Agenda
• Review of current and upcoming notable Outages-
–October/November/December
• Unscheduled outages
• North System
• South System
• South Louisiana System
• EEC 2019
• Contacts3
Disclaimers
• Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary.
• Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time).
• Scheduled dates are subject to change.
• Projects may be added, altered, delayed or cancelled.
• SNG will provide notice of such additions or changes via Southern’s electronic bulletin board postings.
• Dates as posted on the EBB should be deemed correct in the event of conflicts between the EBB posted dates and dates within this presentation.
4
Color Key for Maps• Yellow
– Restrictions are possible
– With extended duration, restrictions could be necessary from time to time
– Lower than normal pressures may be experienced
– Meter(s) affected are noted with (PIN #)
• Red
– Restrictions are probable
5
Southern Natural Gas Pipeline
LA
MS
AL
GA
FL
Enterprise
White Castle
Bear Creek
Muldon
Chattanooga
Atlanta
Thomaston
Albany
Elba
SCAiken
North System
South Louisiana
South System
6
Compressor Station
Storage Field
LNG
Pearl River
Franklinton
GwinvilleLogansport
Bienville
Onward
Pickens
Rankin
Toca
Shady Side
Louisville
Bay SpringsYork
GallionSelma Elmore
Auburn
Holy Trinity
Pavo
Reform
McConnells
Providence
Tarrant
Pell City DeArmanville
Bell Mills
Rome
Ellerslie
Ocmulgee
Hall Gate
Wrens
Hartwell
Riceboro
Brookman
Southern Natural Gas PipelineUnscheduled Outage Update
LA
MS
AL
GA
FL
Enterprise
White Castle
Bear Creek
Muldon
Chattanooga
Atlanta
Thomaston
Albany
Elba
SCAiken
North System
South Louisiana
South System
7
Compressor Station
Storage Field
LNG
Pearl River
Franklinton
Gwinville
Logansport
Bienville
Onward
Pickens
Rankin
Toca
Shady Side
Louisville
Bay Springs
York
GallionSelma Elmore
Auburn
Holy Trinity
Pavo
ReformMcConnells
Providence
Tarrant
Pell CityDeArmanville
Bell Mills
Rome
Ellerslie
Ocmulgee
Hall Gate Wrens
Hartwell
Riceboro
Brookman
Unanticipated leak on the SS 28 line in Segment 340. SNG
will not be able to accept receipts. Reference notice of Force Majeure 703716 posted
on 9-16-19
Unscheduled unit outages at Gallion compressor station.Seg. 440 capacity of 2,283 Mdth/d reduced up to 25
Mdth/d RTS TBD
SNG North SystemMaint. Review Oct./Nov./Dec.
LA
MS
AL
GA
Logansport
Bienville
Bear Creek Storage
Onward
Pickens
Rankin
Louisville
Muldon Storage
Reform
McConnells
Providence
TarrantPell City
DeArmanville
Bell Mills
Rome
Compressor Station
Storage Field
Huntsville
Chattanooga
Atlanta
8
Southern will be conducting other general maintenance during this period
AL
P/L maintenance Bessemer Calera line and loop one at a
time the last of October.
Pigging Bessemer Calera loop l ine(37079) 11-5-19 &
11-6-19
Maintenance at Bienville compressor station 11-20-19
SNG South System Maint. Review October/November/December
MS
AL
GA
Enterprise
Gwinville
Selma
Auburn
Ellerslie
Thomaston
Ocmulgee
Hallgate
Wrens
Elmore
York
Gallion
Bay Springs
Compressor Station
Storage Field
LNG
Atlanta
Elba
Hartwell
Aiken
Holy Trinity
Albany
Pavo
9
Brookman
Riceboro
Southern will be conducting other general maintenance during this period
Remediation on SML east of Ocmulgee 11-17-19 to
11-23-19 in Seg. 560.
Remediation SMLL east of Auburn-10-21-19 to 10-29-19
Seg. 460 cap. Of 1,943 Mdth/d reduced up to 250 Mdth/d
Sta. Maint. At Gwinville 10-8-19 to 11-11-19
Segment 410 capacity of 1,658 Mdth/d reduced up
to 270 Mdth/d up to 11-1-19. From 11-1-19 seg. 410 cap. of 1,802
Mdth/d reduced up to 414 Mdth/d
IT & OOP could be impacted Remediation SMLL east of Ellerslie
11-9-19 to 11-16-19. Seg. 490 cap. Of 1,663 Mdth/d reduced up to 139
Mdth/d. Seg. 530 cap. Of 900 Mdth/d reduced up to 57 Mdth/d
Unit Maint. At Auburn 11-11-19 to 12-06-19
Seg. 460 capacity of 2,075 Mdth/d reduce up to 181
Mdth/d
Remediation SML east of Selma-10-30-19 to 11-8-19
Seg. 460 cap. Of 2,373 Mdth/d reduced up to 233 Mdth/d until 11-1-19. After 11-1-19 Seg. 460 cap. Of 2,415 Mdth/d reduced up to 275
Mdth/d.
SNG South Louisiana System Maint. Review Oct./Nov./Dec.
Shadyside
White Castle
Franklinton
Toca
Gwinville
LAMS
Compressor Station
Storage Field
West Leg
East Leg
10
Pearl River
Southern will be conducting other general maintenance during this period
White Castle and Shadyside unit maintenance
9-1-19 to 10-31-19Segment 350 capacity of 701 Mdth/d impacted as much as
100 Mdth/d
SNG North SystemMaint. Review remainder of year
LA
MS
AL
GA
Logansport
Bienville
Bear Creek Storage
Onward
Pickens
Rankin
Louisville
Muldon Storage
Reform
McConnells
Providence
TarrantPell City
DeArmanville
Bell Mills
Rome
Compressor Station
Storage Field
Huntsville
Chattanooga
Atlanta
11
Southern will be conducting other general maintenance during this period
AL
SNG South System Maint. Review Remainder of the year
MS
AL
GA
Enterprise
Gwinville
Selma
Auburn
Ellerslie
Thomaston
Ocmulgee
Hallgate
Wrens
Elmore
York
Gallion
Bay Springs
Compressor Station
Storage Field
LNG
Atlanta
Elba
Hartwell
Aiken
Holy Trinity
Albany
Pavo
12
Brookman
Riceboro
Southern will be conducting other general maintenance during this period
SNG South Louisiana System Maint. review Remainder of year
Shadyside
White Castle
Franklinton
Toca
Gwinville
LAMS
Compressor Station
Storage Field
West Leg
East Leg
13
Pearl River
Southern will be conducting other general maintenance during this period
Gas Control Contacts • Reese Hart – Manager
(713) – 420 – 4774 (office)(832) – 248-2937 (cell)Maurice_hartIII@kindermorgan.com
• Kal Dankovich – Outage Coordinator (724) – 662 – 6451 (office) (205) - 533 - 4795 (cell)
kalman_dankovich@kindermorgan.com
• Jimmy Reese – Lead Controller (713) – 420 – 7310 (office)
jimmy_reese@kindermorgan.com
• Daniel Mitchell – Lead Controller (713) – 420 – 5874 (office)
daniel_mitchell@kindermorgan.com