Southern Natural Gas Company, LL.C. a Kinder Morgan operated company July 5,2017 eunoti ol Sotey EiwirowMRtoi EnteroiBWt (BSEE) RECEIVED JUL 182017 Office of Fieid Operat»ons Pipetine Section U.S. Department ofthe Interior Bureau of Safety Environmental Enforcement Pipeline Section MS: GE 1035A 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 RE: Application for Proposed Abandonment in Place 12" inch Right-of-Way Pipeline Segment No, 8323, OCS-G10064 Originating in Main Pass Block 116 Platform B, OCS-G03419, Receiving Main Pass Biock 59, 26" inch SSTI, OCS-G08461, Offshore, Texas, OCS Federal Waters, GOM To: Angie Gobert, In accordance with the regulations contained in Title 30 CFR, Subpart J, Part §250.1010, High Point Gas Transmission, LLC - Company #03256 and Southern Natural Gas Company, LLC - Company #00010 respectftilly submits for your review and approval an applicalion for abandonment in place of 67,776 feet of the above referenced pipeline designated as Segment No. 8323, ROW OCS-G 10064 by thc Bureau of Safety and Environmental Enforcement. High Point Gas Transmission, LLC and Southern Natural Gas Company, LLC respectfully requests a departure from the requirements of 30 CFR 250.1751 (b) for pigging the pipeline. In support of this request, the following documents are attached; 1. Decommissioning Application 2. Pay.gov receipt in the amount of $2,170.00 Should you have any questions or need additional information, please contact Jeff Stoolman by phone at (346) 241-3544 or by email at istoolmanfSamericanmidstream.com. Or Kevin Stanley by phone at (346) 241-3434 1 hank you for your consideiation in this matter. Sincerel Normaft Holmes President Southern Natural Gas Company, LLC Vice President - Natural Gas Services and Offshoie Pipelines High Point Gas Transmission, LLC
8

a Kinder Morgan operated company - BSEE Data Center

Nov 04, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: a Kinder Morgan operated company - BSEE Data Center

Southern Natural Gas Company, LL .C. a Kinder Morgan operated company

July 5,2017

eunoti ol Sotey EiwirowMRtoi EnteroiBWt (BSEE)

R E C E I V E D JUL 182017

Office of Fieid Operat»ons Pipetine Section

U.S. Department ofthe Interior Bureau of Safety Environmental Enforcement Pipeline Section MS: GE 1035A 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394

RE: Application for Proposed Abandonment in Place 12" inch Right-of-Way Pipeline Segment No, 8323, OCS-G10064 Originating in Main Pass Block 116 Platform B, OCS-G03419, Receiving Main Pass Biock 59, 26" inch SSTI, OCS-G08461, Offshore, Texas, OCS Federal Waters, GOM

To: Angie Gobert,

In accordance with the regulations contained in Title 30 CFR, Subpart J, Part §250.1010, High Point Gas Transmission, LLC - Company #03256 and Southern Natural Gas Company, LLC - Company #00010 respectftilly submits for your review and approval an applicalion for abandonment in place of 67,776 feet of the above referenced pipeline designated as Segment No. 8323, ROW OCS-G 10064 by thc Bureau of Safety and Environmental Enforcement.

High Point Gas Transmission, LLC and Southern Natural Gas Company, LLC respectfully requests a departure from the requirements of 30 CFR 250.1751 (b) for pigging the pipeline.

In support of this request, the following documents are attached; 1. Decommissioning Application 2. Pay.gov receipt in the amount of $2,170.00

Should you have any questions or need additional information, please contact Jeff Stoolman by phone at (346) 241-3544 or by email at istoolmanfSamericanmidstream.com. Or Kevin Stanley by phone at (346) 241-3434

1 hank you for your consideiation in this matter.

