10: Summer 2015 Construction Projects Lake Whatcom Watershed Water quality improvements for Lake Whatcom.

Contact our staff: now or later

Bill Reilly Stormwater [email protected]

Kerry EastwoodEducation & [email protected]

Eli MackiewiczEngineering [email protected]

Larry Scholten, P.E.Project [email protected]

Look for staff around the room…

Kirk Christensen, P.E.Stormwater [email protected] Gehrmann, P.E.Project [email protected] HegartyEducation & [email protected]

Gina Austin, P.E., MSCEProject [email protected]