Sincerel

Normaft Holmes President Southern Natural Gas Company, LLC

Vice President - Natural Gas Services and Offshoie Pipelines High Point Gas Transmission, LLC

Page 2: a Kinder Morgan operated company - BSEE Data Center

A m e r i c a n M i d s t r e a m

Main Pass 116 B SN-8323

12" Pipeline Decommissioning

Rev.:

DOC;

Date:

Page

DC000##-MP n e ^ ' ' Pipeline ABANDONMENT

19 April 2017

1 of 5

Main Pass 116 "B"

12" Pipeline Abandonment

Amencan Midstream

Doc. No.: DC000## MP 116_12" Pipeline Abandonment

B 10 July 2017 Issued for Permit MD AP

A 19 April 17 Issued for Permit MD AP

REV DATE DESCRIPTION ORIG CLIENT

MP116_12" Pipeline ABN

Page 3: a Kinder Morgan operated company - BSEE Data Center

4 A m e r i c a n M i d s t r e a m

Main Pass 116 B SN-8323

12" Pipeline Decommissioning

Rev.:

DOC:

Date:

Page

DC000##-MP 116_12" Pipeline ABANDONMENT

19 April 2017

3 of 5

I I I . Depressurizing Pipeline (If Necessary)

1. Topside personnel will utilize Mesotech to help identify SSTI location prior to jumping a diver.

2. Diver will handjet as needed to locate and expose the 12" SSVA.

3. If topside crew reports that there is pressure in the line; depressurize the pipeline by:

i . Isolating pipeline SN-8323. Close Valves on any lateral pipelines and main "trunkline". Topside crew shall isolate SN-8323 incoming riser by closing ball valve on top of the riser.

i i . Topside filtration crew shall identify a tie-in connection point on riser to bleed off the line. Topside crew shall run a hose from the tie-in point on the riser to the gas buster on board the filtration vessel.

i i i . Ensure pipeline SN-8323 is isolated and operate SSVA's such that only SN-8323 can be bled off when opening topside valve.

iv. Open ball valve on top of riser. See step i above.

IV. Flushing Operations

1. The dive crew will locate SSVA and uncover to access tie-in point.

2. Diver will install a pollution dome w/hose over the tie-in point blind flange. If the existing blind flange does not have a 2" port, replace with a blind flange w/ 2" port.

3. Install 2" blind equipped with flushing hose on subsea tie-in point. Verify all personnel are ready to begin flushing. When both crews are ready the flushing will begin. (NOTE: If communication is lost between the topside dive crew MP 116 "B" operations will cease until communications are re-established.

4. Uninhibited seawater will be pushed through the pipeline system. The flowrate w i l l be between 3-5 hhls per minute. The flushing hose Mill he equipped with an in line flow meter. The voluine pumped will be recorded every 15 minutes. The DSV will push a minimum of 14220 BBLS or 1.5 times the original volume.

MP116_12" Pipeline ABN

Page 4: a Kinder Morgan operated company - BSEE Data Center

A m e r i c a n M i d s t r e a m

Main Pass 116 B SN-8323

12" Pipeline Decommissioning

Rev.:

DOC:

Date:

Page

DC0O0##-MP 116_12" Pipeline ABANDONMENT

19 April 2017

5 of 5

10. The DSV JOSEPH BISSO will recover the pipe section onto the deck and secure.

11. The divers will install plumber's plugs in the end of the pipeline.

12. The diver will make sure the end of pipe and subsea valve assembly is 3' BML and place a pallet of 3:1 sand/cement on the end of pipe.

13. Diving supervisor and surveyor will record X & Y location of the end of pipeline.

VI. Demobilization

1. This will complete the scope of work.

a. Fill out the Job Completion fonn,

b. Pick up anchors and get underway to next location.

c. Send Survey data and material transfer to PM of any equipment that will be demobilized.

MP116_12" Pipeline ABN

Page 5: a Kinder Morgan operated company - BSEE Data Center

MP58 OCS-G35282

MP59 OCS-G08461

[TTtrCTl M A R I N E PROPOSED ANCHOR LOCATIONS:

DSV JOSEPH BISSO

V = 247.526.35

V - 247,5X2.95

V - 249.X

V = 250.inX.ll

PB X = 2.75.1.928.42

SB X - 2,752.707.9!

SS X = 2,752.X 10.5.1

PS X = 2.754,148.27

SSTI (S-8323/S-3411)

X = 2753406.25 \ = 248697.07

DATI'M; >ADI7 H UMOnbf LARK1 IMt.

PKOJK ii(>\ i uwBn ZONE; I.f>l IM*NA SOITII UMTS: US SURVEV FEET

END CLIENT:

American Midslrciim 91 q Milam St. Houslon. TX 77002

^ A m e r i c a n M i d s t r e a m

Proposed Anchor Plot DSV Joseph Bisso

Main Pass Area Block 59

SSTI (S-3411)

Abandonment of 12" GAS Pipeline

S-8323 Gulf of Mexico

SHEET 2 of 2

Dra«ii By: GAM Datc: 4/24/21117

Efl* Natw: f r 0 p.Ai ic l iorvJH.Mm^MP«_vi t ' : i \R\ HI *.e

LEGEND: ActtM Pipeline ABN or O l T Pipeline

I i i i I T I i i i Scale I " • 1000'

Page 6: a Kinder Morgan operated company - BSEE Data Center

8/17/2017 DEPARTMENT OF THE INTERIOR Mail - Re: Right-of-Way Pipeline Decommissioning - PSN 8323

CONNECT

Pelous, Steven <[email protected]>

Re: Right-of-Way Pipeline Decommissioning - PSN 8323

Kevin Stanley (Contractor) <[email protected]> Tue, Aug 15, 2017 at 8:46 AM To: "[email protected]" <[email protected]> Cc: Jeff Stoolman <[email protected]>, Kendra Sullivan <[email protected]>, Michael Myers <[email protected]>, Andre Parker <[email protected]>

Mr. Pelous,

The reasoning for the requested departure from 30 CFR 250. 1175(b) is because the connection to the 26" mainline is

a top tap tee at a subsea connection and there is no ability for the line being abandoned to run and receive a pig. I

have attached two drawings which I have highlighted to show the pipeline and the connections for visual clarification.

Page - 1

Top right o f t h e page, highlight shows the part o f t he line that will be disconnected and blind installed at the

check valve

Left side of the page, highlighted T is for reference as this is where the pig if ran would become stuck with no

way of retrieval

Circled highlight is for reference to the next page to show connection to the 26" pipeline

Please let us know if you have any other questions or need any additional information

Respectfully,

Kevin Stanley (Contractor)

**lf the matter is urgent or critical in nature, please call my cel l * *

O - 346-241-3585

C - 832-766-1977

[Quoted text hidden]

« MP-116_PSN-8323 Decom.pdf ^ 200K

https://mail.google.com/mail/u/0/?ui=2&ik=d9b932d7a2&jsver=z3kHg2VWLDs.en.&view=pt&msg=15de626de72dc482&q=8323&qs=true&search=quer... 1/1

Page 7: a Kinder Morgan operated company - BSEE Data Center
Page 8: a Kinder Morgan operated company - BSEE Data Center

•»nTS* r i f i i n i ! r i < i ' . " i i » ia i ;a , 'm» i i i «ma i . *un i»v i j r«a i imiw)

M

^ . .Mb .

3 :

iw ..nartMitJiiiat rr U U K ur ewt us «i tsm\t KIIIST < i l t M K n aM ln«tt I H >«ii!t IN«Ma, >t>M t7 <M » » K t m f>m •wtKla'i rratwwuttai I m w . •» >ln1l*> t t f r t j "M Itr t f ^ n i M I I V B mrtHn Mkr ( I M I ,11 u n l n d l M tM • »r«3tntTui ir i»>irt •-. n i t s i a iw . SM<t«i «*«nm> MlMt^ MWrxi pm

i f x w m iii(t>>M M I n iw i« i <Mll*t(n W

%. m t • • •Wf i w m m i > (rMlatl • ! tM t M tttw «MM WWII

r . » . O J A M I

SECTION A A SOUTH raw NATUP

1i6. i» i C*n*«.«> i s f ACT Cui.feoLiueto tto*Mi